| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 CrAccepted-AOC 304 MAGIZHAMPOO STREET GOMATHIPURAM 6TH MAIN ROAD MADURAI 21 | MADURAI | TAMIL NADU | 625001 | ₹9.8 Cr | L1 | Accepted-AOC L1 CONTRACTOR |
| 2 | L2₹10.3 Cr+₹49.1 L (5.00%)Rejected-Finance HIG 25 80 FEET ROAD ARINGAR ANNA NAGAR MADURAI 625 020 | MADURAI | TAMIL NADU | 625020 | ₹10.3 Cr+₹49.1 L (5.00%) | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹10.0 L
Closing Date
4 Feb 2025, 3:00 pmClosed
ADDITIONAL COLLECTOR (D) MADURAI
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI
Upgradation / Strengthening of 12 nos of Roads in Alanganallur Block of Madurai District under Mudhalvarin Grama Salaigal Membattu Thittam (MGSMT) 2025-26 PHASE I Package no 17
2025_RDTN_521177_17
DIPR/249/Tender/2025
Open Tender
Civil Works
Item Rate
180 days
Alanganallur
Refer tender document
3 documents required · 3 mandatory
₹0
₹10.0 L
26 Feb 2025
29 Jan 2025
4 Feb 2025
31 Jan 2025
4 Feb 2025
31 Jan 2025
Amount
Strengthening and Black Topping Road of Alanganallur to Oomachikulam road to Nedunkulam via Achampatti pirivu Road KM 0/0-1/700 ( R- 191 ) at Alanganallur Panchayat Union
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Supply and fixing of KM stone SI No. 44 A
Supply and fixing of HM stone SI No. 44 A
Povision for Name Board Cum Citizen Board
Metal beam crash Barrier Type - A "W" Double guard
Provision For Sign Boards
(ii) Road Marker/ Road stud with lens Reflector
(iv)a. 60 cm Equilateral triangle cautionary signboard
Strengthening and Black Topping Road of Alagapuri Edayapatti Road KM 0/0-1/000 ( R- 26 ) at Alanganallur Panchayat Union
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Supply and fixing of KM stone SI No. 44 A
Supply and fixing of HM stone SI No. 44 A
Povision for Name Board Cum Citizen Board
Metal beam crash Barrier Type - A "W" Double guard
Provision For Sign Boards
(ii) Road Marker/ Road stud with lens Reflector
(iv)a. 60 cm Equilateral triangle cautionary signboard
Strengthening and Black Topping Road of Muduvarpatti Irattaikulam to salvarpatti Road KM 0/0-1/545 ( R- 196 ) at Alanganallur Panchayat Union
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Supply and fixing of KM stone SI No. 44 A
Supply and fixing of HM stone SI No. 44 A
Povision for Name Board Cum Citizen Board
Provision For Sign Boards
(ii) Road Marker/ Road stud with lens Reflector
(iv)a. 60 cm Equilateral triangle cautionary signboard
Strengthening and Black Topping Road of Muduvarpatti PH to Saranthangi Kiluvamalai Road KM 0/0-1/550 ( R- 197 ) at Alanganallur Panchayat Union
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Supply and fixing of KM stone SI No. 44 A
Supply and fixing of HM stone SI No. 44 A
Povision for Name Board Cum Citizen Board
Provision For Sign Boards
(ii) Road Marker/ Road stud with lens Reflector
(iv)a. 60 cm Equilateral triangle cautionary signboard
Strengthening and Black Topping Road of Kumaram Thandalai Road KM 0/0-1/600 ( R- 17 ) at Alanganallur Panchayat Union
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Supply and fixing of KM stone SI No. 44 A
Supply and fixing of HM stone SI No. 44 A
Povision for Name Board Cum Citizen Board
Metal beam crash Barrier Type - A "W" Double guard
Provision For Sign Boards
(ii) Road Marker/ Road stud with lens Reflector
(iv)a. 60 cm Equilateral triangle cautionary signboard
Strengthening and Black Topping Road of Muduvarpatti to Salvarpatti Road KM 0/0-2/500 ( R- 48 ) at Alanganallur Panchayat Union
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Supply and fixing of KM stone SI No. 44 A
Supply and fixing of HM stone SI No. 44 A
Povision for Name Board Cum Citizen Board
Provision For Sign Boards
(ii) Road Marker/ Road stud with lens Reflector
(iv)a. 60 cm Equilateral triangle cautionary signboard
Strengthening and Black Topping Road of Kolinjipatti to Ramagoundanpatti Road KM 0/0-2/100 ( R- 59 ) at Alanganallur Panchayat Union
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Supply and fixing of KM stone SI No. 44 A
Supply and fixing of HM stone SI No. 44 A
Povision for Name Board Cum Citizen Board
Metal beam crash Barrier Type - A "W" Double guard
Provision For Sign Boards
(ii) Road Marker/ Road stud with lens Reflector
(iv)a. 60 cm Equilateral triangle cautionary signboard
Strengthening and Black Topping Road of Kolinjipatti Gengamuthur Road KM 0/0-0/850 ( R- 97 ) at Alanganallur Panchayat Union
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Supply and fixing of HM stone SI No. 44 A
Povision for Name Board Cum Citizen Board
Metal beam crash Barrier Type - A "W" Double guard
Provision For Sign Boards
(ii) Road Marker/ Road stud with lens Reflector
(iv)a. 60 cm Equilateral triangle cautionary signboard
Strengthening and Black Topping Road of Palamedu road to Kolinjipatti Road KM 0/0-1/000 ( R- 164 ) at Alanganallur Panchayat Union
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Supply and fixing of KM stone SI No. 44 A
Supply and fixing of HM stone SI No. 44 A
Povision for Name Board Cum Citizen Board
Provision For Sign Boards
(ii) Road Marker/ Road stud with lens Reflector
(iv)a. 60 cm Equilateral triangle cautionary signboard
Strengthening and Black Topping Road of Rajakkalpatti Usilampatti Road KM 0/0-1/530 ( R- 70 ) at Alanganallur Panchayat Union
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Supply and fixing of KM stone SI No. 44 A
Supply and fixing of HM stone SI No. 44 A
Povision for Name Board Cum Citizen Board
Provision For Sign Boards
(ii) Road Marker/ Road stud with lens Reflector
(iv)a. 60 cm Equilateral triangle cautionary signboard
Strengthening and Black Topping Road of kodangipatti Parali road to kannati malai Road KM 0/0-0/900 ( R- 182 ) at Alanganallur Panchayat Union
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Supply and fixing of HM stone SI No. 44 A
Povision for Name Board Cum Citizen Board
Metal beam crash Barrier Type - A "W" Double guard
Provision For Sign Boards
(ii) Road Marker/ Road stud with lens Reflector
(iv)a. 60 cm Equilateral triangle cautionary signboard
Strengthening and Black Topping Road of Muduvarpatti GH to Saranthangi Road KM 0/0-1/080 ( R- 119 ) at Alanganallur Panchayat Union
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.
BITUMINOUS MACADAM 50 MM Thick using Plastic waste including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Supply and fixing of KM stone SI No. 44 A
Supply and fixing of HM stone SI No. 44 A
Povision for Name Board Cum Citizen Board
(ii) Road Marker/ Road stud with lens Reflector
(iv)a. 60 cm Equilateral triangle cautionary signboard
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Suganya Constructions (BID ID -1243075)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tenderdocument.pdf
Tender Documents • 0.76 MB
BOQ.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .