Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹45,000
Closing Date
22 Sept 2026, 3:00 pm
DGM (M and C)
Bhubaneswar
Carrying out re-routing of existing 10.75 inch OD pipe section of Paradip Raipur Ranchi Pipeline PRRPL by Horizontal Directional Drilling HDD method at ch. 116 KM Saraipalli Korba section in Chhattisgarh
2026_ERBBS_191331_1
9320C26A91
Open Tender
Civil Works
Works
150 days
As mentioned in NIT and Tender Document
Please refer Tender documents.
11 documents required · 11 mandatory
₹45,000
Yes
8 Sept 2026
8 Sept 2026
23 Sept 2026
8 Sept 2026
22 Sept 2026
8 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | GST % for the tender
Please select the rate of GST in cell W13. Rate selected shall be applicable for the entire BoQ. | - | - | - | - |
| 10 | Rerouting at Ch.116km_PRRPL-Korba_Works | - | - | - | - |
| 20 | #Design, detailed engineering & installation of pipeline / pipeline & OFC conduit across rivers, NH, SH, Expressways, Railways, etc by HDD method. #Complete work for the crossing (between the limits, as indicated in the approved drawings) including mobilization & de-mobilization at site(s), supply of all materials as per the `Scope of Supply' and all consumables, equipment, manpower & other resources and arranging the required land for site preparations and execution of, but not limited to, the following works in accordance with the specifications, drawings and as per all provisions of the contract document and instructions of the Owner. #Interpretation of data of hydrological / geo-technical surveys furnished by the Owner, carrying out fresh topographic survey of the rivers, NH, SH, Expressways, Railways, etc & developing new profile drawing for the crossing location, carrying out additional surveys required for collecting data relevant to design and construction of the crossing, performing all engineering & design calculations, preparation of all necessary construction drawings for approval of the Owner as per the provisions of contract document, preparation of detailed construction method statement and design analysis. #Taking delivery and transportation of Owner-supplied 3LPE coated pipes to the work site from designated stockpile location, inspection of the coated pipes visually and/or with holiday detector for defects, including arranging all necessary intermediate storage area required thereof till the pipes are installed in permanent position. #Complete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrangement for pipeline stringing, launching etc. #Carrying out repair of pipe defects, replacement in the case of non-repairable defects and repairing damages to pipe coating including defects/ damages occurring during transportation and handling. #Pre-construction surveys and collection of all necessary data. #String preparation including repair of pipe and pipe coating defects, welding, non-destructive testing of welds including 100% radiography (by X-ray), supply of films & all equipment and providing all facilities to Owner's representative(s) for examining radiographs, repair of defects in the welds and re-testing etc. #Coating of the field joints of the pipe string to be installed by HDD method with DIRAX heat shrink sleeves of M/s Raychem's make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make used for HDD crossings. #Repair of all coating damages in the pipe section to be laid by HDD method by full encirclement sleeves using suitable cut sections of approved quality of heat shrink sleeves of M/s Raychem make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make. #Fabrication of 89mm OD steel conduit with an inner duct of 40mm OD HDPE pipe for OFC (wherever OFC has to be laid along with the carrier pipeline). #Supply & fixing of easy to install heat shrinkable duct end caps for HDPE conduit for OFC (wherever OFC has to be laid along with the carrier pipeline). #Carrying out air cleaning, gauge pigging and pre-installation hydrostatic testing of the complete pipeline string, as per the specifications, including repair of defects and retesting etc. #Installation of the pipeline / pipeline and OFC conduit as a bundle crossing below the rivers, NH, SH, Expressways, Railways, etc by single horizontal directional drilling operation to the correct profile as per the approved drawings. #Carrying out post-installation hydrostatic testing of HDD pipe string (along with transition pipe section). #Carrying out post-installation coating survey as per approved procedure. #Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc. #Transportation of surplus Owner-supplied pipes to the designated stockpile location of the Owner. #Preparation of as-built drawings and other records etc. #All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and construction method statement, leading to successful completion of the works. Note:-The Contractor shall have the option for installation of 89 mm OFC conduit as Bundled HDD installation along with the HDD installation of carrier pipe OR as a separate HDD instalation. However, the payment and payment terms shall remain the same in both the cases. | - | - | - | - |
| 30 | 10.75" OD x 0.375" WT in Normal soil | 250 | M | 8,496.12 | ₹21,24,030 |
| 40 | HDD INSTALLATION (101 - 300 METERS (OFC- | 250 | M | 2,271.24 | ₹5,67,810 |
| 50 | 10.75" OD x 0.375" WT in Rocky soil | 20 | M | 23,138.37 | ₹4,62,767.4 |
| 60 | Carrying out Calliper survey for ascertaining the internal geometry of the installed pipeline sections including mobilization/ demobilization of pigging tools, tackles, consumables, accessories and personnel by contractor at work site including magnetic pig, electronic geometry pig, preparation and cleaning of the pipeline sections by running series of foam pigs for cleaning the line from debris, water & making it dry for launching calliper pigs, running of magnetic pig for cleaning of ferrous residue, launching and receiving the electronic & standard calliper pigs, data retrieval, interpretation of data and submission of reports in the form acceptable to the Owner, rectification of defects observed from calliper survey (if HDD is executed by the same contractor), including supply of all labour, materials, equipment & instruments, calliper pigs, fabrication of launching & receiving barrels, all complete as per specifications and directions of Site Engineer / Engineer-in-Charge. | - | - | - | - |
| 70 | 10.75" OD | 1 | LS | 1,90,834.37 | ₹1,90,834.37 |
| 80 | Fixing of temporary header / facility at both ends of the old/new pipeline section, inserting the bi-di pig and carrying out product evacuation by nitrogen purging, as per specification and direction of Engineer-in-Charge including supply of all labour, materials, equipments, instruments, pigs, barrels etc. Complete in all respects. | - | - | - | - |
| 90 | 10.75" OD | 400 | M | 481.1 | ₹1,92,440 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_201631.xls
BOQ • 0.44 MB
AnnexureandSpecifications_13 Commercial Annexure.pdf
Additional Documents • 1.28 MB
AnnexureandSpecifications_Annexure_Commercial.xls
Additional Documents • 0.40 MB
AnnexureandSpecifications_Technical Annexure.pdf
Additional Documents • 34.21 MB
AnnexureandSpecifications_Technical Specifications_CivilSpecification.pdf
Additional Documents • 3.32 MB
AnnexureandSpecifications_Technical Specifications_Hot_Tapping_Spec.pdf
Additional Documents • 0.63 MB
AnnexureandSpecifications_Technical Specifications_Mechanical_Material_Spec.pdf
Additional Documents • 1.19 MB
AnnexureandSpecifications_Technical Specifications_SafetyPracticesDuringConstruction.pdf
Additional Documents • 0.69 MB
AnnexureandSpecifications_Technical Specifications_TCP_Works_Spec.pdf
Additional Documents • 7.09 MB
TenderDocument9320C26A91.pdf
Tender Documents • 10.20 MB
Bidders_help_Document_for_Preferencial_Bidding_20230207_v1.pdf
Additional Documents • 0.82 MB
Special_Instructions_to_the_Bidders_Version_5_dated_30_June_2025.pdf
Additional Documents • 2.80 MB
Tender-Acceptance-Format.pdf
Additional Documents • 0.08 MB
FAQs-IOCL-Online-EMD.pdf
Additional Documents • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .