Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-Finance AKHADAPURA MOTH DISTT JHANSI | JHANSI | JHANSI | UTTAR PRADESH | ₹6.3 L | L1 | Accepted-Finance Low Rate |
| 2 | L2₹6.3 LRejected-Finance | ₹6.3 L | L2 | Rejected-Finance High Rate |
Tender Value
Refer Docs
EMD Value
₹13,000
Closing Date
8 Apr 2026, 1:30 pmClosed
Executive Engineer
UPSCIDCO Jhansi
Vill. Poonch Tehsil Moth Janpad Jhansi me shri Kallu Rajpoot ke makan se Shri Ashok Kumar Tiwari ke makan tak Nala nirman karya. Under scheme B.V.N. 2025-26 Hon ble Shri Babulal Tiwari Ji, MLC Jhansi
2026_SCIDC_1132122_1
107/EE/Jhansi/ET/2025-26
Open Tender
Civil Works - Others
90 days
Poonch Janpad Jhansi
Please refer the tender documents
2 documents required · 2 mandatory
₹1,062
Yes
UPSCIDCO
₹13,000
Yes
2 May 2026
1 Apr 2026
8 Apr 2026
1 Apr 2026
8 Apr 2026
1 Apr 2026
1 Apr 2026 - 8 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Nala Nirman karya | |||||
| 1.01 | Excavation in foundation in ordinary soil (loam caly, or sand). Including lift upto 1.5 mt. (5 ft.) and lead upto 30 mt. (100 fts.) and including filling waterning and raiming of excavated earth in the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and dispsal of surplus earth as directed by the engeeneer in-charge upto a distance of 30 mt. from the foundation and trenches. | - | cum | - | - |
| 1.02 | Concrete with 4 mm. (1.5") gauge Stone ballast fine local sand of 1.25 Fitness modulouse and cement in Proportion of 1:3:6 , in foundation and under floors including supply of all materials labour and T&P etc. required for proper completion of the work. (1:3:6) | - | cum | - | - |
| 1.03 | RCC work with Cement, approved coarse sand, 20 mm gauge stone grit in the proportion 1:1.5:3 including centering and shuttering, lab, mat, and T&P all complete but excluding supply of reinfgorcement and its bending (SI No. 283).PAGE NO 40 | - | cum | - | - |
| 1.04 | Mild Steel or iron work in RC/Brick work including cutting and bending for proper completion of the work etc. all complete. (S.I. No. 504) 1.0% Qty of rcc work = 1.0x7850x% | 0.2 | Kg | - | - |
| 1.05 | Add sign board | - | No | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.18 MB
punchkallunit.pdf
Tender Documents • 7.17 MB
BOQ_2112807.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid