Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹53.2 LAccepted-Finance | 1 | Accepted-Finance Technically Financially Responsive |
| Sl No | Description | Qty | Unit | RANJIT KUMAR DAS L1 |
|---|---|---|---|---|
| 1.00Earthwork- Excavation & Backfilling | ||||
| 1.01 | Earth work for excavation of foundations, pipe trenches, valve chambers, thrust blocks, etc. in all kinds of ordinary soils such as murum, sand, sandy silt, clay, kankar etc. or in combination. Excavation shall include the removal of WBM roadway surfaces, brick surfacing, including dressing, compaction of the bottoms of the excavation, shoring and strutting wherever required, dewatering whenever required, removal of the excavated soil, stockpiling and disposal of surplus excavated soil off-site as directed by the Employer's Representative.
0.0 TO 1.5 M Depth from GL | 312.78 | Cum | 201 ₹62,868.78 Lowest |
| 1.02 | Earth work for excavation of foundations, pipe trenches, valve chambers, thrust blocks, etc. in all kinds of ordinary rock, Excavation shall include the removal of asphalt and concrete road surfacing, including dressing, compaction of the bottoms, shoring and strutting wherever required, dewatering whenever required, removal of the excavated rock, stockpiling and disposal of surplus excavated rock off-site as directed by the Employer's Representative.
0.0 to 1.5 m depth from GL | 75.2 | Cum | 603 ₹45,345.6 Lowest |
| 1.03 | Earth work for excavation of foundations, pipe trenches, valve chambers, thrust blocks, etc. in all kinds of hard rock (blasting prohibited), Excavation shall include dressing, compaction of the bottoms, shoring and strutting wherever required, dewatering whenever required, removal of the excavated rock, stockpiling and disposal of surplus excavated rock off-site as directed by the Employer's Representative.
0.0 to 1.5 m depth from GL | 101.6 | Cum | 2,500 ₹2,54,000 Lowest |
| 1.04 | Backfilling of pipe trenches, foundations, etc. with approved graded excavated soil (select granular material), excluding rock, including placing in layers not exceeding 20 cm in depth each, and compacting each layer, complete as per the specification and as directed by the Employer's Representative. | 148.18 | Cum | 200 ₹29,636 Lowest |
| 1.05 | Providing and backfilling excavated pipeline trench with crusher dust including watering, ramming, consolidating using portable vibratory compactor and dressing complete as per drawing, specifications around pipe and as well as above pipe and as per the instructions of the Employer's representative. | 275.19 | Cum | 1,500 ₹4,12,785 Lowest |
| 2.00PIPELINES, SPECIALS AND APPURTENANCES | ||||
| 2.01 | Supplying all types of MS Specials plain ended, socket ended and flanged as required with internal lining and external coating as per the specification, such as bends, tees, tapers, spool pieces, blind flanges, pieces for pipe connection, valve connections, dismantling joints, anchor bolts, straps, air vent pipe, etc. of different diameters, manufactured from Fe 410 grade steel. This item includes loading, transportation to the project site, unloading and stacking, etc. complete with cost of third party inspection, material, labor, taxes and duties. | 1.2 | MT | 1,40,000 ₹1,68,000 Lowest |
| 2.02 | Handling, aligning, laying and jointing MS pipes and specials to correct line and level in trenches. The item includes transportation of pipes and specials from the store yard to the project site, stacking of pipe as per BIS requirements, loading, unloading, hoisting, lowering, marginal cutting and grinding wherever necessary, assembling, jointing, providing temporary supports, lining and coating at joints etc. for pipe of the following diameters and thicknesses. The rate also shall include radiography of field joints, field testing, etc. as specified and shown on the drawings and specification.
200 mm ID 5 mm thick | 350 | Metre | 350 ₹1,22,500 Lowest |
| 2.03 | Handling, aligning, laying and jointing to correct line and level MS pipes and specials etc. in trenches for Extra Joints less than 4m length (for 100mm to 600mm dia MS pipe) | 224 | Per inch dia | 320 ₹71,680 Lowest |
Tender Value
₹54.2 L
EMD Value
₹1.1 L
Closing Date
10 Aug 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
MD GMDWSB
Office of the Managing Director GMDWSB Dr Bhupen Hazarika Path Kharguli Guwahati
Procurement of Works for Pipe Laying Work Connecting from Jal Board Scheme Existing Feeder Main of Lichubagan Reservior to WTP of Zoo Road Water Supply Scheme in the department of office of the Managing Director, GMDWSB
2026_DHUA_53257_1
GJB/IFB/2025/10
Open Tender
Civil Works - Others
Works
guwahati
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,100
₹1.1 L
Yes
Guwahati
3 Nov 2026
29 Jul 2026
10 Aug 2026
29 Jul 2026
10 Aug 2026
5 Aug 2026
29 Jul 2026 - 4 Aug 2026
4 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork- Excavation & Backfilling | |||||
| 1.01 | Earth work for excavation of foundations, pipe trenches, valve chambers, thrust blocks, etc. in all kinds of ordinary soils such as murum, sand, sandy silt, clay, kankar etc. or in combination. Excavation shall include the removal of WBM roadway surfaces, brick surfacing, including dressing, compaction of the bottoms of the excavation, shoring and strutting wherever required, dewatering whenever required, removal of the excavated soil, stockpiling and disposal of surplus excavated soil off-site as directed by the Employer's Representative.
0.0 TO 1.5 M Depth from GL | 1 | Cum | 1.25 | ₹1.25 |
| 1.02 | Earth work for excavation of foundations, pipe trenches, valve chambers, thrust blocks, etc. in all kinds of ordinary rock, Excavation shall include the removal of asphalt and concrete road surfacing, including dressing, compaction of the bottoms, shoring and strutting wherever required, dewatering whenever required, removal of the excavated rock, stockpiling and disposal of surplus excavated rock off-site as directed by the Employer's Representative.
0.0 to 1.5 m depth from GL | - | Cum | - | - |
| 1.03 | Earth work for excavation of foundations, pipe trenches, valve chambers, thrust blocks, etc. in all kinds of hard rock (blasting prohibited), Excavation shall include dressing, compaction of the bottoms, shoring and strutting wherever required, dewatering whenever required, removal of the excavated rock, stockpiling and disposal of surplus excavated rock off-site as directed by the Employer's Representative.
0.0 to 1.5 m depth from GL | 1 | Cum | 100 | ₹99.9 |
| 1.04 | Backfilling of pipe trenches, foundations, etc. with approved graded excavated soil (select granular material), excluding rock, including placing in layers not exceeding 20 cm in depth each, and compacting each layer, complete as per the specification and as directed by the Employer's Representative. | - | Cum | 53 | - |
| 1.05 | Providing and backfilling excavated pipeline trench with crusher dust including watering, ramming, consolidating using portable vibratory compactor and dressing complete as per drawing, specifications around pipe and as well as above pipe and as per the instructions of the Employer's representative. | 1 | Cum | 10 | ₹9.99 |
| 2PIPELINES, SPECIALS AND APPURTENANCES | |||||
| 2.01 | Supplying all types of MS Specials plain ended, socket ended and flanged as required with internal lining and external coating as per the specification, such as bends, tees, tapers, spool pieces, blind flanges, pieces for pipe connection, valve connections, dismantling joints, anchor bolts, straps, air vent pipe, etc. of different diameters, manufactured from Fe 410 grade steel. This item includes loading, transportation to the project site, unloading and stacking, etc. complete with cost of third party inspection, material, labor, taxes and duties. | 1 | MT | 10 | ₹9.99 |
| 2.02 | Handling, aligning, laying and jointing MS pipes and specials to correct line and level in trenches. The item includes transportation of pipes and specials from the store yard to the project site, stacking of pipe as per BIS requirements, loading, unloading, hoisting, lowering, marginal cutting and grinding wherever necessary, assembling, jointing, providing temporary supports, lining and coating at joints etc. for pipe of the following diameters and thicknesses. The rate also shall include radiography of field joints, field testing, etc. as specified and shown on the drawings and specification.
200 mm ID 5 mm thick | - | Metre | 22 | - |
| 2.03 | Handling, aligning, laying and jointing to correct line and level MS pipes and specials etc. in trenches for Extra Joints less than 4m length (for 100mm to 600mm dia MS pipe) | - | Per inch dia | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
SBDWORKSZooroadR1.pdf
Tender Documents • 3.02 MB
BOQ_83859.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .