| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.0 LAdmitted-Fee/PreQual/Technical/Finance | ₹18.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹18.3 L+₹28,450 (1.58%)Admitted-Fee/PreQual/Technical/Finance | ₹18.3 L+₹28,450 (1.58%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | R SARAVANA KUMAR L1 | GOLDSON CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00Construction of Carpentry with Pottery Work Shop to Aggal (Pudhu Kotagiri) in Kotagiri Municipality | |||||
| 1.01 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS 20B and Sand, silt or other loose soil, wet sand, silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed, cleaning and levelling the site etc., complete. | 42 | M3 | 340 ₹14,280 Lowest | 345 ₹14,490 |
| 1.02 | Plain Cement concrete 1:4:8 (one cement, four sand, eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted,etc., complete complying with standard specfication. | 14 | M3 | 7,319 ₹1,02,466 Lowest | 7,430 ₹1,04,020 |
| 1.03 | Plain Cement concrete 1:2:4 (one cement, Two sand, Four aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted,etc., complete complying with standard specfication. | 5 | M3 | 9,008 ₹45,040 Lowest | 9,145 ₹45,725 |
| 1.04 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation -COLUMN | 66 | M2 | 796 ₹52,536 Lowest | 808 ₹53,328 |
| 1.05 | Grade Beam | 40 | m2 | 855 ₹34,200 Lowest | 868 ₹34,720 |
| 1.06 | Slab and Beam | 145 | M2 | 1,342 ₹1,94,590 Lowest | 1,362 ₹1,97,490 |
| 1.07 | Supply and fabrication of steel required for all RCC items of works involved in the schedule, cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as as per design given and specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc complete as per standard specification | 2,700 | Kg | 105 ₹2,83,500 Lowest | 107 ₹2,88,900 |
| 1.08 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | 9 | M3 | 11,053 ₹99,477 Lowest | 11,221 ₹1,00,989 |
| 1.09 | Ground Floor | 18 | M3 | 11,182 ₹2,01,276 Lowest | 11,352 ₹2,04,336 |
Tender Value
₹19.8 L
EMD Value
₹24,600
Closing Date
1 Jun 2026, 3:00 pmClosed
COMMISSIONER
MUNICIPAL OFFICE KOTAGIRI
Construction of Carpentry with Pottery Work Shop to Aggal (Pudhu Kotagiri) in Kotagiri Municipality
2026_MAWS_678741_1
76/2026/A1
Open Tender
Civil Works
Works
60 days
KOTAGIRI
REGISTERED CONTRACTOR IN GOVT SECTOR
1 document required · 1 mandatory
₹1,770
Yes
₹24,600
Yes
4 Jun 2026
29 May 2026
1 Jun 2026
29 May 2026
1 Jun 2026
29 May 2026
29 May 2026 - 1 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Carpentry with Pottery Work Shop to Aggal (Pudhu Kotagiri) in Kotagiri Municipality | |||||
| 1.01 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS 20B and Sand, silt or other loose soil, wet sand, silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed, cleaning and levelling the site etc., complete. | 42 | M3 | - | - |
| 1.02 | Plain Cement concrete 1:4:8 (one cement, four sand, eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted,etc., complete complying with standard specfication. | 14 | M3 | - | - |
| 1.03 | Plain Cement concrete 1:2:4 (one cement, Two sand, Four aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted,etc., complete complying with standard specfication. | 5 | M3 | - | - |
| 1.04 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation -COLUMN | 66 | M2 | - | - |
| 1.05 | Grade Beam | 40 | m2 | - | - |
| 1.06 | Slab and Beam | 145 | M2 | - | - |
| 1.07 | Supply and fabrication of steel required for all RCC items of works involved in the schedule, cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as as per design given and specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc complete as per standard specification | 2,700 | Kg | - | - |
| 1.08 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | 9 | M3 | - | - |
| 1.09 | Ground Floor | 18 | M3 | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
BOQ_815440.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .