Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64,320Accepted-AOC BAROJ ROAD SHAKTI NAGAR COLONY DISTRICT BIJNOR | BIJNOR | BIJNOR | UTTAR PRADESH | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹26.4 L+₹63,327.07 (2.46%)Rejected-Finance MOHALLA LUHARI SARAI NAGINA DISTRICT BIJNOR UTTAR PRADESH | NAGINA | BIJNOR | UTTAR PRADESH | L2 | Rejected-Finance IInd Lowest Amount | |
| 3 | L3₹26.8 L+₹1.1 L (4.19%)Rejected-Finance | L3 | Rejected-Finance IIIrd Lowest Amount |
Tender Value
Refer Docs
EMD Value
₹64,320
Closing Date
23 Mar 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Madhya Ganga Canal Construction division 15 Moradabad 244001
Construction of Janeta Mr from Km 2.650 to Km 3.250 with V.R.B. at Km 2.969 and Fall at Km 2.900 under M.G.C. Stage - II
2021_UPIDC_571629_1
02/EE/2020-21
Open Tender
Civil Works - Canal
Item Wise
90 days
Chandausi
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹64,320
16 Sept 2021
18 Mar 2021
24 Mar 2021
18 Mar 2021
23 Mar 2021
18 Mar 2021
90 days
Amount
Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T&P, leads and lift etc complete as per direction of Engineer-in-charge
Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T&P, all lifts and leads etc. complete as per direction of Engineer-in-charge
Providing and Laying lean concrtet (1:4:8) cement concrete including cost of all materials, labour, T&P, all lifts and leads etc complete as per direction of Engineer-in-charge
Providing first class M-100 brick work in 1:4 CM including cost of all materials, labour, T&P, all lifts and leads etc. for proper completion of work as per direction of Engineer-in-charge
Providing and fixing Centering & shuttering for R.C.C. and C.C. works (form work of concrete) including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work as per direction of Engineer-in-charge
Providing and Laying M-25 (C.C. 1:1:2) cement concrete including cost of all materials, labour, T&P, all lifts and leads etc. complete as per direction of Engineer-in-charge
Providing and Laying R.C.C. 1:1.5:3 cement concrete including cost of all materials, labour, T&P, all lifts and leads etc. complete as per direction of Engineer-in-charge
Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position, all lifts and leads, all labour and T&P etc. complete as per direction of Engineer-in-charge
Providing and fixing of 75 mm dia P.V.C. pipe in proper position for drainage spout including cost of all material, cutting, jointing, labour, T&P, all lifts and leads etc compete as per direction of Engineer-in-charge
Providing struck deep pointing in 1:2 cement mortar including cost of all material, labour, T&P, all lifts and leads etc complete excluding cost of dewatering as per direction of Engineer-in-charge
Providing and fixing of expansion joint with angle iron 75x75x10 mm size, with M.S. flat 32x6 mm, filled with filled with bitumen and stone dust including cost of all material, labour T&P all lifts and leads etc. compete as per direction of Engineer-in-charge.
Providing and painting Bitumen (85/40 grade ) in two coats including cost of all material, T&P, heating, labour all lifts and leads etc compete as per direction of Engineer-in-Charge
Providing and laying of two coats of tar felt including cost of all materials T&P, labour, all lifts and leads etc compete as per direction of Engineer-in-Charge
Earth work in filling or in embankment in ordinary soil, Excavation to be in the form of regular pits and earth work in embankment to be in 20 cm layers including ramming and dressing the surface to be required levels and slopes and also including all lift and lead upto 600 metre. Including cost of earth, all T&P, labour, loading, unloading etc. all complet for proper completion of work as directed by Engineer-in- charge.
Earthwork in removing of Diversion including cost of labour, all T&P, leads and lift etc complete.
Earth work in cutting in ordinary soil for Making Canal with dressing inculding 1.50 m lift and lead up to 30 m including all labour, T&P etc complete.
Providing Brick on Edge pitching including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work.
Providing & Fixing wheel guard of size 150 x 150 x 900
Providing weep holes in abutment & wing walls including supply of all material,labour,T. & P. etc required for proper completion of work as per direction of Engineer-in-charge
LAIQUE AHMAD
ISRAR AHMAD
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .