Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.3 LAccepted-Finance | ₹30.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹30.3 LAccepted-Finance N A | PALWAL | HARYANA | 121004 | ₹30.3 L | L2 | Accepted-Finance L2 |
| 3 | Rejected-Technical GRAM SHAHAJHPUR NINAIYAN TEHSIL AKBARPUR KANPUR DEHAT 209115 | KANPUR DEHAT | UTTAR PRADESH | 209115 | - | - | Rejected-Technical Experience Certificate not found as per Tender Rules NIT |
| Sl No | Description | Qty | Unit | M/S MAHESH KUMAR DIXIT L1 | M/S MAHAJAN CONSTRUCTION AND SUPPLIER L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation including lead upto 30 m & Lift above 1.5 m, excluding mechanical compaction but including manual compaction and dressing to profile. for making road diversion | 905.03 | Cum | 129 ₹1,16,748.87 Lowest | 129.39 ₹1,17,101.83 |
| 2.00 | Earth work in foundation in all type of soil with all lead &lift including T&P etc. required for proper completion work. | 267.68 | Cum | 111.53 ₹29,854.35 Lowest | 111.53 ₹29,854.35 Lowest |
| 3.00 | Cement concrete 1:3:6 in foundation with (1 cement :3 coarse sand : 6 stone balast 40 mm nominal size all cost of material, labour T&P etc. required for proper completion work. | 74.48 | Cum | 6,000 ₹4,46,880 Lowest | 6,000 ₹4,46,880 Lowest |
| 4.00 | Class -150 brick work in 1:4 (1 cement :4 coarse sand ) all cost of material, labour , T&P etc. required for proper completion work. | 182.7 | Cum | 5,175 ₹9,45,472.5 Lowest | 5,175 ₹9,45,472.5 Lowest |
| 5.00 | Cement concrete 1:1.5: 3 in bed block with(1 cement :1.5 coarse sand :3 stone grite 20 mm nominal size all cost of material labour , T&P etc. required for proper completion work. | 64.89 | Cum | 9,350 ₹6,06,721.5 Lowest | 9,350 ₹6,06,721.5 Lowest |
| 6.00 | Mild steel or iron plain work such as reinforsement concrete wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & over laping &hooks. | 3,745.49 | Kg | 65.7 ₹2,46,078.69 Lowest | 65.7 ₹2,46,078.69 Lowest |
| 7.00 | Supply and fixing Expansion joint filler board material for expeansion joint all cost of material, labour , T&P etc. required for proper completion work. | 41.58 | Sqm | 470 ₹19,542.6 Lowest | 470 ₹19,542.6 Lowest |
| 8.00 | Supply and fixing tarfelt on c.c. bed block with all cost of material, labour, T&P etc. required for proper completion work. | 32.34 | Sqm | 106 ₹3,428.04 Lowest | 106 ₹3,428.04 Lowest |
| 9.00 | Supply and fixing C.I.Pipe (Length 60 cm) 150 mm Dia with all cost of material, labour, T&P etc. required for proper completion work. | 28 | No | 604.92 ₹16,937.76 Lowest | 604.92 ₹16,937.76 Lowest |
| 10.00 | Supply and fixing wheel guard with all cost of material ,labour , T&P etc. required for proper completion work. | 28 | No | 289.87 ₹8,116.36 Lowest | 289.87 ₹8,116.36 Lowest |
Tender Value
₹30.3 L
EMD Value
₹60,556
Closing Date
8 Jun 2026, 4:00 pmClosed
EE UDSC UNNAO
EE UDSC CIVIL UNNAO
Re-construction of V.R.Bs. at Km. 3.900 of Dudhawan Mr., Km. 0.700 and km. 1.900 of Hamirgaon Mr., Km. 2.000 of Ushuru Mr., Km. 2.200 of Govindpur Mr.and Km. 6.800 and Km. 9.500 of Sareni Dy.
2026_UPIDC_1150812_2
01/EE-UDSC/2026-27
Open Tender
Civil Works
Item Wise
180 days
UNNAO
3 documents required · 3 mandatory
₹2,724
₹60,556
3 Jul 2026
1 Jun 2026
8 Jun 2026
2 Jun 2026
8 Jun 2026
2 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation including lead upto 30 m & Lift above 1.5 m, excluding mechanical compaction but including manual compaction and dressing to profile. for making road diversion | 905.03 | Cum | - | - |
| 2 | Earth work in foundation in all type of soil with all lead &lift including T&P etc. required for proper completion work. | 267.68 | Cum | - | - |
| 3 | Cement concrete 1:3:6 in foundation with (1 cement :3 coarse sand : 6 stone balast 40 mm nominal size all cost of material, labour T&P etc. required for proper completion work. | 74.48 | Cum | - | - |
| 4 | Class -150 brick work in 1:4 (1 cement :4 coarse sand ) all cost of material, labour , T&P etc. required for proper completion work. | 182.7 | Cum | - | - |
| 5 | Cement concrete 1:1.5: 3 in bed block with(1 cement :1.5 coarse sand :3 stone grite 20 mm nominal size all cost of material labour , T&P etc. required for proper completion work. | 64.89 | Cum | - | - |
| 6 | Mild steel or iron plain work such as reinforsement concrete wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & over laping &hooks. | 3,745.49 | Kg | - | - |
| 7 | Supply and fixing Expansion joint filler board material for expeansion joint all cost of material, labour , T&P etc. required for proper completion work. | 41.58 | Sqm | - | - |
| 8 | Supply and fixing tarfelt on c.c. bed block with all cost of material, labour, T&P etc. required for proper completion work. | 32.34 | Sqm | - | - |
| 9 | Supply and fixing C.I.Pipe (Length 60 cm) 150 mm Dia with all cost of material, labour, T&P etc. required for proper completion work. | 28 | No | - | - |
| 10 | Supply and fixing wheel guard with all cost of material ,labour , T&P etc. required for proper completion work. | 28 | No | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
Tendernotice_2.pdf
PDF • 1.07 MB
BOQ_2166312.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].