| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹98.2 LAccepted-AOC ADD HANUMAN MANDIR ROAD KRISHNAPURI CHUTIA DORANDA CHUTIYA RANCHI JHARKHAND 834001 | RANCHI | JHARKHAND | 834001 | ₹98.2 L | l1 | Accepted-AOC ok |
| 2 | l2₹99.7 LRejected-Finance ADD HANUMAN MANDIR ROAD KRISHNAPURI CHUTIA DORANDA CHUTIYA RANCHI JHARKHAND 834001 | RANCHI | JHARKHAND | 834001 | ₹99.7 L | l2 | Rejected-Finance ok |
Tender Value
₹100.0 L
EMD Value
₹2 L
Closing Date
4 Feb 2026, 5:00 pmClosed
EE RMC
RMC
Construction of Boundary wall and RCC Drain at Bakri Bazar RMC Office (Part-B) under Ward No-20
2026_UDD_109462_1
180/ENG 2026
Open Tender
Civil Works
180 days
AS PER NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹2 L
8 Apr 2026
22 Jan 2026
5 Feb 2026
22 Jan 2026
4 Feb 2026
22 Jan 2026
Labour for cleaning the work site before and after work etc.
Labour for cleaning the work site before and after work etc
Dismantling Pucca brick or lime work including stacking -- do --
Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50 M. including all lifts, levelling, ramming the foundation trenches removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I.
Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification & direction of E/I.
Providing designation 75B one brick flat soling –do-- --do--
Providing and laying position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level PCC 1:2:4
Providing designation 75B brick work in C.M(1:6) in foundation and plinth -do-
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering shuttering, finishing and renforcement-all work up to plinth level RCC 1:1.5:3
Reinforced cement concrete work in wall , inluding attached pilaster, buttresses, plinth and string coarse, fillets,columns,pillars-----do-----do-------E/I RCC 1:1.5:3
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering shuttering, finishing and renforcement-all work up to plinth level RCC 1:1.5:3
Providing designation 75B brick work in C.M(1:6) in superstructure -do-
Providing Tor steel reinforcement of 8mm dia rods bars as per approved design and drawing –do-- --do—TMT Fe 500 (only valid for SAIL and TATA steel,JSPL,Electro steel Ltd and Vizal steel) +Providing Tor steel reinforcement of 10mm,12mm and 16mm dia bars as per approved design and drawing –do-- --do— (i) 8mm dia bar
(ii)10mm dia bar
(iii) 12mm dia bar
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level1:1.5:3 (1 Cement : 1.5 coarse sand zone(III): 3 graded stone aggregate 20mm nominal size)
Providing 12mm Thick cement plaster(1:4)-do-
Providing two coats of snowcem of approved shade and make over coat of cement primer on new surface including preparing the plastered surface smooth with sand paper,scaffolding,curing and taxes all complete as per building specification and direction of E/I
Supplying fitting and fixing M.S grill gate with M.S grills made of 20x6mm M.S flats or 16mm M.S square bars fitted on 25x25x6mm M.S Angle frame –do—(when steel is not supplied by the deptt.)
providing two coat of painting with ready mixed paint –do--
Centering and shuttering including strutting,propping, etc and removal of form for foundation, footing, bases of column etc
Providing and foong concertina coil tenang with punched tape concertina coil 600 mm dia 10 metre openable length (total lengt0 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron Y shaped placed 2.4m or 3.00 m apart and with 9 horizontal RBT reinforced barbed wire, stud bed with G1 staples and G1 clips to retain horizontal, including necessary bolts or G.1 barbed wire bed to angle iron, all complete as per direction of Engineer in-charge, with reinforced barbed tape(RBT)/Spring core (2.5 mm thick) wire of higtonsile strength of 165 kg/ sq mm with tape 10.52 mm thick) and weight 43.478 gm/ metre (cost of MS angle, C.C. blocks shall be paid separately)
Iron and steel material Angles size in mm (50x50x6/8/10 (Gr. A) 3Nos x 1'-6" x 198 Piece
Supplying and laying (properly as per design and drawing) rip-rap with good quality of Boulders duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I.
Reinforced cement concrete work in beams, suspended floors, foors having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staicases and spiral stair cases above plinth level up to floor five lvevel, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand (Zone-III) : 3 graded stone aggregate 20mm nominal size).
Carriage of Materials Sand (Lead Upto 49 km)
Local Sand (Lead 14 KM)
Stone Chips (Lead 22KM)
Bricks 08 KM
Stone Boulder (Lead 36 KM)
Earth (Lead 01 KM)
Good & Service Tax (GST)
Labour Cess
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_147886.pdf
BOQ Comparative Chart
xlsx
finsummary_147886.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
Tendernotice_2.pdf
PDF • 1.73 MB
BOQ_147886.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid