Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.9 LAccepted-Finance TUTICORIN TAMIL NADU | ₹24.9 L | 1 | Accepted-Finance Price Bid is evaluated |
| 2 | 2₹27.2 LAccepted-Finance 5A 582 CALDWELL COLONY TUTICORIN 628008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | ₹27.2 L | 2 | Accepted-Finance Price Bid is evaluated |
| Sl No | Description | Qty | Unit | S YOGARAJ CONTRACTOR L1 | CKEE ENGINEERING PRIVATE LIMITED L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for renewal of defective boiler tubes of size 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test. | 450 | No. | 23,16,600 ₹27.3 L | 25,27,200 ₹29.8 L |
| 2.00 | Charges for leading lifting of scaffolding materials and erection of platform and scaffolding at S.H/W.W screen tube area & Economiser Hopper area to conduct Boiler tube thickness survey and tube rectification work and removal of platform and scaffolding. | 1 | No. | 76,623 ₹90,415.14 | 83,588 ₹98,633.84 |
| 3.00 | Charges for transportation, erection and welding of New/ SH Stainless Steel erosion protection shields of various sizes (Straight/ bend) with/without clamps on the pressure parts tubes/bends, including the cost of SS welding electrodes. | 400 | No. | 96,000 ₹1.1 L | 1,04,800 ₹1.2 L |
Tender Value
Refer Docs
EMD Value
₹22,600
Closing Date
26 Feb 2026, 2:00 pmClosed
CE/ TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin
TTPS Mech II BM Unit I Replacement of plugged Economizer coil assemblies in Unit I Boiler during overhaul for the year 2025 2026
2026_EB_654252_1
CE/TTPS/SE/M-II/No.421/2025-26
Open Tender
Miscellaneous Works
40 days
TTPS
As per BQR conditions in NIT
8 documents required · 8 mandatory
₹0
₹22,600
Yes
2 Mar 2026
10 Feb 2026
27 Feb 2026
10 Feb 2026
26 Feb 2026
10 Feb 2026
Charges for renewal of defective boiler tubes of size 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test.
Charges for leading lifting of scaffolding materials and erection of platform and scaffolding at S.H/W.W screen tube area & Economiser Hopper area to conduct Boiler tube thickness survey and tube rectification work and removal of platform and scaffolding.
Charges for transportation, erection and welding of New/ SH Stainless Steel erosion protection shields of various sizes (Straight/ bend) with/without clamps on the pressure parts tubes/bends, including the cost of SS welding electrodes.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_784507.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid