| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC TUTICORIN | TUTICORIN | TAMIL NADU | 626202 | ₹2.5 L Quoted ₹2.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.1 LRejected-AOC 40 E SUNDARAVELPURAM 7TH STREET TUTICORIN 628 002 | TUTICORIN | TAMIL NADU | 628002 | ₹3.1 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | PANDIAN ENTERPRISES L1 | S. MURUGAN CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for construction of RCC pedestal 30 no's of size 0.7 X 0.7 X 0.8 mtrs for erection of cable tray support columns for the length about 45 mtrs including materials and T&P Hire charges -Providing shuttering arrangements for supporting the reinforced cement concrete surfaces for construction of new pedestal rate including cost of all labour, lead, lift, tools etc., complete. | 67.2 | Sq.mtr. | 40,320 ₹47,577.60 | 43,680 ₹51,542.40 |
| 2.00 | Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tieing and fixing in position including cost of all materials, labour, binding wire, lead, lift, etc., complete. | 11.76 | Cu.mtr. | 1,411.2 ₹1,665.22 | 1,528.8 ₹1,803.98 |
| 3.00 | Providing RCC 1:1.5:3 using OP/PP cement with 12 to 20 mm including cost of all materials, labours, lead, lift, curing, etc., complete - excluding cost of reinforcement and form work. | 13.52 | Cu.mtr. | 1,48,720 ₹1.8 L | 1,62,240 ₹1.9 L |
| 4.00 | Charges for dismantling the worn out MS Structurals and loading the worn out structurals and plates, transporting to central store for devolution of scrab materials, including T & Ps charges and consumables etc., | 360 | Kg. | 5,400 ₹6,372 | 7,200 ₹8,496 |
| 5.00 | Supplying and fabricating and forming in position of new angle channel & beam as directed carefully without any disturbance to other steel structure rate including cost of all materials hire charges for welding and cutting machine, welding rods including labour lead lift safety appliances etc., complete. | 624.6 | Kg. | 59,337 ₹70,017.66 | 62,460 ₹73,702.80 |
| 6.00 | Charges for painting of one coat red oxide and two coats of enamel gray paint for the newly fabricated cable tray including cost of paint, consumables etc., complete. | 62.86 | Sq.mtr. | 13,200.6 ₹15,576.71 | 14,143.5 ₹16,689.33 |
| 7.00 | Charges for fabrication and erection of structural supports for cable gallery strengthening in the cable gallery in the area between SCH-II & Nearby Old Crusher for the length of 45 mtrs. | 360 | Kg. | 14,400 ₹16,992 | 18,000 ₹21,240 |
Tender Value
Refer Docs
EMD Value
₹2,800
Closing Date
6 Jan 2026, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
ECHP-II- Strengthening of existing weak cable gallery structure from back side of SCH-II to near by old crusher by providing side support works.
2025_EB_634669_1
CE/SE/MI/TTPS/194/2025-2026
Open Tender
Miscellaneous Works
30 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,800
Yes
26 Mar 2026
20 Dec 2025
7 Jan 2026
20 Dec 2025
6 Jan 2026
20 Dec 2025
Charges for construction of RCC pedestal 30 no's of size 0.7 X 0.7 X 0.8 mtrs for erection of cable tray support columns for the length about 45 mtrs including materials and T&P Hire charges -Providing shuttering arrangements for supporting the reinforced cement concrete surfaces for construction of new pedestal rate including cost of all labour, lead, lift, tools etc., complete.
Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tieing and fixing in position including cost of all materials, labour, binding wire, lead, lift, etc., complete.
Providing RCC 1:1.5:3 using OP/PP cement with 12 to 20 mm including cost of all materials, labours, lead, lift, curing, etc., complete - excluding cost of reinforcement and form work.
Charges for dismantling the worn out MS Structurals and loading the worn out structurals and plates, transporting to central store for devolution of scrab materials, including T & Ps charges and consumables etc.,
Supplying and fabricating and forming in position of new angle channel & beam as directed carefully without any disturbance to other steel structure rate including cost of all materials hire charges for welding and cutting machine, welding rods including labour lead lift safety appliances etc., complete.
Charges for painting of one coat red oxide and two coats of enamel gray paint for the newly fabricated cable tray including cost of paint, consumables etc., complete.
Charges for fabrication and erection of structural supports for cable gallery strengthening in the cable gallery in the area between SCH-II & Nearby Old Crusher for the length of 45 mtrs.
S. MURUGAN CONTRACTOR (BID ID -1546699)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_759451.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid