| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC | ₹5.4 L | L1 | Accepted-AOC Quoted rate stands lowest |
| 2 | L2₹5.5 L+₹8,538 (1.57%)Rejected-Finance SOUTH BIRNAGAR RAIGANJ UTTAR DINAJPUR | RAIGANJ | UTTAR DINAJPUR | WEST BENGAL | ₹5.5 L+₹8,538 (1.57%) | L2 | Rejected-Finance Quoted rate stands 2nd lowest |
| 3 | L3₹5.6 L+₹14,173 (2.61%)Rejected-Finance ALIPURDUAR COURT DIST ALIPURDUAR PIN 736122 | ALIPURDUAR | ALIPURDUAR | WEST BENGAL | 736122 | ₹5.6 L+₹14,173 (2.61%) | L3 | Rejected-Finance Quoted rate stands 3rd lowest |
| 4 | L4₹5.6 L+₹17,076 (3.14%)Rejected-Finance DEBINAGAR RAIGANJ UTTAR DINAJPUR | RAIGANJ | UTTAR DINAJPUR | WEST BENGAL | 733134 | ₹5.6 L+₹17,076 (3.14%) | L4 | Rejected-Finance Quoted rate stands 4th lowest |
| 5 | L5₹5.9 L+₹42,633 (7.84%)Rejected-Finance 208 L MODEL TOWN LUDHIANA | LUDHIANA | LUDHIANA | PUNJAB | ₹5.9 L+₹42,633 (7.84%) | L5 | Rejected-Finance Quoted rate stands 5th lowest |
Tender Value
₹5.7 L
EMD Value
₹11,384
Closing Date
25 May 2026, 2:00 pmClosed
EE Alipurduar Irrigation Division
Oo the EE, Alipurduar Irrigation Division
Maintenance and repair to Nararthali Kamakhyaguri Irrigation canal in between Ch.5050.00 m Ch. 8850.00 m in Block P.S. Kumargram Dist. Alipurduar for the year 2026. 3rd call
2026_IWD_1024314_3
WBIW/EE/APD/NIT-03(e)/2026-27
Open Tender
CIVIL WORKS
Percentage
150 days
Block P.S. Kumargram Dist. Alipurduar
Please refer Tender documents.
8 documents required · 8 mandatory
₹11,384
Yes
17 Jun 2026
16 May 2026
28 May 2026
16 May 2026
25 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. | 31,920 | sqm | 2.38 | ₹75,969.6 |
| 2 | Supplying dressing and stacking at site bamboo pins above 5cm. Diameter and upto7.5cm. diameter. (Dia.to be measured at mid length). | 6,393.6 | metre | 34.56 | ₹2,20,962.82 |
| 3 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.(a) Where boats are not necessary. | 3,196.8 | metre | 13.11 | ₹41,910.05 |
| 4 | Supplying, fitting and fixing with iron nail shalf split bamboo wailing pieces (av. dia. of bamboo. not less than 5.0 cm.) | 1,274 | metre | 26.22 | ₹33,404.28 |
| 5 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incidental charges etc all complete (capacity 50 kg). (Supplied by Agency) | 2,806 | each | 7.15 | ₹20,062.9 |
| 6 | Labour charges for filling empty cement gunny bag/polythene bag (capacity 50kg) with all kinds of earth (wet or dry), sand or agreegates (stone/brick) and sewing as done in case of cement bags, (tying with a knot after filling will not be accepted), and stacking with in a lead of 30 metre as per direction of Engineer-in-charge (cost is excluding the cost of any types of filling materials).NB:-Volume of earth/sand filled bags should not be less than 0.028cum. | 3,806 | each | 8.34 | ₹31,742.04 |
| 7 | Dumping in position earth/sand filled gunny/poly bags (capacity 50kg) within a lead of 30 metre inclusive of all lifts. | 3,806 | each | 3.58 | ₹13,625.48 |
| 8 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land, including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary. and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB: Measurement to be taken on the basis of stack measurement/prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. B) Beyond 1.00 km and upto 2.00 km. Note :Add extra rate towards compensation for earth for land owned/arranged by the contractor over rate of earthwork for land owned/arranged by the Department and for royalty charges on earth as per latest rate as mentioned in PWD Schedule. The royalty will be paid to the agency on production of necessary documents in support of payment made toward the royalty. During initial payment of bill a deduction as per considered rate may be made. | 350 | cum | 375.77 | ₹1,31,519.5 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
form2911.pdf
Tender Documents • 0.60 MB
BOQ_2517364.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .