Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.7 LAdmitted-Finance | ₹44.7 L | L1 | Admitted-Finance |
| 2 | L2₹45.5 LAdmitted-Finance | ₹45.5 L | L2 | Admitted-Finance |
| 3 | L3₹46.4 LAdmitted-Finance | ₹46.4 L | L3 | Admitted-Finance |
| 4 | L4₹47.7 LAdmitted-Finance | ₹47.7 L | L4 | Admitted-Finance |
| 5 | L5₹48.9 LAdmitted-Finance | ₹48.9 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S L G BUILDERS L2 | M/S TSERING DHONDUP L4 | M/S TENZIN CONSTRUCTION L1 | M/S T G ENTERPRISES L5 | M/S DHAGPA ENTERPRISES L3 | M/S KEWAN INDIA L6 | M/S L.N. TRADERS L8 | M/S KESANG CONSTRUCTION L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down Cement or cement lime plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc.complete all as specified and directed. | 16 | Sqm | 122.4 ₹1,958.40 | 127.33 ₹2,037.32 | 120 ₹1,920 | 132.43 ₹2,118.82 | 123.62 ₹1,977.98 | 131.76 ₹2,108.22 | 137.49 ₹2,199.76 | 133.74 ₹2,139.85 |
| 2.00 | Taking down chowkhats with shutters (without taking off shutters from the frame) exc 1.5 sqm but not exc 4.00 sqm each, complete all as specified and directed by Engr-in-Charge. | 5 | Each | 495 ₹2,475 | 519.95 ₹2,599.74 | 500 ₹2,500 | 527.75 ₹2,638.74 | 499.95 ₹2,499.75 | 540.94 ₹2,704.70 | 559.2 ₹2,796.02 | 562.58 ₹2,812.89 |
| 3.00 | Taking down chowkhats with shutters (without taking off shutters from the frame) not exc 1.5 sqm each, complete all as specified and directed by Engr-in-Charge. | 28 | Each | 346.5 ₹9,702 | 339.6 ₹9,508.93 | 350 ₹9,800 | 336.21 ₹9,413.84 | 343.04 ₹9,604.98 | 332.85 ₹9,319.70 | 339.4 ₹9,503.30 | 329.52 ₹9,226.51 |
| 4.00 | Taking down Wall/ceiling panelling and similar work complete all as specified and directed by Engr-in-Charge. | 296.16 | Sqm | 90.16 ₹26,701.79 | 86.59 ₹25,644.39 | 92 ₹27,246.72 | 84.86 ₹25,131.51 | 88.36 ₹26,167.75 | 83.16 ₹24,628.88 | 83.13 ₹24,619.03 | 81.5 ₹24,136.30 |
| 5.00 | Taking up or down 25 or 32 mm dia steel tubing and connections, including cleaning for refixing or removal to store complete all as specified and directed. | 75 | RM | 63.6 ₹4,770 | 71.46 ₹5,359.57 | 60 ₹4,500 | 75.75 ₹5,681.15 | 67.42 ₹5,056.20 | 80.29 ₹6,022.02 | 88.52 ₹6,638.67 | 85.11 ₹6,383.34 |
| 6.00 | Taking up or down 40 or 50mm dia steel tubing and connections, including cleaning for refixing or removal to store complete all as specified and directed. | 15 | RM | 67.6 ₹1,014 | 73.12 ₹1,096.74 | 65 ₹975 | 76.04 ₹1,140.61 | 70.3 ₹1,054.56 | 79.08 ₹1,186.24 | 87.18 ₹1,307.71 | 82.25 ₹1,233.69 |
| 7.00 | Demolition and breaking up drain pipes 100mm (Salt glazed ware, AC or Reinforced concrete) set in cement mortar complete all as specified and directed. | 20 | RM | 66.3 ₹1,326 | 68.98 ₹1,379.57 | 65 ₹1,300 | 70.36 ₹1,407.16 | 67.63 ₹1,352.52 | 71.77 ₹1,435.31 | 73.93 ₹1,478.65 | 73.2 ₹1,464.01 |
| 8.00 | Demolition of Brickwork or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, including ashlar facings, dressed stonework and precast concrete articles, complete all as specified and directed. | 1.3 | Cum | 2,424 ₹3,141.50 | 2,472.72 ₹3,204.65 | 2,400 ₹3,110.40 | 2,497.45 ₹3,236.69 | 2,448.24 ₹3,172.92 | 2,522.42 ₹3,269.06 | 2,725.98 ₹3,532.87 | 2,547.65 ₹3,301.75 |
| 9.00 | Demolition of cement concrete (unreinforced) in ground floors and pavings not exc 15cm thickness (below or above ground level) complete all as specified and directed by Engr-in-Charge. | 10.65 | Cum | 1,940 ₹20,661 | 1,825.35 ₹19,439.93 | 2,000 ₹21,300 | 1,770.59 ₹18,856.74 | 1,881.8 ₹20,041.17 | 1,717.47 ₹18,291.03 | 1,640.95 ₹17,476.17 | 1,665.94 ₹17,742.30 |
| 10.00 | Demolition of cement concrete (unreinforced) of any description and in any position not otherwise specifically provided for, complete all as specified and directed. | 10.15 | Cum | 2,156 ₹21,878.01 | 2,070.62 ₹21,011.64 | 2,200 ₹22,324.50 | 2,029.21 ₹20,591.41 | 2,112.88 ₹21,440.45 | 1,988.63 ₹20,179.58 | 2,046.3 ₹20,764.79 | 1,948.85 ₹19,775.99 |
Tender Value
₹44.8 L
EMD Value
₹90,000
Closing Date
4 Apr 2026, 6:00 pmClosed
Maj Rohit Gogoi
GE 859 EWS
SPECIAL REPAIR OF VARIOUS BLDG
2026_MES_756945_1
8996/E8
Open Tender
Civil Works
180 days
Tawang
SPECIAL REPAIR OF VARIOUS BLDG
7 documents required · 7 mandatory
₹500
Yes
GE 859 EWS
₹90,000
Yes
8 Apr 2026
21 Mar 2026
6 Apr 2026
21 Mar 2026
4 Apr 2026
28 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Taking down Cement or cement lime plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc.complete all as specified and directed. | |||||
| 2Taking down chowkhats with shutters (without taking off shutters from the frame) exc 1.5 sqm but not exc 4.00 sqm each, complete all as specified and directed by Engr-in-Charge. | |||||
| 3Taking down chowkhats with shutters (without taking off shutters from the frame) not exc 1.5 sqm each, complete all as specified and directed by Engr-in-Charge. | |||||
| 4Taking down Wall/ceiling panelling and similar work complete all as specified and directed by Engr-in-Charge. | |||||
| 5Taking up or down 25 or 32 mm dia steel tubing and connections, including cleaning for refixing or removal to store complete all as specified and directed. | |||||
| 6Taking up or down 40 or 50mm dia steel tubing and connections, including cleaning for refixing or removal to store complete all as specified and directed. | |||||
| 7Demolition and breaking up drain pipes 100mm (Salt glazed ware, AC or Reinforced concrete) set in cement mortar complete all as specified and directed. | |||||
| 8Demolition of Brickwork or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, including ashlar facings, dressed stonework and precast concrete articles, complete all as specified and directed. | |||||
| 9Demolition of cement concrete (unreinforced) in ground floors and pavings not exc 15cm thickness (below or above ground level) complete all as specified and directed by Engr-in-Charge. | |||||
| 10Demolition of cement concrete (unreinforced) of any description and in any position not otherwise specifically provided for, complete all as specified and directed. | |||||
stage.html
html • 0.04 MB
technical_847884.pdf
techsummary_847884.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_847884.xls
BOQ • 0.30 MB
8996.pdf
Tender Documents • 1.30 MB
Download all tender documents and submit your bid