Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹24.3 CrAdmitted-Finance AT 601 SAHID NAGAR BHUBANESWAR 751007 | BHUBANESWAR | KHORDHA | ODISHA | 751007 | L1 | Admitted-Finance | ||
| 2 | L2₹33.0 Cr+₹8.8 Cr (36.1%)Admitted-Finance PLOT NO GA 62 GAYATRI VIHAR PATIA BHUBANESWAR 751024 | BHUBANESWAR | KHORDHA | ODISHA | 751024 | L2 | Admitted-Finance |
Tender Value
₹30.3 Cr
EMD Value
₹30.3 L
Closing Date
20 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHIEF ENGINEER OPHWC
OPHWC BHUBANESWAR
Building Work
2026_OSPHW_144240_2
17/OPHWC/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
450 days
Gajapati
Please refer Tender documents
3 documents required · 3 mandatory
₹11,800
₹30.3 L
Yes
OPHWC BHUBANESWAR
26 Nov 2026
31 Oct 2026
21 Nov 2026
31 Oct 2026
20 Nov 2026
31 Oct 2026
31 Oct 2026 - 4 Nov 2026
5 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | MIS-CVL-BRIDGESAFE | - | - | - | - |
| 2 | 50000021
6mm thick cement plaster in cement mortar 1:4 (1 cement:4 sand) to R.C.C surfaces finished smooth including closed deep chipping and slurry treatment with necessary scaffolding, curing etc. all complete at all depth and height for inside and outside surfaces.
Ground Floor | 130.24 | SQM | 212.47 | ₹27,672.09 |
| 3 | 50010470
Cutting, bending, binding and placing in position of reinforcement steel for R.C.C. work including the cost of 16 S.W.G. binding wire, steel, labour tools etc. Steel Brand:-SAIL/VIZAG/TATA TISCON/RINL/JINDAL STEEL(PANTHER)/Shyam Steel.
Ground Floor | 10.31 | QTL | 8,934.54 | ₹92,115.11 |
| 4 | 50010584
Providing and Priming one coat of approved wall primer over exterior work to give an even shade including scaffolding and cleaning the surface before application etc. complete. Exterior cement based wall primer of premium quality Exterior Primer :- ASIAN PAINTS (Trucare exterior-WT)/ BERGER (Walmasta Primer)/DULUX (Professional exterior sealer-E900)
Ground Floor | 130.24 | SQM | 83.86 | ₹10,921.93 |
| 5 | 50010596
Providing and Painting two coats of Anti-fungal weather coat, water proofing paint including scaffolding and cleaning the surface before application. [NSWI] Weather Coat :- ASIAN PAINTS (ULTIMA PROTEK) / BURGER (LONG LIFE-7 FLEXO) / and DULUX (PROFESSIONAL WEATHER SHIELD ELASTOMERIC).
Ground Floor | 130.24 | SQM | 134.8 | ₹17,556.35 |
| 6 | 50011592
Providing and laying in position R.C.C. M-25 grade concrete using 20 mm nominal size HBG down graded chips for reinforced cement concrete work using cement content as per approved design mix, having continuous agitated mixer, mix design of specified grade for reinforced cement concrete work,<(>,<)> including the cost of Rigid and smooth centering and shuttering using ply, levelled works and dismentalling then after casting at all depth and height, cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability.Without cost of reinforcement (FOR RCC COLUMNS)
Ground Floor | 0.86 | CUM | 18,236.87 | ₹15,683.71 |
| 7 | 50011676
Providing and laying in position R.C.C. M-25 grade concrete using 20 mm nominal size HBG down graded chips for reinforced cement concrete work using cement content as per approved design mix, having continuous agitated mixer, mix design of specified grade for reinforced cement concrete work, including the cost of Rigid and smooth centering and shuttering using ply, levelled works and dismentalling then after casting at all depth and height, cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability. Without cost of reinforcement(FOR RCC FLOOR BEAMS).
Ground Floor | 4.72 | CUM | 15,796.04 | ₹74,557.31 |
| 8 | MIS-CVL-BRIDGETOMO | - | - | - | - |
| 9 | 50000003
Providing and laying plain cement concrete 1:4:8 (1 cement: 4 sand: 8 stone aggregate 40mm nominal size) as levelling course in foundation and plinth etc. including tempering, curing, shuttering etc. complete at all depth and height.
Ground Floor | 971.72 | CUM | 5,417.74 | ₹52,64,526.31 |
| 10 | 50000017
Supplying of filling sand in foundation and plinth including watering, ramming, consolidating and dressing, labours, tools all complete.
Ground Floor | 971.72 | CUM | 859.31 | ₹8,35,008.71 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
DTCN2.pdf
Tender Documents • 1.47 MB
BOQ_615468.xls
BOQ • 1.44 MB
CORRIGENDUM2.pdf
Additional Documents • 0.37 MB
PLANELEVATION.pdf
PDF • 36.95 MB
SITEPHOTO.pdf
PDF • 0.10 MB
PREBIDMINUTES.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .