Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.4 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹41.4 L+₹3.0 L (7.85%)Rejected-Finance | L2 | Rejected-Finance BEING L2 REJECTED | |
| 3 | L3₹42.3 L+₹3.9 L (10.2%)Rejected-Finance 702 A1 SHREE PRASAD TAWADEWADI SHREE DATTAGURU PARK KUMBHARWADA URAN DIST RAIGAD MAHARASHTRA 400 702 | URAN | RAIGAD | MAHARASHTRA | 400702 | L3 | Rejected-Finance BEING L3 REJECTED | |
| 4 | L4₹43.9 L+₹5.5 L (14.4%)Rejected-Finance | L4 | Rejected-Finance BEING L4 REJECTED | |
| 5 | L5₹44.6 L+₹6.2 L (16.1%)Rejected-Finance | L5 | Rejected-Finance BEING L5 REJECTED |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
11 Sept 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE NW KARANJA
NAVAL STATION KARANJA, URAN, RAIGAD, MAHARASHTRA
REPAIRS OF EXTERNAL WALL TREATMENT OF CERTAIN BLDGS OF NOFRA AND CHUNABHATTI UNDER AGE B/R-I AT NAVAL STATION KARANJA
2023_MES_613687_1
8707/E8
Open Tender
Civil Works
Item Rate
180 days
GE NW KARANJA
D and above
8 documents required · 8 mandatory
₹500
Yes
GE NW KARANJA
₹90,000
Yes
3 Nov 2023
14 Aug 2023
13 Sept 2023
14 Aug 2023
11 Sept 2023
28 Aug 2023
Amount
Notes : (i) The work consists of 01 job as under:- JOB (A) : TPP NO. 14 OF YR 2023-24 (ii) Please refer schedule 'A' notes before quoting the tender. (iii) Amount of Schedule of Credit shall be deducted off line by the department. ITEMS FOR JOB 'A'
Note:- The Unit Rate quoted in r/o Ser item No 1.02 to 1.08 are deemed to include for the following and nothing extra will be paid for these works: 1. Supplying, erecting and use of scaffolding upto required height (max 25 to 30m) or upto 8th floor height with necessary H-frames, pipes, couplers, buckles, bracing, top platform with support railing at top etc. at all levels of building including carriage of the materials to the location, erecting, fixing the scaffolding and dismembering the same after working and taking away the scaffolding materials etc. complete as per direction of Engineer-in-charge. 2. Supplying, erecting & use of temporary bamboo scaffolding around the building as required. The scaffolding is to be secured properly in position by bracings, ties clamps, etc. complete including providing and erecting working platform at all heights as required, including removal after completion of work all as per direction of Engineer-in-Charge.
Taking down cement or cement lime plaster, any description on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc. complete all as specified and directed.
M&L 20 mm thick polymer modified ready mix cement based plaster on external surfaces complete all as specified and directed.
M&L 15 mm thick ready mixed cement base plaster on internal surfaces on brick or concrete surfaces complete all as specified and directed.
M&L for new or old external wall surface by wire brushing/grinding in order to remove dust, dirt, loose particles, laitance. Thereafter wash the surface with mechanical water nozzal with clean water & allow to dry. Fill visible cracks/ joints by non-shrinkable polymer modified crack sealing compound (Asian Paints, Berger Paints or Equivalent) by opening the cracks in V-Groove & allow it to dry for 24 hours. Apply one coat of undilted fibre reinforced liquid applied elastomeric waterproofing membrane, impregnated with synthetic fibre (PU modified) (with mechanically airless paint sprayer machine) and allow it to dry for 6 hours appx. The coverage should be approx 4sqm/ltr/coat. Thereafter apply 02 coats of 100% acrylic emulsion water based top coat with silicone additives and having rich sheen (Approx Coverage 5-5.5sqm/ltr/2coats) (with mechanically airless paint sprayer machine) & match with brush at the interval of 08 hours between the coat and allow to dry to match the existing shade including necessary scaffolding necessary security for the workers for any height, covering etc complete all as per specified and directed. Note : This item should be executed by authorised applicator only of the manufacturer.
Providing and applying jacketing around columns with Micro concrete (Molith-MC) M30 including all lifts, shuttering, scaffolding, complete all as specified and directed.
M&L for injection chemical GLYPHOSPHATE (4% Concentration) of 20 ml or till refusal by making cut / injection in the stem of plant of roots at 30 mm and sparaying with solution 25 ml GLYPHOSPHATE (4% concentration diluted with 1 ltr of water) and removing the Plant / vegetation of following girth including penetrated roots complete including necessory scaffolding etc for plants / vegetation of size 0-20 cm girth for buildings upto and including 4 storeys height complete all as specified and directed.
M&L for Silicon gun paste around windows of any type and size and at any height of the building by using necessary scaffolding complete all as specified and directed.
Colaba Group Works
Sagar Electricals
Everest Construction
Har Siddhi Buildcon
SAI ENTERPRISES
INDIA ENGINEERS AND CONTRACTORS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .