Loading…
Loading…
Tender Value
₹8 L
EMD Value
₹16,000
Closing Date
16 Sept 2026, 4:00 pmDue tomorrow
Executive Engineer RnB Division Budgam
Engineering complex Budgam
Development/Upgradation of Inner Links at Kulbugh and Parnewa
2026_PWDJK_323411_5
NIT_No_75_DB_2026-27
Open Tender
Civil Works
Percentage
30 days
kubugh
Please refer Tender documents.
3 documents required · 3 mandatory
₹300
Executive Engineer RnB Division Budgam
₹16,000
3 Sept 2026
3 Sept 2026
17 Sept 2026
3 Sept 2026
16 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto
1.5 m in -All kinds of soil | 1,725 | sqm | 24.12 | ₹41,607 |
| 2 | Supplying/Laying of RBM/Nallah Muck/khak bajri/Soiling/GSB or any other such materials i/c watering, levelling and consolidation in layers by 08 to 10 tonne capacity road roller to required gradient and camber including all costs and carriages upto site of work,completejob. | 170.5 | cum | 1,000 | ₹1,70,500 |
| 3 | Supplying, stacking,Laying, spreading and compacting stone aggregate of specified sizes( 63 to 45mm) to WBM specifications in uniform thickness,hand picking, including rolling with 3 wheeled road / vibratory roller 8-10tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening ( 13.2mm size) /binding material( stone dust/moorum) to fill up interstices of coarse aggregate,watering and compacting to the required density( finished work shall be paid) with all leads , lifts and carriages as involved upto site of work. All complete job. | 128.5 | cum | 2,700 | ₹3,46,950 |
| 4Construction of R WALL | |||||
| 4.01 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 4.32 | cum | 256.85 | ₹1,109.59 |
| 5 | P/L dry Stone soling duly tightly hand packed and RBM/GSB filling i/c stacking, carriage etc, complete job. | 7.1 | Cum | 1,000 | ₹7,100 |
| 6 | Providing and laying in position cement concrete of specified grade (1:4:8) mix,stone aggregate 40mm nominal size E/c the cost of centring and shuttering - All work upto plinth level. Complete job. | 0.68 | Cum | 5,202.9 | ₹3,537.97 |
| 7 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with,1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) complete job. | 9.88 | Cum | 8,422.45 | ₹83,213.81 |
| 8 | Centring and shuttering including strutting, propping etc and removal of formwork. | 25 | Sqm | 628.95 | ₹15,723.75 |
| 9Carriage of different materils by M.T upto site of work . | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_1088286.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .