Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹8.0 L+₹13,457.81 (1.71%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.9 L
EMD Value
₹8,000
Closing Date
19 Nov 2026, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
PWD Buildings C and M Division Ramanathapuram
Special Repairs to Health Sub Centre at Sundaramudaiyan in Ramanathapuram District
2026_PWD_722469_1
08 BUILDINGDS C M DIVISION RAMANATHAPURAM 29 10 2026 19
Open Tender
Civil Works - Buildings
Lump-sum
Sundaramudaiyan
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹8,000
19 Nov 2026
5 Nov 2026
19 Nov 2026
5 Nov 2026
19 Nov 2026
5 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth.
Data worked out for 48 m3 per day/8 hrs. | 5.94 | M3 | 366.82 | ₹2,178.91 |
| 2Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls | |||||
| 2.01 | Clean removal of cement plaster from walls | 155.46 | M2 | 9.06 | ₹1,408.47 |
| 2.02 | Pressed Tiles & Weathering Course | 61.24 | M2 | 49.2 | ₹3,013.01 |
| 2.03 | Floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs | 46.11 | M2 | 65.56 | ₹3,022.97 |
| 3 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 1.17 | M3 | 6,402.85 | ₹7,491.33 |
| 4Brick work in following Cement Mortar 1:5 using best quality Burnt Clay Brick of size 8 3/4" x 4 1/4" x 2 3/4" with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 4.01 | Foundation and Basement | 5.93 | M3 | 6,724.95 | ₹39,878.95 |
| 5 | Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick with Bonding agent cebex 112, Zydex-Zycrete 2X or other Equalent compound conforming to BIS at 200ml of one cement bag(50kg) for incresed workability and air entrainment used finishing in all floors including curing etc.,complete complying with standard specification and as directed by the departmental officers. | 196.1 | M2 | 301.65 | ₹59,153.56 |
| 6 | Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers. | 5.27 | M3 | 4,401.94 | ₹23,198.22 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
TenderConditionHSCSundaramudaiyan.pdf
Tender Documents • 0.79 MB
BOQ_867505.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .