Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹35.1 LAccepted-AOC | ₹35.1 L | 1 | Accepted-AOC Highest |
| 2 | 2₹20.3 L−₹14.8 L (42.1%)Rejected-Finance | ₹20.3 L−₹14.8 L (42.1%) | 2 | Rejected-Finance H2 |
| 3 | 3₹20.1 L−₹15.0 L (42.8%)Rejected-Finance | ₹20.1 L−₹15.0 L (42.8%) | 3 | Rejected-Finance H3 |
| 4 | 4₹19.8 L−₹15.3 L (43.6%)Rejected-Finance CHANDRONA TEHSIL NOHRADHAR DISTRICT SIRMOUR H P | ₹19.8 L−₹15.3 L (43.6%) | 4 | Rejected-Finance H4 |
| 5 | 5₹16 L−₹19.1 L (54.4%)Rejected-Finance | ₹16 L−₹19.1 L (54.4%) | 5 | Rejected-Finance H5 |
Tender Value
₹14.0 L
EMD Value
₹28,000
Closing Date
6 May 2021, 11:00 amClosed
AGM BWS
AGM BWS US CLUB SHIMLA 1
Demolition Dismantling and Disposing e-Auction of existing slow sand filter and structure material at WTP Dhalli Shimla
2021_MC_46790_1
No.SJPNL/BWS/NIT/21-88-91
Open Tender
Civil Works
Item Rate
60 days
Shimla-1
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
₹28,000
19 Aug 2021
22 Apr 2021
6 May 2021
22 Apr 2021
6 May 2021
22 Apr 2021
22 Apr 2021 - 5 May 2021
Amount
(1) Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within all lead & lift complete = 1076.37 Cum ( 2 ) Demolition of brick masonary in super structure and disposal of unservicable material with in all lead & lift =34.41 Cum (3) Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking & clearing site & disposing in all lead & lift = 73321.86 KG. (4) Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height of sectional area 40 square centimetres including stacking the material and clearing site with in all lead & lift = 4.23 Cum (5) Taking out ,removal & stacking of material from existing filter bed including stacking of serviceable material and disposal of unserviceable material within all (5.1) PCC Chakkas = 97.02 Cum (5.2)Top Layer: Fine Sand (Eff: size 0.20 mm to 0.40 and Uniformly-co-efficient 2.00 to 3.00)=129.36 Cum (5.3)Third Layer: Bajri 6mm to 20 mm = 129.36 Cum (5.4) Third Layer: Bajri 6mm to 20 mm = 97.02 Cum (5.5) Fourth Layer: Bajri 20 mm to 25 mm = 97.02 Cum (5.6) Bottom Layer: Broken Stone 50mm to 75 mm = 194.04 Cum. (ITEM NO. 1-A)
( 2.1) Scrap Value of Dismantled Steel Work (Lum Sump) after dismantling of structure = 73321.86 Kg, & SERVICABLE MATERIAL VALUE OF (2.2) Top Layer: Fine Sand (Eff: size 0.20 mm to 0.40 and Uniformly-co-efficient 2.00 to 3.00) = 77.62 Cum (2.3) Second Layer: Coarse sand 3 mm - 6 mm = 77.62 Cum (2.4) Third Layer: Bajri 6 mm to 20 mm = 58.21 Cum (2.5) Fourth Layer: Bajri 20 mm to 25 mm = 58.21 Cum (2.6) Bottom Layer: Broken Stone 50 mm to 75 mm =116.42 Cum (2.7) Wood (Second Class Deodhar) = 1.3 Cum . (ITEM NO. 1-B)
yashwant singh thakur
Kuldeep Kumar Thakur
SURENDAR HANSRETTA
ASHOK KUMAR
SAHIL BALI
Sai Engineering Foundation
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .