| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.1 L+₹27,008 (4.60%)Rejected-AOC 169 MEENAMBIGAI NAGAR 5TH STREET SUBRAMANIAPURAM MADURAI 625 011 | MADURAI | MADURAI | TAMIL NADU | 625011 | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | T. Saravanan L1 | BAVITHRA BUILDERS L2 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3 | 16 | M3 | 211 ₹3,376 Lowest | 220.7 ₹3,531.2 |
| 2.01 | Supplying and filling in foundation and basement with filling M-Sand in layers of 15cum thick well rammed and consolidated including watering complying with std. specification etc. | 11.5 | M3 | 221.8 ₹2,550.7 Lowest | 232 ₹2,668 |
| 3.01 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete. | 3.5 | M3 | 5,669.9 ₹19,844.65 Lowest | 5,930.7 ₹20,757.45 |
| 4.01 | Brick work in CM 1:5 (One cement and five sand) using country bricks of size 8 3/4"X4 1/2"X2" including curing etc., complete For Foundation and Basement. | 3.2 | M3 | 6,719 ₹21,500.8 Lowest | 7,028.1 ₹22,489.92 |
| 5.01 | Brick work in CM 1:5 (One cement and five sand) using country bricks of size 8 3/4"X4 1/2"X2" including curing etc., complete complying with standard specification For Super Structure in GF. | 9.5 | M3 | 6,802.6 ₹64,624.7 Lowest | 7,115.5 ₹67,597.25 |
| 6.01 | Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides) | 26.5 | M2 | 1,123 ₹29,759.5 Lowest | 1,174.7 ₹31,129.55 |
| 7.01 | Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Vertical Portion Only) using steel plates10m2. | 27 | M2 | 4,344.6 ₹1,17,304.2 Lowest | 4,544.5 ₹1,22,701.5 |
| 8.01 | Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Lintel & Sunshade) using steel plates10m2. | 17.5 | M2 | 1,123 ₹19,652.5 Lowest | 1,174.7 ₹20,557.25 |
| 9.01 | Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete in F&B | 9 | M3 | 9,448.9 ₹85,040.1 Lowest | 9,883.5 ₹88,951.5 |
| 10.01 | Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). Below 16mm | 630 | Kg | 93.8 ₹59,094 Lowest | 98.1 ₹61,803 |
Tender Value
₹4.9 L
EMD Value
₹4,922
Closing Date
21 Jul 2025, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai, Thallakulam, Madurai.
Construction of Toilet and stain case arrangement with water supply pipeline arrangements to Vissalakshipuram community hall in in ward no 15
2025_MAWS_579592_1
E1/EST- 449/ 25-26
Open Tender
Civil Works
Lump-sum
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,922
10 Sept 2025
9 Jul 2025
21 Jul 2025
9 Jul 2025
21 Jul 2025
9 Jul 2025
Amount
Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3
Supplying and filling in foundation and basement with filling M-Sand in layers of 15cum thick well rammed and consolidated including watering complying with std. specification etc.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete.
Brick work in CM 1:5 (One cement and five sand) using country bricks of size 8 3/4"X4 1/2"X2" including curing etc., complete For Foundation and Basement.
Brick work in CM 1:5 (One cement and five sand) using country bricks of size 8 3/4"X4 1/2"X2" including curing etc., complete complying with standard specification For Super Structure in GF.
Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides)
Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Vertical Portion Only) using steel plates10m2.
Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Lintel & Sunshade) using steel plates10m2.
Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete in F&B
Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). Below 16mm
Plastering with CM1:5(one cement and five sand) 12mm thick10m2.
Plastering with CM1:3(one cement and five sand) 10mm thick10m2. MDU-CORP-BUILDING DATA-P-37-SL No:36
R.C.C. Jolly by a new of following size in R.C.C. 1:1.5:3 using 20mm gauge hard broken granite stone jelly and rivers and excluding cost of reinforcement but including charges, fabrication charges curing neat finishing and labour charges for fixing the jolly inposition with standard spefication
White washing two coats with freshly burnt shell lime white in colour in all floors including cost of lime and other materials brushes scaffolding charges etc.complete complying with standard specification and as directed. -100sq.m
Painting two coats with ready mixed Plastic Emulsion Paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc ,complete as per standard specification. - 10 sq.m
Supplying and fixing in position White Glazed European Water Closet of best quality and approved make with 100mm 'P' or 'S'' trap with Double flapped rigit P.V.C.seat cover with C.P.brass hinges with 12.5litres PVC Low Level Flushing Tank with all internal fittings etc.,complete complying with standard spoecifications, labour inclusive of fixing low level flushing tank.
Add GST 18%
BAVITHRA BUILDERS (BID ID -1404742)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .