| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17.7 CrAccepted-Finance BHAGATPUR SHIVPUR VARANASI | VARANASI | UTTAR PRADESH | 221001 | 1 | Accepted-Finance First Lowest Bidder | |
| 2 | 2₹17.8 Cr+₹7.2 L (0.40%)Rejected-Finance DARSAN NAGAR AYODHYA 224001 | AYODHYA | AYODHYA | UTTAR PRADESH | 224001 | 2 | Rejected-Finance Second Lowest Bidder |
Tender Value
₹17.9 Cr
EMD Value
₹35.8 L
Closing Date
6 Oct 2026, 3:00 pmClosed
General Manager, Zone-1, Prayagraj
General Manager, Zone-1, UP Projects Corporation Ltd., Prayagraj
Construction of the Chief Ministers Model Composite School Preprimary to Class 12 at Saidpur, Gram Panchayat-Maudha, District Ghazipur Second Tehsil.
2026_UPPRC_1191261_1
45/UPPCL/GM-1/2026-27/E-TENDER Dated 16-09-2026
Open Tender
Civil Works - Buildings
Percentage
720 days
Saidpur, Gram Panchayat-Maudha, District-Ghazipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
₹35.8 L
Yes
Prayagraj
14 Oct 2026
29 Sept 2026
6 Oct 2026
29 Sept 2026
6 Oct 2026
29 Sept 2026
29 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Work | - | - | - | - |
| 2 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. | 2,879.65 | CUM | 185.45 | ₹5,34,016.69 |
| 3 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 5,397.37 | CUM | 499.06 | ₹26,93,611.47 |
| 4 | Providing and laying in cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size) and curing complete,including cost of form- work, in foundation and floors.(P.C.C) | 492.62 | CUM | 4,853.07 | ₹23,90,719.34 |
| 5 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and including watering, dressing etc rate to include cost of all materials labour T & P etc required for proper completion of work. | 515.04 | CUM | 1,513.02 | ₹7,79,265.82 |
| 6 | Construction of drain along with apron. (150X150MM) | 738.75 | RM | 763.65 | ₹5,64,146.44 |
| 7 | Providing and injecting chemical emulsion for pre constructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete.(4) Treatment junction of wall and the floor 7.5 liters /sqm (5) Treatment of soil along external perimeter of building 7.5 liters/sqm (6) Treatment of soil under apron along external perimter 5 liters/sqm. (As per manufacturer's standard dilution) | 3,368.82 | SQM | 220.89 | ₹7,44,138.65 |
| 8 | Providing and laying in position ready mixed or sitebatched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana /Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement..All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum R.C.C. work in Lintel | 24.36 | CUM | 7,024.83 | ₹1,71,124.86 |
| 9 | Providing and laying in position ready mixed or sitebatched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana /Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement..All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum R.C.C. work in slab | 870.45 | CUM | 7,024.83 | ₹61,14,763.27 |
| 10 | Providing and laying in position ready mixed or sitebatched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana /Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement..All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum R.C.C. work in Plinth Beam | 136.26 | CUM | 6,771.46 | ₹9,22,679.14 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.42 MB
TenderDocument.pdf
Tender Documents • 19.33 MB
BOQ_2246303.xls
BOQ • 1.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .