Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Qualified | Qualified MSE, MII, Category: General |
| 2 | Qualified 40 102 L G F C R PARK NEW DELHI 110019 | NEW DELHI | NEW DELHI | DELHI | 110019 | Qualified MSE, MII, Category: General |
| 3 | Qualified | Qualified MII |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
21 Nov 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
UPS
4001144
GEM/2022/B/2735053
Supply installation of 1 Nos 75KVA 75 KW UPS unit with battery bank,Supply installation of 20KVA 20
60 days
Karnataka; Bengaluru Urban
Total value wise evaluation
BOQ
₹1.4 L
21 Nov 2022
14 Nov 2022
21 Nov 2022
90 days from bid end date (until 19 Feb 2023)
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Supply installation of 1 Nos 75KVA 75 KW UPS unit with battery bank | 1 Nos 75KVA 75 KW UPS unit with battery bank | 2 | Nos | [email protected] | 60 |
| 2 | Supply installation of 20KVA 20KW UPS with unit battery bank | 20KVA 20KW UPS with unit battery bank | 3 | Nos | [email protected] | 60 |
| 3 | Supply of 3TR slim line vertex floor mounting type split air conditioning units | 3TR slim line vertex floor mounting type split air conditioning units | 4 | Nos | [email protected] | 60 |
| 4 | Supply installation of laying of suction and discharge pipe with gas charging copper pipe including electrical wiring and plug points | laying of suction and discharge pipe with gas charging copper pipe including electrical wiring and plug points | 4 | Nos | [email protected] | 60 |
| 5 | Supply of 2TR wall mounting type split air conditioning units | 2TR wall mounting type split air conditioning units | 8 | Nos | [email protected] | 60 |
| 6 | Supply installation laying of suction and discharge pipe with gas charging copper pipe including electrical wiring and plug points | laying of suction and discharge pipe with gas chargingcopper pipe including electrical wiring and plug points | 8 | Nos | [email protected] | 60 |
| 7 | Main incoming cable supply oflaying of 4 runs of 150 sq mm 4 core aluminium UG cable | supply oflaying of 4 runs of 150 sq mm 4 core aluminium UG cable | 120 | Mtrs | [email protected] | 60 |
| 8 | Supply and Installation of main Transformer DG incoming 3 phase 600 amps and 400 amps capacity MCCB distribution and control panel Quantity 2 Nos As per Figure 5 | main Transformer DG incoming 3 phase 600 amps and 400 amps capacity MCCB distribution and control panel Quantity 2 Nos As per Figure 5 | 1 | Nos | [email protected] | 60 |
| 9 | Supply and Installation of UPS outgoing 3 phase MCCB control panel | UPS outgoing 3 phase MCCB control panel | 1 | Nos | [email protected] | 60 |
| 10 | Supply and installation of RAW power outgoing 3 phase SFU unit control panel | RAW power outgoing 3 phase SFU unit control panel | 1 | Nos | [email protected] | 60 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_4001144.pdf
GEM_BID
sow_2022-11-14-10-23-37_9d4c397001a0459c85e13eae5f3417da.pdf
BOQ
boq_item_file_2022-07-21-10-42-25_debad2dfa3553766a_2022-11-14-10-23-37_282755700fa8edc3bdbed14b9e4a76b7.csv
BOQ
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .