Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | ₹2.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.3 L+₹44,956 (15.9%)Rejected-Finance | ₹3.3 L+₹44,956 (15.9%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.3 L+₹46,656 (16.5%)Rejected-Finance 36 8 JUHI LAL COLONY KANPUR | KANPUR | KANPUR | UTTAR PRADESH | ₹3.3 L+₹46,656 (16.5%) | L3 | Rejected-Finance L3 |
Tender Value
₹3.3 L
EMD Value
₹33,326
Closing Date
25 Feb 2026, 3:00 pmClosed
C.E.3
Zone 3
Imp. Interlocking and footpath from Babu purwa near B.N. Bhala Sulabh Shauchalay in Ward 105 Zone 03
2026_NNKAN_1104980_2
275/A.A.3/24-25
Open Tender
Civil Works
Fixed-rate
Imp. Interlocking and footpath from Babu purwa nea
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹33,326
13 Aug 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in cutting or in embank ment in ordinary soilexcavation to be done form of regular pits etc all comp | - | CUM | 115 | - |
| 2 | Checkered Tarrazo Tile 20 mm average thick marble chips of size uo to 6 mm in floors on 25 mm thick bed of mortar 1:1:1 joint With neat cement slurry mixed With pigment to match the etc all comp | - | sqm | 808 | - |
| 3 | Structual steel Work riveted , bolted or welded in buit up section, trusses and framed Work, including cutting, hoisting, fixing in position etc all comp | - | kg | 78 | - |
| 4 | Construction of granular sub base (GSB) by providing Well graded material, spreading in uniform layers With motor grader on prepared etc all comp | - | CUM | 3,671 | - |
| 5 | providing & Laying of Rubber Moulded interlocking Concrete Block With 80 mm thick ICBP ( 75% gray&25% Red/Yellow coloured) etc all comp | - | Sqm | 870 | - |
| 6 | Disposal of earth up to 3.00 km including loading & Unloading but excluding stacking on pucca road etc all comp | - | CUM | 116.96 | - |
| 7 | Add 18% GST | - | GST | 50,836.39 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2078061.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 15.24 MB
BOQ_2078061.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .