Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical SHOP NO AL 1 GROUND FLOOR SUVIDHA COMPLEX VASCO DA GAMA 403802 INDIA | SOUTH GOA | GOA | 403802 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical SHANTINAGAR 670 1 AIRPORT HIGHWAY ROAD VASCO DA GAMA 403802 INDIA | SOUTH GOA | GOA | 403802 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical D 2 28 GIDC INDUSTRIAL ESTATE ZUARINAGAR SANCOALE SOUTH GOA GOA 403726 | SOUTH GOA | GOA | 403726 | Admitted-Fee/PreQual/Technical |
Tender Value
₹7.9 L
EMD Value
₹15,800
Closing Date
11 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer
Office of Chief Engineer, Engineering (Civil) Dept., Mormugao Port Authority, SAARASI, Headland Sada, Mormugao, Goa 403804
Reconstruction of collapsed compound wall along gate no.1 to gate no.2 road in MOHP area (Balance Works)
2026_mptgo_931236_1
CE/56/2026
Open Tender
Construction Works
Percentage
90 days
MOHP Area
Please refer Tender documents.
8 documents required · 8 mandatory
₹590
Yes
Mormugao Port Authority, FA and CAO
₹15,800
Yes
12 Nov 2026
22 Oct 2026
12 Nov 2026
22 Oct 2026
11 Nov 2026
28 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in dense or hard soil/murrum etc. including removal of obstructions such as small trees, vegetation etc. and removal of excavated material upto a lead of 50m and a lift of 1.5m including refilling foundation trenches. All labours and material etc. complete. | 3.5 | Cum | 1,406 | ₹4,921 |
| 2 | Excavation in loose or soft/sandy soil including removal of obstructions such as small trees, vegetation etc. and removal of excavated material upto a lead of 50m and a lift of 1.5m including refilling foundation trenches. All labour and material etc. complete. | 1.75 | Cum | 684 | ₹1,197 |
| 3 | Excavation in hard rock, laterite boulders interspersed with murrum etc. including removal of obstruction such as small trees, vegetation etc., refilling the trenches with suitable excavated material or earth removed from nearby areas and removal of unsuitable excavated material upto a lead of 50m and a lift of 1.5m. All labour and material etc. complete. | 1.75 | Cum | 4,686 | ₹8,200.5 |
| 4 | Soiling with hard laterite rubble stone of 20 cm to 30 cm size including hand packing etc. complete. All labour & material etc. complete | 25 | Cum | 1,750 | ₹43,750 |
| 5 | Cement concrete (1:3:6) using 40mm graded black trap stone metal out of quarried boulders as coarse aggregate including mixing, depositing, consolidating, levelling, curing etc., All labour & material etc. complete. | 1 | Cum | 5,821 | ₹5,821 |
| 6 | Providing and laying Reinforced RMC M25 grade cement concrete using 20mm graded black trap stone metal out of quarried boulders as coarse aggregate including mixing, depositing, consolidating, levelling, curing for RCC wall of compound wall etc. all labour and material etc. complete. | 26 | Cum | 11,244 | ₹2,92,344 |
| 7 | Providing & fixing shuttering for the compound wall foundation of size and shape as directed including cleaning, oiling, closing, gaps, removing shuttering after concreting, provisions of necessary props, bracings and other supports etc. All labours and material etc. complete | 174 | m2 | 568 | ₹98,832 |
| 8 | Providing and fixing reinforcement with TMT Fe-500 dowel bars conforming to IS: 1786 or equivalent including cutting, bending, tying grills, placing in position, holding in position during concreting etc. including cost of binding wire. All labour & material etc. complete | 450 | Kg | 89.71 | ₹40,369.5 |
| 9 | Supplying & erecting in position structural steel work in single section ( light sections less than 34 kg./m) incl. Cutting, hoisting, fixing in position and cleaning the surface, painting two coats of approved quality synthetic enamel paint of approved colour/ shade over a coat of redoxide zinc chromite primer etc. All labour & materials tools & plant etc. complete | 220 | Kg | 135 | ₹29,700 |
| 10 | Supplying and providing approved (as per existing) concertina wire call fencing 610mm diameter with 26/27 swg barbed concertina. etc. complete. | 45 | mtr | 827 | ₹37,215 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
Tender_document.pdf
Tender Documents • 4.72 MB
BOQ_978579.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .