Tender Value
₹2.9 Cr
EMD Value
₹5.8 L
Closing Date
10 Jul 2026, 5:00 pm
Laying of track in yard line and track connectivity between yard and fabrication shop at WRS/Raipur. [This work primarily involves (1) Laying of two parallel Lines between yard and fabrication shop at WRS/Raipur (1200x2 + 600 Meter) (2) Drain work along last track.(1000 Meter long)]
E-R-T-40-26-27
E-R-T-40-26-27
Open
12 Months
Raipur, Chhattisgarh
₹0
₹5.8 L
18 Jun 2026
18 Jun 2026
26 Jun 2026
Description:- Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge of the cutting(s) including all lifts, ascent, descent, loading,
thereto for completing the work as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest updated correction slips and to the satisfaction of the Engineer-in-Charge. Note: (i) All usable earth arising from cut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked away from toe of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked by the contractor and will be property of the Railways. (iii)Cut trees shall be property of Railways and to be deposited in the railway godown unless specified otherwise in the Conditions of Contract. In all conditions and classifications of soil except rock
Description:- Dismantling of existing LWR/SWR track of any structure, removing rails, sleepers, fish
location in countable manner within a free lead of 500m, levelling of ballast to correct profile for laying new track over it, all as per direction of Engineer-in-Charge.
3 RAIPUR DIVISION-ENGINEERING/SOUTH EAST CENTRAL RLY Description:- Providing Centre Line / Rail Level, reference Pegs on formation at an interval of 30 metres on one side or at centre of proposed / existing track, as directed by engineer in-charge for linking of new track / CTR / Deep Screening / Lifting / Lowering works, duly embedding in formation including marking with contractor's paint. Note: (1) Rails/tie bar of suitable size bar shall be supplied by the Railways from nearest Stores Depot. In case of hard wood peg, the hard wood will be supplied by the contractor. (2) Excavation and concrete work, if required, will be paid separately. With contractor's hard wood pegs of 50 mm dia and 60 cm long
Description:- Linking of BG track (except at LC, Bridges and SEJs) with any type of rail section and sleeper of specified density, on ballast bed spread and compacted with suitable roller, over prepared formation including leading free rails/welded panels available along the alignment on to formation, leading and spreading all fittings and fastenings, spreading of sleepers at specified spacing, squaring, placing of rails over sleepers and fixing rails to sleepers with all types of fittings and
grease as per IRPWM standards with contractors labour, tools, consumables, with all lead, lifts etc. complete and raising, levelling and initial packing of track to make it fit for 30 kmph and meet other prerequisites prescribed in Indian Railway Track Machine Manual for deployment of Tamping Machine. Note: 1.Rail cutting and Hole drilling shall be paid separately. 2.Spreading of ballast and compaction shall be paid separately under relevant item. For sleeper density of 1660 sleepers per km
Description:- Carrying out cut & connection to the existing PSC sleeper track under line block of any rail section and sleeper density to connect the same to newly linked track which is laid by the
plated joints including drilling of holes, slewing required length of both tracks to prescribed alignment, adjusting sleeper spacing, providing continuity to track, spreading of ballast to provide cushion, shoulder ballast to the track stretch, giving one round of initial packing to make track fit for
Description:- First or Second Through Packing of track of all sleeper density including giving a
and major realignment of curves and formation rehabilitation as per procedure prescribed in latest edition of IRPWM. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm. For PSC Sleeper Track with Sleeper Density of 1660
Description:- Third or subsequent Through Packing of track for all sleeper density including picking
procedure prescribed in latest edition of IRPWM. This item can also be used after lifting/regrading/realignment works also. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm. For PSC Sleeper Track with Sleeper Density of 1660
Description:- Assembling complete BG Turnout on staging, clear of infringements, to correct gauge and alignment as per standard drawings with all types of rail sections over PSC sleepers at specified
lift & crossing of track as required and testing points with S&T staff for throw of switch etc. at station yard after levelling surface complete including lubrication of all fastenings, complete in all respect. Note: 1.Rail cutting and Drilling shall be paid separately 2. Required P.Way fittings/fastenings shall be supplied at the SSE/P.Way stores. 1 in 8½ Turnout
Description:- Assembling complete BG Turnout on staging, clear of infringements, to correct gauge and alignment as per standard drawings with all types of rail sections over PSC sleepers at specified
lift & crossing of track as required and testing points with S&T staff for throw of switch etc. at station yard after levelling surface complete including lubrication of all fastenings, complete in all respect. Note: 1.Rail cutting and Drilling shall be paid separately 2. Required P.Way fittings/fastenings shall be supplied at the SSE/P.Way stores. 1 in 12 Turnout
Description:- Laying and linking of turnouts of all types including diamond crossings & Derailing switches with 52Kg / 60Kg rail section on PSC sleepers on prepared ballast bed for New lines or during total closure of section at indicated location as per standard drawing, duly leading sleepers,
with housing of tongue rails as per requirement of signaling, preparing ballast bed, filling and spreading of ballast as required, linking of turnout with track, attending track parameters including lifting, providing one round of packing to make track fit for 20 kmph speed including lubrication of fittings/fastenings, complete as directed by Engineer in-charge. 1 in 8½ Turnouts
RAIPUR DIVISION-ENGINEERING/SOUTH EAST CENTRAL RLY Description:- Laying and linking of turnouts of all types including diamond crossings & Derailing switches with 52Kg / 60Kg rail section on PSC sleepers on prepared ballast bed for New lines or
rails, switches, crossings, fastenings including rail cutting, drilling, fixing of all components, fittings with housing of tongue rails as per requirement of signaling, preparing ballast bed, filling and spreading of ballast as required, linking of turnout with track, attending track parameters including lifting, providing one round of packing to make track fit for 20 kmph speed including lubrication of fittings/fastenings, complete as directed by Engineer in-charge. 1 in 12 Turnouts
Description:- Through packing of points and crossings, derailing switches including gauging, fittings recoupment, ballasting as required, elimination of sag and to the required alignment after
Engineer-in-charge. Note: This work shall be operated in exceptional cases with written approval at DEN level when UNIMAT is not available and immediate packing is required to pass train over it. 1 in 8½ PSC layout
Description:- Through packing of points and crossings, derailing switches including gauging, fittings recoupment, ballasting as required, elimination of sag and to the required alignment after
Engineer-in-charge. Note: This work shall be operated in exceptional cases with written approval at DEN level when UNIMAT is not available and immediate packing is required to pass train over it. 1 in
track in mid section & station yard, as specified by Engineer in-charge including disposal of branches, bushes outside cess/yard.
boundary as per instructions of Engineer in-charge to keep drains clean and clear in cuttings etc.
Description:- Anti-corrosive painting of rail outside track on rail bottom, web, foot and fishing plane
reputed make including surface preparation, as a complete job as per procedure prescribed in latest edition of IRPWM. For 60 Kg Rails
Description:- Anti-corrosive painting to weld collar for Thermit welded rail joints on track or on cess for new welded joints to protect against severe corrosion for any rail section with one coat of high build epoxy paint (two pack) of reputed make confirming to RDSO Specification M&C/PCN-111/99 on
surface preparation as per Railway's AT Weld Manual including lettering / weld numbering with approved enamel paint as directed Note: Before painting, dust, loose rust and mill scale and dirt shall be removed thoroughly by wire brushing. Scrubbing welded area with water to make it free from slag and other water soluble compounds to make it dry.
Description:- Marking, inscribing, painting, writing, bordering etc. on new / old iron surface at various locations of Points & Crossings with details of turn-in / turn-out reference station mark on rail
synthetic enamel paint of approved quality as background and stenciling the details to suitable size, as described for every curve reference station mark / switch / crossing details with black enamel paint of approved quality complete, as directed : Note: Stenciling of letters is only permitted. No hand written letters are accepted. 1 in 12 Turnout
Description:- Marking, inscribing, painting, writing, bordering etc. on new / old iron surface at various locations of Points & Crossings with details of turn-in / turn-out reference station mark on rail
synthetic enamel paint of approved quality as background and stenciling the details to suitable size, as described for every curve reference station mark / switch / crossing details with black enamel paint of approved quality complete, as directed : Note: Stenciling of letters is only permitted. No hand written letters are accepted. 1 in 8½ Turnout
RAIPUR DIVISION-ENGINEERING/SOUTH EAST CENTRAL RLY Description:- Carrying out pre-tamping, during tamping and post-tamping work for tamping track with all types of rails, sleepers & sleeper density by various Track Tamping machines, like CSM,DUO/3X Machines which include : (1) Re-adjustment of ballast, heaping-up of ballast, filling-up of cavities in tamping zone by picking ballast from stacks / shoulders / crib of adjoining track up to lead of 50 m to ensure effective packing; (2) Clearing of ballast on sleepers to make them visible to
Digging, screening and replenishment of ballast at mud pumping / rounded ballast in sleeper crib location; (5) Tightening of loose fittings immediately before & after tamping; (6) Replacement of broken / missing fittings supplied by Railway; (7) Correcting displaced sleepers to position along with squaring; (8) Re-setting of worked-out / fallen fittings. (9) Removing and re-fixing joggled fish plates & wooden blocks, wherever necessary; (10) Manual consolidation of ballast in crib / shoulders; (11) Removing and refixing of traction bonds during the block in electrified sections (12) Dressing of ballast Note: 1. Tamping blocks are not identical & it may be given at any time either during day or night. 2. Stages of payment a) 30% of the rate will be paid on completion of pre tamping attention, b) Balance 70% of the rate will be paid on completion of post tamping. 3. Recovery at the rate of twice the above applicable rate will be effected in case contractor fails to carry out pre/during/post operation. 4.Payment shall be made only once in irrespective of numbers of TTRM packing round and after restoration of normal speed and restoration of complete ballast profile. For day time block working
Description:- Quick cutting with abrasive rail cutter of all types of rail sections including wear resistant, head hardened rails up to 110 UTS, with contractors tools & plants, equipment,
will be as per RDSO Specification No. TM/SM/1 (Rev. 01 of 2012) with latest status of RDSO; Rail Cutting Wheel Abrasive Disc will be as per RDSO Specification No.TM/SM/2 (Rev. 01 of 2020) 60 Kg - 110/90 UTS - Outside Track
Description:- Quick cutting with abrasive rail cutter of all types of rail sections including wear resistant, head hardened rails up to 110 UTS, with contractors tools & plants, equipment,
will be as per RDSO Specification No. TM/SM/1 (Rev. 01 of 2012) with latest status of RDSO; Rail Cutting Wheel Abrasive Disc will be as per RDSO Specification No.TM/SM/2 (Rev. 01 of 2020) 60 Kg - 110/90 UTS - On Running Line
Description:- Drilling holes of 16 mm to 32 mm dia. with Rail Drilling machine including chamfering
equipment, consumable with all lead & lift etc. complete, as directed by Engineer in-charge. Rail Drilling Machine will be as per RDSO Specification No. TM/SM/3, dated 24.04.1991. Outside Track
Description:- Drilling holes of 16 mm to 32 mm dia. with Rail Drilling machine including chamfering
equipment, consumable with all lead & lift etc. complete, as directed by Engineer in-charge. Rail Drilling Machine will be as per RDSO Specification No. TM/SM/3, dated 24.04.1991. On Running Line
Description:- 25mm gap Cess Welding with Railway's welding portion and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with Contractor's labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including all
anticorrosive paint, as directed by Engineer in charge. Note: 1 . Only welding portion and related accessories as per Annexure - I shall be supplied by Railways. 2. Welding shall be carried out only by trained welder having valid competency certificate. 3. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. For 60 Kg Rail, Single shot crucible fitted with Automatic Tapping Thimble, 3 pieces Mould (Zircon washed) and Compressed Air Petrol/LPG pre heating technique
Description:- Loading, leading and unloading of all types of P.Way fittings and all other
vehicles for different leads. Note: Lead shall be the shortest motorable road length between the points of loading and unloading. Lead up to 5 Km
Description:- Loading, leading and unloading of all types of P.Way fittings and all other
vehicles for different leads. Note: Lead shall be the shortest motorable road length between the points of loading and unloading. Lead beyond 30 Km and up to 50 km
28 RAIPUR DIVISION-ENGINEERING/SOUTH EAST CENTRAL RLY 28 Description:- Loading of rails of any section and length up to 13 metres in Wagons / Truck / trailer including lead up to 50 metres and lift up to 5 metres. In Wagon where mechanical handling is possible and traffic block is not required or in Truck/trailer.
Description:- Loading of 52kg / 60kg PSC normal line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in a neat manner to departmental material train
one track with free lead up to 250 metre and lift up to 5 metre, if required with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied. In Wagon where mechanical handling is possible and traffic block is not required or in Truck / trailer
Description:- Loading of 52kg / 60kg PSC line and special sleepers beyond 2.75 metre length including existing fittings and fastenings in Depot / Station / Mid-section between stations in a neat manner to departmental material train (DMT) or contractor's / Railway's Truck/trailer with crane or
metre, if required with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied. In Wagon/Truck / trailer where mechanical handling is possible a n d traffic block is not required.
Description:- Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road
points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items. Lead up to 5 Km
Description:- Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road
points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items. Lead beyond 20 Km and up to 30 km
Description:- Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road
points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items. Lead beyond 50 Km and up to 100 Km
Description:- Unloading of 52kg / 60kg PSC line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in neat manner for Railway usage from departmental
crossing of one track and lead up to 250 metre & lift up to 5 metre with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied. From Truck / Trailer
Description:- Unloading of 52kg / 60kg PSC special sleepers beyond 2.75 metre length in Depot / Station / Mid-section between stations in neat manner for Railway usage from departmental material
of one track and lead up to 50 metre & lift up to 5 metre with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied. From Truck / Trailer
either side for different leads with all lifts by any means. For a lead up to 500m
Description:- Unloading of Switches / Crossings / SEJ Rails / Glued Joints of any rail section and
departmental material train (DMT) or contractor's / Railway's Truck/Trailer with lead up to 250 metre & lift up to 5 metres. From Truck / Trailer
Description:- Hiring of machinery for minor miscellaneous works for short duration including
as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site. Hydra or similar tyre mounted Pick-n-Carry crane of 12T capacity for misc. works of handling of material
39 RAIPUR DIVISION-ENGINEERING/SOUTH EAST CENTRAL RLY 39 Description:- Gas cutting of rail of various sections with contractor's tools & plants, as directed by engineer in-charge : Rail section of 52Kg and above
Description:- De-stressing of LWR/CWR track of any density under traffic line block with contractor's labours, tools, equipments and consumables inclusive of all lead & lift. Activities include cutting of LWR/CWR into convenient panels of specified length, removal of ERCs, liners, greasing of ERCs and liner contact area, lifting rails and keeping them on rollers provided at every 15 sleepers,
help of Hydraulic Tensor to achieve the desired elongation, cutting rails, as required, removing rollers and placing rail in position, re-fixing ERCs & liners and adjustment of gap at SEJs : Note: (1) Welding of rail joints will be paid separately. (2) Rail cutting and Hole drilling shall be paid separately. (3) Opening and closing of LC if required will be paid separately. (4) As per procedure prescribed in latest edition of IRPWM & CE's Circulars for destressing of LWR/CWR, if any. Without Rail tensor S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Code Unit Above/ Schedule () B-Execution of all works connected with above work covered under 20266984.23 Below/P CPWD DSR 2023-Ver-1 . ar 16.3.10 7200.00 cum 768.25 5531400.00 1.75 5628199.50 1 Description:- ROAD WORK // ROADS // Supplying and stacking at site. // Moorum 2.27 120.00 cum 2123.75 254850.00 1.75 259309.88
including watering, ramming, consolidating and dressing complete. 4.1.5 120.00 cum 7294.70 875364.00 1.75 890682.87 Description:- CONCRETE WORK // CEMENT CONCRETE (CAST IN SITU) // Providing and laying in
up to plinth level : // 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) 5.33.1.1 200.00 cum 9504.75 1900950.00 1.75 1934216.63 Description:- REINFORCEMENT CEMENT CONCRETE // DESIGN MIX CONCRETE // Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland
IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: // All works upto plinth level // Concrete of M25 grade with minimum cement content of 330 kg /cum 5.33.1.2 360.00 cum 9655.70 3476052.00 1.75 3536882.91 Description:- REINFORCEMENT CEMENT CONCRETE // DESIGN MIX CONCRETE // Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland
IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: // All works upto plinth level // Concrete of M30 grade with minimum cement content of 350 kg /cum 5.9.1 600.00 Sqm 392.15 235290.00 1.75 239407.58
including strutting, propping etc. and removal of form for // Foundations, footings, bases of columns, etc. for mass concrete 5.9.2 3600.00 Sqm 842.50 3033000.00 1.75 3086077.50
including strutting, propping etc. and removal of form for // Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. 19.35.3 30.00 Metre 5377.25 161317.50 1.75 164140.56 Description:- DRAINAGE // STONE WARE PIPES AND FITTINGS // Providing and laying Non Pressure
mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete //
5.22.6 12560.00 Kg 107.85 1354596.00 1.75 1378301.43 RAIPUR DIVISION-ENGINEERING/SOUTH EAST CENTRAL RLY
reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. // Thermo-Mechanically Treated bars of grade Fe-500D or more. 5.22A.6 27260.00 Kg 107.85 2939991.00 1.75 2991440.84 Description:- REINFORCEMENT CEMENT CONCRETE // STEEL REINFORCEMENT // Steel
binding all complete above plinth level. // Thermo-Mechanically Treated bars of grade Fe-500D or more. 12.41.1 80.00 Metre 248.80 19904.00 1.75 20252.32 Description:- ROOFING // RAIN WATER SPOUT AND PIPE // Providing and fixing on wall face
ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. //
extra cement in the items of design mix over and above the specified cement content therein. S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Code Unit Above/ Schedule () C-Execution of all works connected with above work covered under SEC 832928.00 Below/P Railway USSOR 2010. ar
Description:- Extra for mechanical compaction of earth/blanketing material filled in embankment
specification, testing as per IS codes incl. cost of water, T&P consumable material and all labour as a complete job. The work is to be executed as per Latest edition of "Guidelines for Earthwork in Railway Projects" issued by RDSO, Lucknow
Description:- Laying and spreading blanketing materials (Natural or Mechanically prepared as per GE-1 or G.E.IRS-2) over new / old embankment / cutting in layers of 30 cm in loose state to make the embankment of designed profile as per specifications. The rate is inclusive of initial site clearance,
give required slope, benching if required on existing bank slope, dressing and finishing of bank, all lead & lift, ascent, descent, crossing of nallahs/ other obstructions, spreading the material and final dressing of slopes and top surface as per specified camber using contractor's own machinery, equipment, T&P labour etc., as a complete job. Note - The rate does not include supply / compaction of blanketing material at site which shall be paid separately.
Description:- Removal of excavated/slip earth/ debris/ malba from the site of works to any other place outside Railway land/premises, including all excavations, handling, re-handling, loading, unloading and leading, etc. all labour and material as a complete job. Removal of Earth (all kinds of
berms in cutting, water way of bridges, over coping of toe/breast/retaining walls etc. including crossing of nallah, railway tracks, making/repairing approach roads if required, all lead, lift, ascent, descents, or any other obstruction. Earth spoils to be dumped outside the cutting or railway embankments as per direction of Engineer in charge
vegetation in all kind of soil. Payment against this item is to be made only if it is not included in earth work item
Description:- Hiring of JCB Machine (in good working condition) for leveling and dressing ground /
JCB machine, machine operator, fuel, etc. The contractor shall arrange road permit for vehicle for all the States of operation, as per instructions of engineer in-charge and vehicle shall not be more than three years old. Payment shall be made for actual working hours at site. S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Code Unit Above/ Schedule () D-Execution of all works connected with above work covered under NS 963999.26 Below/P items. ar NS 10.00 Set 1849.26 18492.60 AT Par 18492.60 RAIPUR DIVISION-ENGINEERING/SOUTH EAST CENTRAL RLY Description:- Lifting of existing 1 in 8.5 points and crossing including approaches of 50 m on both sides (SRJ side and back leg of crossing side ) by an average around of 60 mm(+/- 10 mm) including
level.This work will include adjustment of gauge ,cross level,alignment,tightening and fixing of fastening,respacing of sleepers as per layout drawing or as per advice of Enginer-in-charge ,making up of ballast section as per ballast profile for the track with contractors labours,tools and plants including all taxes/charges,octroi etc. complete as directed by Engineer-incharge at site. NS 4.00 Each 10999.50 43998.00 AT Par 43998.00
closed position. Height : (280 x 160)mm, lift upto: 300mm from side end top. NS 4.00 Each 2956.04 11824.16 AT Par 11824.16
No.TM/58, dt.11.06.2001, TM/52 dt.24.05.2000, make : BENRA. NS 30.00 Sqm 6146.15 184384.50 AT Par 184384.50 Description:- Supply, erecting and fixing of retroreflective board made with HIP grade retro
supported with 37x37x3mm angle frame and diagonally with same angle along with arrangement for fixing at site including nuts & bolts (minimum 10mm dia) complete. NS 7500.00 cum 94.04 705300.00 AT Par 705300.00 Description:- Spreading of stone ballast on track and points & crossing from the quantity available
formation in bank and cuttings as directed by the Engineer-in-Charge with a free lead upto 100meters and lift upto 3.0 meters inclusive of descent, loading, unloading, labour and materials required including crossing one or more running railway lines if required etc. complete.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
SCCTrackWork5-1-3.pdf
ATTACHMENT
SCCTrackWork6-1.pdf
ATTACHMENT
AnnexureVIABidsecurityformat-1-2new.pdf
ATTACHMENT
SCCTrackWork34Signed-1-141-1-14.pdf
ATTACHMENT
SCC121-12-FinalDEN-IIIspl.pdf
ATTACHMENT
special condition for earth work
ATTACHMENT
Earthwork_11zon-1-222.pdf
ATTACHMENT
GCC2022uptoACS11_compressed.pdf
ATTACHMENT
Annexure-AEngg.Org._.pdf
ATTACHMENT
Annexure-BPlantMachinery.pdf
ATTACHMENT
Annexure-CWorkinHand.pdf
ATTACHMENT
Annexure-EEFTdetail_R-1.pdf
ATTACHMENT
Annexure-J.pdf
ATTACHMENT
AnnexureI-Icommunicationdetails.pdf
ATTACHMENT
Annexure-W.pdf
ATTACHMENT
Annexure-VIB_1.pdf
ATTACHMENT
PCECircular31-1-171.pdf
ATTACHMENT
CE16Revised2023-1-111.pdf
ATTACHMENT
Specialconditoinforearthwork_compressed1-1-12.pdf
ATTACHMENT
Download all tender documents and submit your bid