Tender Value
₹14 L
EMD Value
₹14,000
Closing Date
21 May 2024, 3:00 pmClosed
SE EDC-II GORA BAZAR RAEBARELI
SE EDC-II GORA BAZAR RAEBARELI
INSTALLATION OF PCC POLES BETWEEN LONG SPAN OF POLE AND REPLACEMENT OF X ARMS
2024_MVVNL_923787_1
TENDER NO 226/EDCR-II/2023-24
Open Tender
Electrical Works
Item Wise
30 days
EE EDD SALON
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
ICICI BANK A/C NO 081205500344/IFSCODE ICIC0000812
₹14,000
Yes
29 May 2024
1 May 2024
22 May 2024
3 May 2024
21 May 2024
3 May 2024
Amount
CORTAGE OF STORE ITEMS FROM ESC TRIPULA RAEBARELI TO DUMP SITE AND DUMP SITE TO WORK SITE ALONGWITH LOADING UNLOADING AND PROPER STACKING:-
8.5 Mtr long PCC Pole.
S.T Pote 11 Mtr long.
ACSR Weasel Conductior
ACSR Rabbit Conductior
Stay Rod
Stay wire (7/10 SWG)
Earthing Complete
Disc Fitting 45 KN (T&C)
11 KV Composit Pin Insulators With Pins
11 KV PIN WITH NUTS
11 KV Composit Disc Insulators 45 KN T&C
11 KV "V" Type X-Arms
"T" OFF Channel (125X65X1300 MM)
ERRECTION & LABOUR CHARGES:-
Diging of pits for ST Pole 11 mtr long From Dump side to pit side then errection of ST pole with including all realted assesories as per RESPPO Norms.
Diging of pits for PCC Pole 8.5 mtr long From Dump side to pit side then errection of PCC pole with including all realted assesories as per RESPPO Norms.
Grouting of ST Pole 11 mtr long with grouting materials as per RESPO Norms.
Grouting of PCC Pole 8.5 mtr long with grouting materials as per RESPO Norms.
Laying , stringing & sagging of ACSR Weasel Conductor, Including all associated work and making clearance of Road with joint/jumpers and binding on insulator as per RESSPO Norms.
Laying , stringing & sagging of Rabbitl Conductor, Including all associated work and making clearance of Road with joint/jumpers and binding on insulator as per RESSPO Norms.
Digging of Pits, fixing nozzling & grouting of Stay Rod inclucing fitting of all accessories with grouting materials as per RESSPO Norms
Earthing of Pole as per RESPO norms.
Work for Installation/fixing of Disc Fitting 45 KN (T&C)
Work for Installation/fixing of Disc Insulator
Work for Installation/fixing of 11 KV Composit Pin Insulators
Work for Installation/fixing of 11 KV Pin with nuts.
Work for Installation/fixing / of Stay Rod .
Work for Installation/fixing/tightening of Stay Wire.
Work for Installation/fixing of "V" Type X-Arms
Work for Installation/fixing of "T" OFF Channel.
Work for Installation/fixing of Holding Clamp for PCC Poles, Material Provided By the Contractor.
Work for Installation/fixing of Stay Insulator, Material Provided by Contractor
Work for Installation/fixing of Danger Board with Clamp, Material Provided by Contractor
Work for / Tightening of Nuts & Bolt, Material Provided by Contractor
Work for Installation/fixing of PG Clamp, Material Provided by Contractor
Work for Installation/fixing of Stone Pad 300X300X75 mm, Material Provided by Contractor
Work for Installation/fixing of Stay Clamp 5/1/2" , Material Provided by Contractor
Work for Installation/fixing of "F" Bracket" , Material Provided by Contractor
G.I Barbed Wire Material Provided By the Contractor.
Work for Fixing of Number Plate with Painting of Number Plate/Mark. Material Provided By the Contractor.
Siddhi Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .