Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.9 LAdmitted-Finance | -1.50% | ₹20.9 L | L1 | Admitted-Finance |
| 2 | L2₹21.1 L+₹21,173.97 (1.02%)Admitted-Finance | -0.50% | ₹21.1 L+₹21,173.97 (1.02%) | L2 | Admitted-Finance |
Tender Value
₹21.2 L
EMD Value
₹42,360
Closing Date
10 Aug 2026, 12:00 pmClosed
EE RED Ayodhya, Vikas Bhawan, Ayodhya
EE RED Ayodhya, Vikas Bhawan, Ayodhya
Under District Ayodhya, Construction work of CC road from main road to Kali paved road in Samaha Kala, Lot No 1
2026_REDUP_1174035_1
555/EE RED Ayodhya/26-27 Dt 04/05/2026
Open Tender
Civil Works
Percentage
90 days
AYODHYA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹42,360
EE RED Ayodhya, Vikas Bhawan, Ayodhya
19 Aug 2026
1 Aug 2026
10 Aug 2026
1 Aug 2026
10 Aug 2026
1 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
| - | Excavation for foundation in ordinary soil including normal lead and lift with all completion of work and including disposal upto three chain minimum. | 16.15 | Cum | 372.27 | ₹6,012.16 |
| - | Concrete with 40mm gauge Stone ballast ballast / stone ballast ,f/sand & cement in proportion of 6;3;1 in foundation and under floors including supply of all materials,labour and T & P etc,required for proper completion of the work. | 7.13 | Cum | 3,752.5 | ₹26,755.33 |
| - | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 78.38 | Cum | 3,318.35 | ₹2,60,092.27 |
| - | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. | 47.03 | Cum | 4,287.35 | ₹2,01,634.07 |
| - | First class b/w in 1:4 in cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc required for proper completion of work. | 26.22 | Cum | 6,498.15 | ₹1,70,381.49 |
| - | 15 CM CC Road 1/1.5/3 C/CS/20mm Stone Ballast | 142.5 | Cum. | 8,988.9 | ₹12,80,918.25 |
| - | E/W Cutting and filing in odinary Soil with Cartage | 531.43 | Sqm. | 315.4 | ₹1,67,613.02 |
| - | S&F of Display Information Board | 1 | Cum. | 3,990 | ₹3,990 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.76 MB
Tendernotice_2.pdf
PDF • 3.28 MB
BOQ_2205631.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .