Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.4 L+₹1,067.05 (0.11%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | M MANIKANDAN CONTRACTOR L1 | RAJENDRAN CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00Construction of Dinning Hall Building at Pattanampatti village in Sevarakottai Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 10.78 | cum | 263.7 ₹2,842.69 Lowest | 264 ₹2,845.92 |
| 3.00 | Collection and supply of M.Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification. | 5.15 | cum | 2,076 ₹10,691.4 Lowest | 2,077 ₹10,696.55 |
| 4.00 | CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete | 10.3 | cum | 5,811 ₹59,853.3 Lowest | 5,812 ₹59,863.6 |
| 5.00 | Refilling the Basement with Excavated earth and Sand Complying the Standard Specification | 36.25 | cum | 43 ₹1,558.75 Lowest | 43 ₹1,558.75 Lowest |
| 6.00 | Brick work in cement mortar 1:5 mix using country brick including cost and conveyance of all materials charges etc completed | 10.36 | cum | 6,185 ₹64,076.6 Lowest | 6,186 ₹64,086.96 |
| 7.00Providing centering & shuttering charges for pcc plain surface cost of country wood plank including all cost & conveyance and all labour charges etc | |||||
| 8.00 | For Upto Basement and Grade Beam | 27.96 | sqm | 547.5 ₹15,308.1 Lowest | 548 ₹15,322.08 |
| 9.00 | Column post | 3.04 | sqm | 1,095 ₹3,328.8 Lowest | 1,096 ₹3,331.84 |
| 10.00 | RCC 1:1.5:3 mix using 20mm metal including all cost & conveyance of all materials to site & all labour charges etc complete | 7.76 | cum | 9,546.7 ₹74,082.39 Lowest | 9,547 ₹74,084.72 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
18 Feb 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer,BP
Block Development Office,Kallal
Constructions of Dinning Hall Building at Pattanampatti Village in Sevarakottai Panchayat
2026_RDTN_656808_1
Sevarakottai/Dinning Hall
Open Tender
Civil Works
Item Rate
Kallal
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,000
Yes
25 Feb 2026
13 Feb 2026
18 Feb 2026
13 Feb 2026
18 Feb 2026
14 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Dinning Hall Building at Pattanampatti village in Sevarakottai Panchayat | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 10.78 | cum | - | - |
| 3 | Collection and supply of M.Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification. | 5.15 | cum | - | - |
| 4 | CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete | 10.3 | cum | - | - |
| 5 | Refilling the Basement with Excavated earth and Sand Complying the Standard Specification | 36.25 | cum | - | - |
| 6 | Brick work in cement mortar 1:5 mix using country brick including cost and conveyance of all materials charges etc completed | 10.36 | cum | - | - |
| 7 | Providing centering & shuttering charges for pcc plain surface cost of country wood plank including all cost & conveyance and all labour charges etc | - | - | - | - |
| 8 | For Upto Basement and Grade Beam | 27.96 | sqm | - | - |
| 9 | Column post | 3.04 | sqm | - | - |
| 10 | RCC 1:1.5:3 mix using 20mm metal including all cost & conveyance of all materials to site & all labour charges etc complete | 7.76 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_787635.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
MLAcdsTenderNotice.pdf
Tender Documents • 0.63 MB
BOQ_787635.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .