Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC | L1 | Accepted-AOC Accepted |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
17 Dec 2024, 11:00 amClosed
SE/MEDC/METTUR
O/o SE/MEDC/METTUR
works for effecting services in various schemes in North Kolathur section in Mettur division
2024_EB_506751_1
SE/MEDC/AEE/MM/MTR/Spec No.033/24-25
Open Tender
Electrical Works
Works
365 days
Mettur EDC
EMD and documents as per BQR conditions
2 documents required · 2 mandatory
₹0
₹10,000
3 Mar 2025
3 Dec 2024
17 Dec 2024
3 Dec 2024
17 Dec 2024
3 Dec 2024
3 Dec 2024 - 17 Dec 2024
Amount
Work contract schedule
Excavation of pole pit upto 27"(8.0)m by using JCB
Excavation of pole pit for 30' RCC pole / 9.00m PSC pole by using JCB or manual
Excavation of stay pit 4.5' to 5' depth by using JCB or manual
Excavation of pole pit at Hard rock requires blasting
Erection of PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
Erection of PSC/ RCC poles/Metal poles above 8.00m by using JCB or maual
Erection of Stay set complete
fixing of HT V cross arm (All type)
fixing of LT 3 phase cross arms
fixing of LT Single phase cross arms
fixing of HT/LT TI Fittings
Fixing of HT pin insulater 22KV
Fixing of HT 11kv strain disc
Fixing of LT pin insulator
Fixing of LT shackle
Fixing of Aluminium Knob
Paving and Stringing of 7/4.09 mm ACSR
Paving and Stringing of 7/3.35 mm ACSR 7/3.0mm AAAC
Paving and Stringing of 7/2.59 mm ACSR 7/2.11mm ACSR
Erection of Double pole transformer structure complete structure inclusive of following works-Excavation of pole pits sizing 2'X2'X 6' erection of pole, erection of base plates,erection of structure materials, erection of AB switch earthing complete
Erection of HVDS Complete inclusive of following works -erection of pole pits sizing 2'X2'X6') for both base plate, erection of structure materisls, erection of AB Switch and HG Fuse, Structure Earthing complete , pole concreating (2'X2'X6') for both base and sleeve including supply
Erection of D.P. Structure with AB Switch, Top Channel, cross bracing ,earthinf,painting , Providing stay including concreating
Erection of New Transformer all capacities (with jumpering)
Loading or unloading of Transformer upto 100 KVA
Transport of poles/Materials/ conductors and other Below 8 Kms (Plains)
Transport of materials conductors and others above 8kms for additional km Irrespective of weight in
Loading of poles (7.5/8.0/9.14m)
UnLoading of poles (7.5/8.0/9.14m)
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Alteration of back clamp
Alteration of stay clamp
Drilling of holes channel onl 3/4 &1" per hole
cutting of flat
cutting of channel
cutting of angle
Dismantling of Double pole transformer structure complete structure
Dismandling of RCC Pole 9.14 mtr RSJ Pole
Dismandling of RCC PSG Pole 8.0 mtr /7.5MTR
Dismandling of V X arm ,Channel x arm guarding x arm ( all type)
Dismandling of LT 3 phase x arm
Dismandling LT Single phase cross arms
Dismandling of HT/LT TI fitting
Dismandling of 11kv strain disc
Dismandling of 22kv pin insulater
Dismandling of LT shackle
Dismandling of LT pin insulator
Dismandling of Aluminium Knob
Erection of street light service
Releasing of single phase service and re-fixing.
Releasing of 3 phase service and (upto 50 HP) re-fixing.
Dismandling of stay set
Dismandling of ACSR 7/3.35MM Conductor
Dismandling of ACSR 7/2.59MM/7/2.11MM Conductor
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .