| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC 134 1 SAKTHI THEATER STREET NEHRU NAGAR KARUMALAIKOODAL METTUR DAM 02 | METTUR DAM | TAMIL NADU | ₹2.2 L Quoted ₹2.3 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | Natesan Engineering Contractor L1 |
|---|---|---|---|---|
| 1.00 | Charges for Removal of LT modules from the racks, cleaning, tightness checking of all components and terminals, lubrication and racking, in concerned racks. For cleaning 1/3, 1/5, 1/6, 2/6, 1/7, 1/9, 2/7, 1/8,2/8, 1/10, 2/9, 3/9, 2/10 & 3/10 Size LT Modules | 476 | Nos | 100 ₹47,600 |
| 2.00 | a) For cleaning ½, 2/3, 2/5, 3/5, 3/7, 4/7, 4/9, ¾ & 4/8 size LT Modules. | 195 | Nos | 201 ₹39,195 |
| 3.00 | Charges for Removal of LT breakers from its chamber, cleaning the breakers, tightness checking of all bolts and nuts, applying lubrication, checking the trip & close operations of the breakers and put back the breakers in the breaker chamber. | 11 | Nos | 1,615 ₹17,765 |
| 4.00 | Charges for Checking of the tightness of all bus bar joints, cleaning of the bus bars, support insulators, FRB Insulation sheets and outgoing cable chamber. | 399 | Ltrs | 155 ₹61,845 |
| 5.00 | Charges for Removing the top covers of LT Switch gear & Auxiliary control Panel, cleaning and tightness checking of Main bus and incoming cable chamber. | 3 | Nos | 12,160 ₹36,480 |
| 6.00 | Charges for Cleaning of Electronic control Panels & tightness checking of Power contactors & Switch fuse units. | 84 | Nos | 300 ₹25,200 |
| 7.00 | Material cost for CRC | 9 | Nos | 420 ₹3,780 |
| 8.00 | Cost of Consumables for cleaning LT switchgear at ESP I,II & IV | 1 | Nos | 2,365 ₹2,365 |
Tender Value
Refer Docs
EMD Value
₹2,200
Closing Date
27 May 2025, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER MTPS-I METTUR DAM
MTPS-I ES EM-II SD-III Cleaning of the main busbars, vertical bus droppers, LT breaker panels, LT breakers and LT modules of LT switchgear, Auxiliary control panel Electronic control panels at ESP Unit I ,II IV during the respective Unit Annual Cap
2025_EB_555246_1
CE-MTPSI-SE-ES-EMII-OT23-25-26
Open Tender
Electrical Works
15 days
MTPS-I/METTURDAM
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
₹2,200
Yes
12 Mar 2026
8 May 2025
28 May 2025
8 May 2025
27 May 2025
8 May 2025
8 May 2025 - 27 May 2025
Amount
Charges for Removal of LT modules from the racks, cleaning, tightness checking of all components and terminals, lubrication and racking, in concerned racks. For cleaning 1/3, 1/5, 1/6, 2/6, 1/7, 1/9, 2/7, 1/8,2/8, 1/10, 2/9, 3/9, 2/10 & 3/10 Size LT Modules
a) For cleaning ½, 2/3, 2/5, 3/5, 3/7, 4/7, 4/9, ¾ & 4/8 size LT Modules.
Charges for Removal of LT breakers from its chamber, cleaning the breakers, tightness checking of all bolts and nuts, applying lubrication, checking the trip & close operations of the breakers and put back the breakers in the breaker chamber.
Charges for Checking of the tightness of all bus bar joints, cleaning of the bus bars, support insulators, FRB Insulation sheets and outgoing cable chamber.
Charges for Removing the top covers of LT Switch gear & Auxiliary control Panel, cleaning and tightness checking of Main bus and incoming cable chamber.
Charges for Cleaning of Electronic control Panels & tightness checking of Power contactors & Switch fuse units.
Material cost for CRC
Cost of Consumables for cleaning LT switchgear at ESP I,II & IV
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF