Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.4 LAccepted-AOC | L1 | Accepted-AOC work done | |
| 2 | L2₹27.6 L+₹22,483.44 (0.82%)Rejected-Finance | L2 | Rejected-Finance SECOND LOWEST | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical NONE | NEW DELHI | DELHI | 110001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical FLAT 1 21 A P SEN ROAD CHARBAGH LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Nirmala Singh L1 | MANORAMA CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00C.C. Lining work | |||||
| 1.01 | Bed Scrapping of Internal section of Main Canal with Including All Material Labour T & P Complete in all respect | 1,903.4 | M2 | 13,799.65 ₹13,799.65 Lowest | 13,799.65 ₹13,799.65 Lowest |
| 1.02 | Preparation of Subgrade for lining Work with Including All Material Labour T & P Complete in all respect | 1,903.4 | M2 | 32,357.8 ₹32,357.8 Lowest | 32,357.8 ₹32,357.8 Lowest |
| 1.03 | Earth Work in digging foundation with Including All Material Labour T & P Complete in all respect | 306.54 | M3 | 30,654 ₹30,654 Lowest | 30,654 ₹30,654 Lowest |
| 1.04 | Sand filling in foundation with Including All Material Labour T & P Complete in all respect | 189.88 | M3 | 1,90,259.76 ₹1,90,259.76 | 1,89,880 ₹1,89,880 Lowest |
| 1.05 | Centring and shuttering for cc work with Including All Material Labour T & P Complete in all respect | 352.94 | M2 | 2,58,352.08 ₹2,58,352.08 Lowest | 2,58,352.08 ₹2,58,352.08 Lowest |
| 1.06 | CC work 1:2:4 (10-20mm stone grit) in bed slope and toe wall with Including All Material Labour T & P Complete in all respect | 218.21 | M3 | 17,87,358.11 ₹17,87,358.11 Lowest | 17,87,358.11 ₹17,87,358.11 Lowest |
| 1.07 | Floating Neat Cement with Including All Material Labour T & P Complete in all respect | 1,903.4 | M2 | 2,24,601.2 ₹2,24,601.2 Lowest | 2,24,601.2 ₹2,24,601.2 Lowest |
| 1.08 | Earth Work in back filling in required canal section area with Including All Material Labour T & P Complete in all respect | 12.28 | M3 | 343.84 ₹343.84 Lowest | 343.84 ₹343.84 Lowest |
| 1.09 | Laying LDPE polythene under plaster with Including All Material Labour T & P Complete in all respect | 1,903.4 | M2 | 1,57,982.2 ₹1,57,982.2 | 1,54,175.4 ₹1,54,175.4 Lowest |
Tender Value
₹27.6 L
EMD Value
₹56,000
Closing Date
8 Oct 2025, 5:00 pmClosed
Executive Engineer Minor Lift Canal Division Jnp
Executive Engineer Minor Lift Canal Division Jaunpur
C.C. Lining in main canal reach 2.693 Km. to 3.000 at Jagdishpur Pump canal
2025_UPIDM_1074619_1
03/E.E./2025-26(LOT-01)
Open Tender
Civil Works
Item Rate
40 days
Executive Engineer Minor Lift Canal Division Jnp
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹56,000
23 Sept 2026
22 Sept 2025
9 Oct 2025
22 Sept 2025
8 Oct 2025
22 Sept 2025
C.C. Lining work
Bed Scrapping of Internal section of Main Canal with Including All Material Labour T & P Complete in all respect
Preparation of Subgrade for lining Work with Including All Material Labour T & P Complete in all respect
Earth Work in digging foundation with Including All Material Labour T & P Complete in all respect
Sand filling in foundation with Including All Material Labour T & P Complete in all respect
Centring and shuttering for cc work with Including All Material Labour T & P Complete in all respect
CC work 1:2:4 (10-20mm stone grit) in bed slope and toe wall with Including All Material Labour T & P Complete in all respect
Floating Neat Cement with Including All Material Labour T & P Complete in all respect
Earth Work in back filling in required canal section area with Including All Material Labour T & P Complete in all respect
Laying LDPE polythene under plaster with Including All Material Labour T & P Complete in all respect
Filling construction joint by max fault 43% coarse sand 55% asbestes powder 2%including cost of labour and T&P
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .