| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.8 LAccepted-Finance | L1 | Accepted-Finance QUALIFIED FINANCIAL SUMMARY | |
| 2 | L2₹15.8 L+₹1,675 (0.11%)Accepted-Finance | L2 | Accepted-Finance QUALIFIED FINANCIAL SUMMARY | |
| 3 | L3₹15.8 L+₹5,425 (0.34%)Accepted-Finance | L3 | Accepted-Finance QUALIFIED FINANCIAL SUMMARY |
Tender Value
₹15.3 L
EMD Value
₹15,300
Closing Date
27 Mar 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC SPN
KRISHNA NAGAR JAIL ROAD SHAHJAHANPUR
INCREASING CAPACITY OF VARIOUS 10 TO 25 KVA AND 16 TO 25 KVA TRANSFORMERS AND PROPOSED NEW POINT TRANSFORMER UNDER EDD-POWAYAN UNDER EDC SHAHJAHANPUR (MVVNL) UNDER THE HEAD OF SUMMER PLAN PHASE-1
2024_MVVNL_919585_1
124(W)/EDCS/2023-24
Open Tender
Miscellaneous Works
Item Rate
30 days
SHAHJAHANPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
SE EDC
₹15,300
Yes
4 Apr 2024
21 Mar 2024
27 Mar 2024
21 Mar 2024
27 Mar 2024
21 Mar 2024
Amount
INCREASING CAPACITY 10 KVA TO 25 KVA
SAFE CARRIAGE OF FOLLWING CENTRALISED MATERIAL FROM STORE CENTER, BAIBAGH SHAHJAHANPUR TO WORK SITE.
PCC POLE SUPPORT 8.5 METER LONG FROM STORE BYEBAGH TO VARIOUS SITES UNDER EDD JBD INCLUDING LOADING AND UNLOADING BOTH SIDES
25 KVA 11/0.430 KVA 3 PHASE TRANSFORMER
ACSR WEASEL CONDUCTOR
ABC CABLE 3X50+1X35+1X16 SQ MM FROM STORE BYEBAGH TO WORK SITES INCLUDING LOADING AND UNLOADING BOTH SIDES
LT XLPE CABLE 3.5X70 SQMM
Disc insulator 11 KV
PIN INSULATOR
TOP CHANNEL, 125*65*2240
DROPPER CHANNEL100*50*2028 mm
BASE ANGLE (75*75*6*2028)
11 KV MS T OFF CHANNEL
EARTHING
STAY SET
SAFE CARRIAGE OF 3 PHASE D.O FUSE SET FROM STORE BYEBAGH TO VARIOUS SITES FROM BYEBAGH TO SITES
SAFE CARRIAGE OF 11 KV TPMO
ERECTION OF PCC DOUBLE POLE 8.50 METER LONG, AND FIXING OF NECESSARY DOUBLE POLE ACCESSORIES AS PER RESSPO NORMS. (ALL DECENTRALISED MATERIAL WILL BE PROVIDED AND ARRANGED BY THE CONTRACTOR)
MOUNTING OF 25 KVA NEW TRANSFORMER AT NEWLY CONSTRUCTED DOUBLE POLE STRUCTURE INCLUDING FIXING ALL REQUIRED ACCESSORIES, MAKING CONNECTION, ENERGISATION, COMPLETE IN ALL RESPECT. (ALL DECENTRALIZED MATERIAL WILL BE ARRANGED BY THE CONTRACTOR)
LAYING OF LT ABC 3X50+1*35+1*16 SQ MM ON POLE
STRING AND SAGGING OF ACSR WEASEL CONDUCTOR
INSTALLATION OF 3 PHASE D.O. FUSE SET
INSTALLATION OF 11 KV TPMO
AL LUGS 70 SQMM
SAFE CARRAGE OF RECEIVED BACK 10 KVA TF SITE TO STORE
REMOVING ALL OLD CONNECTIONS, UNMOUNTING OF OLD 10 KVA TRANSFORMER
INCREASING CAPACITY 100 KVA TO 250 KVA
SAFE CARRIAGE OF LT CABLE 1X240 MM SQ MM FROM STORE BYEBAGH TO VARIOUS SITES INCLUDING LOADING AND UNLOADING BOTH SIDES
SAFE CARRIAGE OF 3 PHASE D.O FUSE SET FROM STORE BYEBAGH TO VARIOUS SITES FROM BYEBAGH TO SITES
SAFE CARRIAGE OF 250 KVA DTR FROM STORE BYEBAGH TO VARIOUS SITES UNDER INCLUDING LOADING AND UNLOADING BOTH SIDES
CONSTRUCTION OF PLINTH OF SIZE 2.0X2.0X1.5 Mtr. CONSISTING EARTH WORK IN EXCAVATION, C.C. WORK IN RATIO 1:4:8, Ist CLASS BRICK WORKS IN 1:4:6, R.C.C. WORK IN RATIO 1:2:4 AND PLASTER WORK OF 10 MM THICKNESS IN RATIO 1:4.
EARTHING OF DISTRIBUTION TRANSFORMER OF 400/250 KVA BY EARTHING CHEMICAL BY DIGGING / DRILLING OF PIT APPROX 10 FIT (L.S.3 MTR) DEPTH AND INSERTING G.I. PIPE OF 1.25" DIA OF 'B' GRADE AND THEN FILL UP THE CHEMICAL WITH WATER AND COMPLETE TO THE REQUIREMENT. TWO NO. OF EARTHING OF EACH TRANSFORMER ONE FOR THE TRANSFORMER NEUTRAL AND ANOTHER FOR TRANSFORMER BODY, DOUBLE POLE & EQUIPMENT ETC. TO BE DONE. THE TOP OF THE INSERTED PIPE TO BE CONNECTED TO THE NEUTRAL AND TRANSFORMER BODY THROUGH G.I. STRIP WITH THE HELP OF NUT AND BOLT OR BY WELDING AS PER DIRECTION OF THE AUTHORISED REPRESENTATIVE OF THE DEPARTMENT. IT INCLUDES THE COST OF ALL MATERIALS, LABOUR, T&P PROVIDE BY THE CONTRACTOR FOR PROPER COMPLETION OF WORK.
PROPER WIRE MESH FENCING OF 630/400/250 KVA TRANSFORMER ALONGSIDE THE PLINTH. THE HEIGHT OF THE FENCE SHOULD BE 7 FEETS ABOVE FROM GROUND, PROVIDING FABRICATION AND FIXING THE MAIN GATE IN FRONT OF THE PLINTH WITH PROVISION FOR LOCKING SYSTEM. PAINTING OF ENTIRE METAL WORKS/ MAIN GATE WITH WIRE MESH WITH BUS GREEN SUPER ENAMELED PAINT IN TWO COATS ON THE PRIMER COAT OF RED OXIDE. COMPLETE IN ALL RESPECT
REMOVING ALL OLD CONNECTIONS, UNMOUNTING OF OLD 100 KVA TRANSFORMER
MOUNTING OF 250 KVA NEW TRANSFORMER AT NEWLY CONSTRUCTED PLINTH INCLUDING FIXING ALL REQUIRED ACCESSORIES, MAKING CONNECTION, ENERGISATION, COMPLETE IN ALL RESPECT. (ALL DECENTRALIZED MATERIAL WILL BE PROVIDED ARRANGED BY THE CONTRACTOR)
RECEIVED BACK OF OLD 100 KVA TRANSFORMERS FROM VARIOUS WORK SITES TO CENTRAL STORE CENTER, BAIBAGH, SHAJAHANPUR INCLUDING SAFE LOADING AND UNLOADING BOTH SIDE
PROVIDING AND FIXING OF LT TAILLESS UNIT 400 AMP., COMPLETE JOB AS PER RESSPO SPECIFICATION. ( TAILLESS UNIT WILL BE ARRANGED AND PROVIDED BY THE CONTRACTOR.)
PROVIDING AND INSTALLATION OF AI LUGS FOR 240SQ MM CABLE
INSTALLATION OF 3 PHASE D.O. FUSE SET
INCREASING CAPACITY 16 KVA TO 25 KVA
SAFE CARRIAGE OF FOLLWING CENTRALISED MATERIAL FROM STORE CENTER, BAIBAGH SHAHJAHANPUR TO WORK SITE.
PCC POLE SUPPORT 8.5 METER LONG FROM STORE BYEBAGH TO VARIOUS SITES UNDER EDD JBD INCLUDING LOADING AND UNLOADING BOTH SIDES
25 KVA 11/0.430 KVA 3 PHASE TRANSFORMER
ACSR WEASEL CONDUCTOR
ABC CABLE 3X50+1X35+1X16 SQ MM FROM STORE BYEBAGH TO WORK SITES INCLUDING LOADING AND UNLOADING BOTH SIDES
LT XLPE CABLE 3.5X70 SQMM
Disc insulator 11 KV
PIN INSULATOR
TOP CHANNEL, 125*65*2240
DROPPER CHANNEL100*50*2028 mm
BASE ANGLE (75*75*6*2028)
11 KV MS T OFF CHANNEL
EARTHING
STAY SET
SAFE CARRIAGE OF 3 PHASE D.O FUSE SET FROM STORE BYEBAGH TO VARIOUS SITES FROM BYEBAGH TO SITES
SAFE CARRIAGE OF 11 KV TPMO
ERECTION OF PCC DOUBLE POLE 8.50 METER LONG, AND FIXING OF NECESSARY DOUBLE POLE ACCESSORIES AS PER RESSPO NORMS. (ALL DECENTRALISED MATERIAL WILL BE PROVIDED AND ARRANGED BY THE CONTRACTOR)
MOUNTING OF 25 KVA NEW TRANSFORMER AT NEWLY CONSTRUCTED DOUBLE POLE STRUCTURE INCLUDING FIXING ALL REQUIRED ACCESSORIES, MAKING CONNECTION, ENERGISATION, COMPLETE IN ALL RESPECT. (ALL DECENTRALIZED MATERIAL WILL BE ARRANGED BY THE CONTRACTOR)
LAYING OF LT ABC 3X50+1*35+1*16 SQ MM ON POLE
STRING AND SAGGING OF ACSR WEASEL CONDUCTOR
INSTALLATION OF 3 PHASE D.O. FUSE SET
INSTALLATION OF 11 KV TPMO
AL LUGS 70 SQMM
SAFE CARRAGE OF RECEIVED BACK 10 KVA TF SITE TO STORE
REMOVING ALL OLD CONNECTIONS, UNMOUNTING OF OLD 10 KVA TRANSFORMER
NEW POINT 25 KVA
Description (ALL DECENTRALISED MATERIAL (SUCH AS AL. LUGS, GROUTING MATERIAL, FENCING MATERIAL)WILL BE ARRANGED AND PROVIDED BY THE CONTRACTOR.
SAFE CARRIAGE OF FOLLWING CENTRALISED MATERIAL FROM STORE CENTER, BAIBAGH SHAHJAHANPUR TO WORK SITE.
PCC POLE SUPPORT 8.5 METER LONG FROM STORE BYEBAGH TO VARIOUS SITES UNDER EDD JBD INCLUDING LOADING AND UNLOADING BOTH SIDES
25 KVA 11/0.430 KVA 3 PHASE TRANSFORMER
ACSR WEASEL CONDUCTOR
ABC CABLE 3X95+1X70+1X16 SQ MM FROM STORE BYEBAGH TO WORK SITES INCLUDING LOADING AND UNLOADING BOTH SIDES
LT XLPE CABLE 3.5X70 SQMM
THREE PHASE DISTRIBUTION BOX
Disc insulator 11 KV
PIN INSULATOR
TOP CHANNEL, 125*65*2240
DROPPER CHANNEL100*50*2028 mm
BASE ANGLE (75*75*6*2028)
11 KV MS T OFF CHANNEL
EARTHING
STAY SET
SAFE CARRIAGE OF 3 PHASE D.O FUSE SET FROM STORE BYEBAGH TO VARIOUS SITES FROM BYEBAGH TO SITES
ERECTION OF PCC SINGLE POLE 8.50 METER LONG, AND FIXING OF NECESSARY SINGLE POLE ACCESSORIES AS PER RESSPO NORMS. (ALL DECENTRALISED MATERIAL WILL BE PROVIDED AND ARRANGED BY THE CONTRACTOR)
ERECTION OF PCC DOUBLE POLE 8.50 METER LONG, AND FIXING OF NECESSARY DOUBLE POLE ACCESSORIES AS PER RESSPO NORMS. (ALL DECENTRALISED MATERIAL WILL BE PROVIDED AND ARRANGED BY THE CONTRACTOR)
MOUNTING OF 25 KVA NEW TRANSFORMER AT NEWLY CONSTRUCTED DOUBLE POLE STRUCTURE INCLUDING FIXING ALL REQUIRED ACCESSORIES, MAKING CONNECTION, ENERGISATION, COMPLETE IN ALL RESPECT. (ALL DECENTRALIZED MATERIAL WILL BE ARRANGED BY THE CONTRACTOR)
LAYING OF LT ABC CABLE 3X95+1X70+1X16 SQ MM ON POLE
STRING AND SAGGING OF ACSR WEASEL CONDUCTOR
INSTALLATION OF 3 PHASE D.O. FUSE SET
AL LUGS 70 SQMM
CONCRETING OF PCC POLE
PAWAN SHAKTI ENTERPRISES
SHREE BALAJI MAHARAJ
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .