Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical R O VILLAGE P O CHARATGARH TEHSIL DISTT UNA H P | UNA | HIMACHAL PRADESH | 174301 | Accepted-Technical Accepted |
| 2 | Accepted-Technical | Accepted-Technical Accepted |
| 3 | Accepted-Technical | Accepted-Technical Accepted |
| 4 | Accepted-Technical VILLAGE PO GOLI TEHSIL DALHOUSIE DISTT CHAMBA HP | CHAMBA | HIMACHAL PRADESH | 176207 | Accepted-Technical Accepted |
Tender Value
₹8.2 L
EMD Value
₹16,500
Closing Date
10 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer HPPWD Division Tauni Devi.
(SH- C/O C.C. pavement at RD. 0/210 to 0/310, U-shape drain at RD. 0/255 to 0/305 and PCC edge wall in km. 0/550 to 0/565). (Under MMSY)
2026_PWD_147220_7
9091-45 dated 28.10.2026
Open Tender
Civil Works
Percentage
60 days
Tauni Devi
Please refer Tender documents.
17 documents required · 17 mandatory
₹350
₹16,500
17 Nov 2026
4 Nov 2026
11 Nov 2026
4 Nov 2026
10 Nov 2026
4 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m(one point five metre) in width or 10 sqm( ten square metre on plan),including dressing of sides and ramming of bottoms, lift upto 1.5 m, (one point five metre) including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.(fifty metre) as per the direction of the Engineer-in-charge including entire carriage of material within all leads and lifts and other incidentals.The rates are inclusive of ocrtol, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by the Government. | 81.08 | Per Cubic metre | 246 | ₹19,945.68 |
| 2 | Stone soling properly hand packed filling interstices with Kharanja stone and consolidating with power road roller to the requested gradient and camber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP:PWD., specification 100mm(one hundred millimeters) spread thickness ( finished work including materials and labour) in all leads and lifts and dressing of sides and bottom and ,as per direction of Engineer-in-Charge including entire carriage of material within all leads and lifts and other incidentals.The rates are inclusive of ocrtol, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by the Government. | 46.5 | Per cubic metre | 975 | ₹45,337.5 |
| 3 | Providing and laying in cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level 1:1.5:3 (one cement : one point five coarse sand : three graded stone aggregate 20 mm(twenty millimetre) nominal size) as per the direction of Engineer-in-Charge including entire carriage of material within all leads and lifts and other incidents.The rates are inclusive of ocrtol, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by the Government. | 56.25 | Per Cubic metre | 5,424 | ₹3,05,100 |
| 4 | Providing and laying in cement concrete of 1:4:8 (one cement : four coarse sand : eight graded stone aggregate) 40mm ( forty millimetre) nominal size graded stone aggregate for all works upto plinth level including the cost of centering and shuttering including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of ocrtol, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by the Government. | 47.4 | Per cubic metre | 3,983 | ₹1,88,794.2 |
| 5 | Providing weep holes in brick/stone masonry/ plain/ reinforced concrete abutment, wing walls, return walls, retaining walls and breast wall with 110mm( one hundred ten millimeter) dia PVC pipe De-plast/finolex/ vectus pipe having pressure 4kg.per centimeter square. (four kilograme per centimeter square ) extending through the full width of the structures with slopes of I(V): 20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 as per direction of Engineer- in -Charge, including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive of ocrtol, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by the Government. | 28 | Each | 236 | ₹6,608 |
| 6 | Providing and laying in cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level 1:3:6 (one cement: three sand: six graded stone aggregated 20mm (twenty millimeters) nominal size, as per the direction of the Engineer-in-charge including entire carriage of material within all leads and lifts and other incidentals.The rates are inclusive of ocrtol, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by the Government. | 50 | Per cubic metre | 4,200 | ₹2,10,000 |
| 7 | Excavation in hilly areas in all heights and depths and in all kinds of soil by manual/mechanical means including saturated soil comprising of ordinary soil, soft rocks, hard rocks, chiseling/wedging out of rock (where blasting is prohibited) and other intermediate classification of soil setting out true to the required line, grades width cutting and trimming of side slopes and level as shown on the drawing and as directed by the Engineer-in-Charge at site according to the technical specification clause 302,1603.1, 1603.2 as per direction of Engineer- in -Charge, including entire carrriage of material within all leads and lifts and other incidentals . The rates are inclusive of ocrtol, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by the Government. | 175.65 | Per cubic metre | 254 | ₹44,615.1 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.54 MB
BOQ_219777.xls
BOQ • 0.24 MB
Job8_compressed-1.pdf
Tender Documents • 3.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .