Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹653.5 CrAdmitted-Finance 27 RAMANUJAM NAGAR NEYVELI VILLAGE TOWN NEYVELI CITY NEYVELI CUDDALORE TAMIL NADU 607802 INDIA | CUDDALORE | TAMIL NADU | 607802 | L1 | Admitted-Finance | |
| 2 | L2₹583 Cr−₹70.5 Cr (10.8%)Admitted-Finance 12 LANDT HOUSE SHIVAJI NAGAR NORTH AMBAZARI ROAD NAGPUR MAHARASHTRA 440010 | NAGPUR | NAGPUR | MAHARASHTRA | 440010 | L2 | Admitted-Finance | |
| 3 | L3₹551.0 Cr−₹102.5 Cr (15.7%)Admitted-Finance 1 PARSWADA POST SHAHAGANJ VILLAGE | INDORE | INDORE | MADHYA PRADESH | L3 | Admitted-Finance | |
| 4 | L4₹698 Cr+₹44.5 Cr (6.81%)Admitted-Finance BLOCK M PHASE 15TH FLOOR NEW ALIPUR MARKET COMPLEX KOLKATA WEST BENGAL INDIA 700053 | KOLKATA | WEST BENGAL | 700053 | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Ionexchange India Ltd L4 | LARSEN AND TOUBRO LIMITED L2 | VA TECH WABAG LIMITED L3 | Gaja Engineering Pvt Ltd L1 |
|---|---|---|---|---|---|---|---|
| 1.00The scope of work shall include Project Management; Residual Process Design & Detailed Engineering; Procurement; Fabrication; Inspection; Supply; Manufacture; Transportation of all equipment/materials to the work site & Storage at site; assembly, erection & installation; Construction and Erection of Civil & Structural, Mechanical, Electrical, Instrumentation & Piping works; Acid /Alkali proof tiling; Painting; Testing; Pre-commissioning, trial run for 30 days before commissioning; commissioning; Training of BPCL’s personnel; performance guarantee test run for 72 hours continuous operation in presence of BPCL’s & EIL’s Representatives; guaranteeing and handing over of Water Block Package consisting of Raw Water Treatment Plant (RWTP), Reverse Osmosis Based Demineralization Plant (RODMP) & Zero Liquid Discharge Plant (ZLDP) to the Client on lump sum turnkey basis as per design basis, equipment list, standards, PFD. P&IDs, data sheets, drawings, etc., all complete within Water Block package contractor's specified battery limit including supply of spares, chemicals & consumables. The Water block package contractor shall be required to obtain all statuary approvals for completion of his scope of work. | |||||||
| 1.01 | Lumpsum Price [SP-0] | 1 | Lumpsum | 6,98,00,00,000 ₹6,98,00,00,000 | 5,83,00,00,000 ₹5,83,00,00,000 | 5,51,00,90,000 ₹5,51,00,90,000 Lowest | 6,53,48,80,337 ₹6,53,48,80,337 |
Tender Value
Refer Docs
EMD Value
₹10 Cr
Closing Date
18 Jul 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GM JAYDIP PURKAYASHTA
EIL GURUGRAM
WATER BLOCK PACKAGE CONSISTING OF RWTP, RODMP AND ZLDP OF BINA PETCHEM AND REFINERY EXPANSION PROJECT(BPREP)
2025_EIL_858453_1
JP/B957-999-PD-T-8701/1014
Open Tender
Miscellaneous Works
Works
660 days
AS PER TENDER DOCUMENT
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹10 Cr
AS PER TENDER DOCUMENT
14 Oct 2025
2 May 2025
21 Jul 2025
2 May 2025
18 Jul 2025
11 Jun 2025
2 May 2025 - 15 May 2025
13 May 2025
Amount
The scope of work shall include Project Management; Residual Process Design & Detailed Engineering; Procurement; Fabrication; Inspection; Supply; Manufacture; Transportation of all equipment/materials to the work site & Storage at site; assembly, erection & installation; Construction and Erection of Civil & Structural, Mechanical, Electrical, Instrumentation & Piping works; Acid /Alkali proof tiling; Painting; Testing; Pre-commissioning, trial run for 30 days before commissioning; commissioning; Training of BPCL’s personnel; performance guarantee test run for 72 hours continuous operation in presence of BPCL’s & EIL’s Representatives; guaranteeing and handing over of Water Block Package consisting of Raw Water Treatment Plant (RWTP), Reverse Osmosis Based Demineralization Plant (RODMP) & Zero Liquid Discharge Plant (ZLDP) to the Client on lump sum turnkey basis as per design basis, equipment list, standards, PFD. P&IDs, data sheets, drawings, etc., all complete within Water Block package contractor's specified battery limit including supply of spares, chemicals & consumables. The Water block package contractor shall be required to obtain all statuary approvals for completion of his scope of work.
Lumpsum Price [SP-0]
Description of Work / Item(s)
Amount
Design and Detailed Engineering of the complete Water Block Package Comprising of Raw Water Treatment Plant (RWTP), Reverse Osmosis Based Demineralization Plant (RODMP) & Zero Liquid Discharge Plant (ZLDP) as per DESCRIPTION PROVIDED IN DETAILED SCHEDULE OF PRICES (Form SP-4) & as per Bidding Document.
Description of Work / Item(s)
Amount
Procurement, supply, transportation, Shop fabrication, assembly, testing of all items/ Equipment’s / Components / Materials / bought outs, Procurement of raw materials and sub-ordered equipment, bought outs, shop fabrication/assembly, inspection, testing, supply of all spares, consumables, lubricants, chemicals as required, special tools and tackles required for work as per DESCRIPTION PROVIDED IN DETAILED SCHEDULE OF PRICES (Form SP-5) & Bidding Document for the complete Water Block Package Comprising of Raw Water Treatment Plant (RWTP), Reverse Osmosis Based Demineralization Plant (RODMP) & Zero Liquid Discharge Plant (ZLDP).
Description of Work / Item(s)
Amount
Construction & Installation of the complete Water Block Package consisting of Raw Water Treatment Plant (RWTP), Reverse Osmosis Based Demineralization Plant (RODMP) & Zero Liquid Discharge Plant (ZLDP) Tender as per DESCRIPTION PROVIDED IN DETAILED SCHEDULE OF PRICES (Form SP-6) & as per Bidding Document.
Start Up, Pre-commissioning, trial run and commissioning of the complete Water Block Package Comprising of Raw Water Treatment Plant (RWTP), Reverse Osmosis Based Demineralization Plant (RODMP) & Zero Liquid Discharge Plant (ZLDP) Tender as per DESCRIPTION PROVIDED IN DETAILED SCHEDULE OF PRICES (Form SP-6) & as per Bidding Document.
Training of BPCL’s personnel; performance guarantee test run for 72 hours continuous operation of the complete Water Block Package Comprising of Raw Water Treatment Plant (RWTP), Reverse Osmosis Based Demineralization Plant (RODMP) & Zero Liquid Discharge Plant (ZLDP) Tender as per DESCRIPTION PROVIDED IN DETAILED SCHEDULE OF PRICES (Form SP-6) & as per Bidding Document.
Description of Work / Item(s)
Amount
Guaranteed Power for identified pumps in the complete Water Block Package Comprising of Raw Water Treatment Plant (RWTP), Reverse Osmosis Based Demineralization Plant (RODMP) & Zero Liquid Discharge Plant (ZLDP) package as per bidding document and subsequent amendment, if any
HRSCC-I FEED PUMP (422-PA-CF-201 A/B/C)
FILTER FEED PUMP-I (422-PA-CF-202 A/B/C/D/E/F)
UF-I FEED PUMP (422-PA-CF-204 A/B/C/D/E/F)
RO-I CARTRIDGE FILTER FEED PUMP (422-PA-CF-207 A/B/C/D/E/F)
RO-I FEED PUMPs (422-PA-CF-208 A/B/C/D/E/F/G) (NOTE-V)
RO-II FEED PUMPs (422-PA-CF-209 A/B/C/D) (NOTE-V)
RO-III FEED PUMPs (422-PA-CF-210 A/B/C/D) (NOTE-V)
RO-IV FEED PUMPs (422-PA-CF-218 A/B/C) (NOTE-V)
COOLING/SURPLUS WATER TRANSFER PUMPS TO ZLD (401-PA-CF-106 A/B/C)
Description of Work / Item(s)
Amount
FIRST YEAR Operation & Maintenance Charges (during Defect Liability Period) for Raw Water Treatment Plant (RWTP)
SECOND YEAR Operation & Maintenance Charges for Raw Water Treatment Plant (RWTP)
THIRD YEAR Operation & Maintenance Charges for Raw Water Treatment Plant (RWTP)
FIRST YEAR Operation & Maintenance Charges (during Defect Liability Period) for Reverse Osmosis Based Demineralization Plant (RODMP)
SECOND YEAR Operation & Maintenance Charges for Reverse Osmosis Based Demineralization Plant (RODMP)
THIRD YEAR Operation & Maintenance Charges for Reverse Osmosis Based Demineralization Plant (RODMP)
FIRST YEAR Operation & Maintenance Charges (during Defect Liability Period) for Zero Liquid Discharge Plant (ZLDP)
SECOND YEAR Operation & Maintenance Charges for Zero Liquid Discharge Plant (ZLDP)
THIRD YEAR Operation & Maintenance Charges for Zero Liquid Discharge Plant (ZLDP)
Description of Work / Item(s)
Amount
Comprehensive post warrantee Annual charges for maintenance of Battery Charger comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for FIRST YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of Battery Charger comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for SECOND YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of Battery Charger comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for THIRD YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of Battery Charger comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for FOURTH YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of Battery Charger comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for FIFTH YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of UPS comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for FIRST YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of UPS comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for SECOND YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of UPS comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for THIRD YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of UPS comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for FOURH YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of UPS comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for FIFTH YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of Substation Automation System (SAS) comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for FIRST YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of Substation Automation System (SAS) comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for SECOND YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of Substation Automation System (SAS) comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for THIRD YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of Substation Automation System (SAS) comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for FOURTH YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of Substation Automation System (SAS) comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for FIFTH YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of VFDs/Soft Starters comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for FIRST YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of VFDs/Soft Starters comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for SECOND YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of VFDs/Soft Starters comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for THIRD YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of VFDs/Soft Starters comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems s for FOURTH YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of VFDs/Soft Starters comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for FIVE YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of Thyristor control panel (TCP) comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for FIRST YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of Thyristor control panel (TCP) comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for SECOND YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of Thyristor control panel (TCP) comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for THIRD YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of Thyristor control panel (TCP) comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for FOURTH YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of Thyristor control panel (TCP) comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for FIFTH YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of Nitrogen injection fire protection system (NIFPS) comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for FIRST YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of Nitrogen injection fire protection system (NIFPS) comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systemsfor SECOND YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of Nitrogen injection fire protection system (NIFPS) comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for THIRD YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of Nitrogen injection fire protection system (NIFPS) comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for FOURTH YEAR after expiry of defect liability
Comprehensive post warrantee Annual charges for maintenance of Nitrogen injection fire protection system (NIFPS) comprising of deployment of minimum one Supervisor including supply of all spare parts etc. complete and deployment of extra personnel required for repair or replacement of the above systems for FIFTH YEAR after expiry of defect liability
Non-Comprehensive Post Commissioning AMC of Instrumentation Package PLC as per Instrumentation Scope of work/Job Specification for FIRST YEAR after expiry of defect liability
Non-Comprehensive Post Commissioning AMC of Instrumentation Package PLC as per Instrumentation Scope of work/Job Specificatio for SECOND YEAR after expiry of defect liability
Non-Comprehensive Post Commissioning AMC of Instrumentation Package PLC as per Instrumentation Scope of work/Job Specificatio for THIRD YEAR after expiry of defect liability
LARSEN AND TOUBRO LIMITED (BID ID -3249954)
Gaja Engineering Pvt Ltd (BID ID -3238833)
Ionexchange India Ltd (BID ID -3242692)
LARSEN AND TOUBRO LIMITED (BID ID -3249954)
Gaja Engineering Pvt Ltd (BID ID -3238833)
Ionexchange India Ltd (BID ID -3242692)
LARSEN AND TOUBRO LIMITED (BID ID -3249954)
Gaja Engineering Pvt Ltd (BID ID -3238833)
Ionexchange India Ltd (BID ID -3242692)
LARSEN AND TOUBRO LIMITED (BID ID -3249954)
Gaja Engineering Pvt Ltd (BID ID -3238833)
Ionexchange India Ltd (BID ID -3242692)
LARSEN AND TOUBRO LIMITED (BID ID -3249954)
VA TECH WABAG LIMITED (BID ID -3249156)
Ionexchange India Ltd (BID ID -3242692)
VA TECH WABAG LIMITED (BID ID -3249156)
Gaja Engineering Pvt Ltd (BID ID -3238833)
Ionexchange India Ltd (BID ID -3242692)
LARSEN AND TOUBRO LIMITED (BID ID -3249954)
VA TECH WABAG LIMITED (BID ID -3249156)
Ionexchange India Ltd (BID ID -3242692)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
169561694.pdf
Tender Document • 0.37 MB
169561696.html
Tender Document • 0.11 MB
172880505.pdf
Tender Document • 1.24 MB
174166599.pdf
Tender Document • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .