Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-Finance | ₹4.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹4.5 L+₹357.67 (0.08%)Rejected-Finance NEAR APHIM KOTHI SITAKUND WARD HATHIYANALA SULTANPUR UTTAR PRADESH | ₹4.5 L+₹357.67 (0.08%) | L2 | Rejected-Finance L2 |
| 3 | L3₹4.5 L+₹5,767.49 (1.29%)Rejected-Finance UTTAR PRADESH | ₹4.5 L+₹5,767.49 (1.29%) | L3 | Rejected-Finance L3 |
Tender Value
₹5.0 L
EMD Value
₹10,100
Closing Date
26 Mar 2026, 2:00 pmClosed
B.D.O.
SADAR BLOCK GHAZIPUR
GRAM PANCHAYAT TAJPUR MEIN COMPOSIT VIDHYALAY TAJPUR MEIN BOUNDRY WALL NIRMAN KARYA
2026_RDUP_1126433_48
1960/E-TENDER/2025-26 DATE 11.03.2026
Open Tender
Civil Works
Fixed-rate
90 days
SADAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
B.D.O.
₹10,100
Yes
30 Mar 2026
18 Mar 2026
26 Mar 2026
18 Mar 2026
26 Mar 2026
18 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil including lift up to 1.5m and lead up to 30m and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation tranches or into the plinth and revoval and disposal of surplus earth and diracted by the engineer in charge up to a distance of 30m from the foundation tranches including all T&P S.I.No. 251 | 83.23 | CUM | 130 | ₹10,819.9 |
| 2 | Concrete with 4 cm gauge brixk ballast, sand of 1.25 F.M. and cement in propoation of 12:6:1 in foundation and under floors including supply of all materials labour and tools and plants etc required for proper completion for the work S.I. No. 273 | 10.06 | CUM | 4,060 | ₹40,843.6 |
| 3 | M-150 brick work in 1:4 cement and course sand of 1.25 fineness modulour mortar in foundation and plinth including supply of all meterial, labour and tools and plants. Etc required for proper completion of work S.I. No.305 | 43.48 | CUM | 5,450 | ₹2,36,966 |
| 4 | R.C.C work with cement approved coarse sand and 2cm Gauge approved stone ballast in the proportion of 1:2:4 in foundation and footing excluding its fixing and binding the same wih 24B.W.G.G.I binding wire and including necessary centering and shuttering etc and also including S/o all materials required for proper completion of the work. Binding wire to the supplies by the contractor free of cost S.I. No. 284 | 7.81 | SQM | 8,750 | ₹68,337.5 |
| 5 | Mild steel in R.C.C work cutting bending and binding i/c all completed work | 6.13 | QTL | 6,350 | ₹38,925.5 |
| 6 | 12mm thick plaster with cement mortar consisting of 1 part cement and 4 part of sand of 1.25 fineness modulus mortar. Minimum thickness not be less than 10mm including supply of all materials, labour and T&P etc. required for proper completion of the work S.I. No. 584 | 280 | SQM | 165 | ₹46,200 |
| 7 | S/F signboard or lokarpan stone | 1 | JOB | 5,000 | ₹5,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_2101553.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_2101553.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .