Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹4.3 L+₹20,279.25 (4.93%)Rejected-Finance | L2 | Rejected-Finance Rejected as per TCR | |
| 3 | L3₹4.4 L+₹25,174.24 (6.12%)Rejected-Finance VILL RANIGANJ CHATI POST RAGHUNATH CHAK DIST PASCHIM BARDHAMAN STATE WEST BENGAL PIN 713359 | RANIGANJ | PASCHIM BARDHAMAN | WEST BENGAL | 713359 | L3 | Rejected-Finance Rejected as per TCR | |
| 4 | L4₹4.8 L+₹70,487.87 (17.1%)Rejected-Finance | L4 | Rejected-Finance Rejected as per TCR | |
| 5 | L5₹4.9 L+₹76,571.64 (18.6%)Rejected-Finance | L5 | Rejected-Finance Rejected as per TCR |
Tender Value
₹7.0 L
EMD Value
₹8,800
Closing Date
16 Aug 2022, 5:00 pmClosed
AREA ENGINEER CIVIL
Office of the General Manager, Salanpur Area, Lalganj. 713359
Construction of Electric Substation at Pahargora side near AIAEPL Camp of Mohanpur OCP under Salanpur Area.
2022_ECL_252368_1
SLN/GM/AE(C)/E-Tender/22-23/24 DATED 02/08/2022
Open Tender
Civil Works - Buildings
Percentage
45 days
MOHANPUR OCP
Please refer Tender documents
3 documents required · 3 mandatory
₹8,800
19 Dec 2022
5 Aug 2022
17 Aug 2022
6 Aug 2022
16 Aug 2022
6 Aug 2022
6 Aug 2022 - 10 Aug 2022
eProcurement System of Coal India Limited Created By: OMPRAKASH MEENA Created Date/Time: 17-Aug-2022 01:23 PM Tender Title: Construction of Electric Substation at Pahargora side near AIAEPL Camp of Mohanpur OCP under Salanpur Area. Tender ID: 2022_ECL_252368_1
Tender Inviting Authority: General Manager,Salanpur Area
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 DURGA PADA MONDAL(GSTN-19AWSPM1208Q1ZS) 699284.38 -30.25 487750.85 Four Lakh Eighty Seven Thousand Seven Hundred and Fifty
2.00 ROY ENGINEERING(GSTN-19AFOPR7541C1Z3) 699284.38 -41.20 411179.21 Four Lakh Eleven Thousand One Hundred and Seventy Nine
3.00 M/S. BANDHU ENTERPRISE(GSTN-NA) 699284.38 -37.60 436353.45 Four Lakh Thirty Six Thousand Three Hundred and Fifty Three
4.00 M/S Kajal Roy(GSTN-NA) 699284.38 -31.12 481667.08 Four Lakh Eighty One Thousand Six Hundred and Sixty Seven
5.00 TARAK SHANKAR MISHRA(GSTN-NA) 699284.38 -38.30 431458.46 Four Lakh Thirty One Thousand Four Hundred and Fifty Eight
Lowest Amount Quoted BY: ROY ENGINEERING(411179.21)
BOQ Summary Details Tender Title: Construction of Electric Substation at Pahargora side near AIAEPL Camp of Mohanpur OCP under Salanpur Area. Tender ID: 2022_ECL_252368_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 ROY ENGINEERING 411179.21 L1
2 TARAK SHANKAR MISHRA 431458.46 L2
3 M/S. BANDHU ENTERPRISE 436353.45 L3
4 M/S Kajal Roy 481667.08 L4
5 DURGA PADA MONDAL 487750.85 L5
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .