Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance AAGNOO VERINAG | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3 L
EMD Value
₹9,000
Closing Date
2 Apr 2026, 6:00 pmClosed
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
DEVELOPMENT OF VDA PARK AT OMON BLOCK VERINAG
2026_RDPR_306731_2
ENIT246of2025-26
Open Tender
Civil Works
Percentage
30 days
ANANTNAG
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
₹9,000
3 Apr 2026
25 Mar 2026
3 Apr 2026
25 Mar 2026
2 Apr 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Dismantling dressed stone work ashlar face stone work, marble work or
precast concrete work manually/by mechanical means including stacking
of serviceable material and disposal of unserviceable material within 50
meters lead as per direction of Engineer-in-charge
In cement mortar | - | Cum | - | - |
| 0.0 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer- in charge 1:3:6 or richer mix (i/c equivalent design mix) | - | Cum | - | - |
| 0.0 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 meters lead.
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil: | - | Kg | - | - |
| 0.0 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil | - | Cum | - | - |
| 0.0 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 mt in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil | - | Cum | - | - |
| 0.0 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand: 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:Cement mortar 1:6 (1 Cement: 6 coarse sand) Quarry including all carriages. | - | Cum | - | - |
| 0.0 | Random Rubble masonry with hard stone in foundation and plinth Including leveling up with cement concrete 1:6:12 (1 Cement: 6 coarse sand: 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:Cement mortar 1:6 (1 Cement: 6 coarse sand) Quarry | - | Cum | - | - |
| 0.0 | Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 ement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete | - | Sqm | - | - |
| 0.0 | Pointing on stone work with cement mortar 1:3 (1 cement: 3 fine sand) flush pointing
wall | - | Sqm | - | - |
| 0.0 | Supplying and filling of earth (including royalty) also including ramming and watering of the earth in layers not exceeding 20 cm. at site (earth measured in stacks will be reduced by 10% for payment | - | Cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_995757.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .