| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.7 LAccepted-Finance NO 46 PERUMAL KOIL STREET MISSION STREET CUTTING PUDUCHERRY 605 001 | PONDICHERRY | PUDUCHERRY | 605001 | L1 | Accepted-Finance In Order |
| Sl No | Description | Qty | Unit | KARTHIK ENTERPRISES |
|---|---|---|---|---|
| 1.00Shifting of damaged 6 pole structure | ||||
| 1.01 | Supply of Double pole structure materials without Bed Channel, Structure clamp, Stay set, Poles, 400/200A Single contact AB Switch, Double Pole Bracing set etc., and Labour charges for the following erection works :- (Section Switch) (a). Erection of 30 feet RCC poles including excavation of pit, refilling and concreting for a size of 0.45 x 0. 45 x 0.75 mts and coping 0.45 x 0. 45 x 0.45 in 1:3:6 ratio using cement, 20 mm HBG blue metal and sand with all materials. (b). Erection of DP structure without Bed channel including V cross arm, F clamp and pin insulator. (c). Erection of 200/400 A Single contact AB Switch, and Double Pole Bracing. (d). Earthing of DP Structure and AB Switch and all metal parts with 50 mm dia of B Class GI pipe of 3 Mts length and connected with all metal parts with No 8 GI wire. (e). Erection of required No of HT Stay set as per site condition. (f). Painting for RCC pole with cement paint and metal parts with Aluminum paint. (g).Fixing of Danger board and Name board.(All works to be carried out as per the direction of the Engineer-in-charge). | 1 | Set | 1,50,000 ₹1,77,000 Lowest |
| 1.02 | Supply of 11KV 3 Core 95 Sq.mm XLPE HT UG Cable as per department specification | 55 | Mts | 49,500 ₹58,410 Lowest |
| 1.03 | Labour charges for laying of one number 11 KV 3 Core 95 Sq.mm XLPE HT UG Cable for a trench size of 0.5 m width and 1.2 m depth direct in ground including excavation, sand cushioning, protective covering by (RCC trough) and refilling the trench etc. as required as directed by the Engineer-in-charge. | 25 | Mts | 22,500 ₹26,550 Lowest |
| 1.04 | labour charges for laying of one no. of 11KV 3 Core 95 Sq.mm XPPE HT UG Cable in open space/underground (end loose and terminations) with 100 mm GI of required quantity | 30 | Mts | 18,000 ₹21,240 Lowest |
| 1.05 | Supply and providing Heat shrinkable out door end termination kit suitable for 11KV 3 core XLPE insulated 95 Sq-mm cable | 2 | Nos | 13,000 ₹15,340 Lowest |
| 1.06 | Supply of Double pole structure materials with Bed Channel, Structure clamp, Bed channel, Stay set, Poles,11KV Metering Cubicle, 400/200A Single contact AB Switch, 11 KV HG fuse and 11 KV Lightning arrestor etc and Labour charges for the following erection works :- (11KV Metering Cubicle Structure). i). Erection of 30 feet RCC poles including excavation of pit, refilling and concreting for a size of 0.45 x 0. 45 x 0.75 mts and coping 0.45 x 0. 45 x 0.45 in 1:3:6 ratio using cement, 20 mm HBG blue metal and sand with all materials. (ii).Erection of DP structure without Bed channel including V cross arm, F clamp and pin insulator. (iii). Erection of 200/400 A Single contact AB Switch, 11 KV HG fuse, 11 KV Lightning arrestor. (iv). Earthing of DP Structure and AB Switch Lightning arrestor and all metal parts with 50 mm dia of B Class GI pipe of 3 Mts length and connected with all metal parts with No 8 GI wire, and Earthing of Transformer Neutral with 50 mm dia of B Class GI pipe of 3Mts. length and connected with neutral with No 2 copper wire. (v). Erection of require No of HT Stay set as per site condition. (vi). Erection of 11 KV HG fuse and 11 KV Lightning arrestor. (vii). Wiring the complete structure with No 2 copper. (viii). Erection of 11KV Metering Cubicle. (ix). Wiring of Metering Cubicle with complete set. (x). Painting for RCC pole with cement paint and metal parts with Aluminum paint. (xi). Fixing of Danger board and Name board.(All works to be carried out as per the direction of the Engineer-in-charge). | 1 | Set | 1,60,000 ₹1,88,800 Lowest |
| 1.07 | Supply of Double pole structure materials without Bed Channel, Structure clamp, Stay set, Poles, 400/200A Single contact AB Switch, 11 KV HG fuse and 11 KV Lightning arrestor etc and Labour charges for the following erection works :- (Transformer Structure). (i). Erection of 30 feet RCC poles including excavation of pit, refilling and concreting for a size of 0.45 x 0. 45 x 0.75 mts and coping 0.45 x 0. 45 x 0.45 in 1:3:6 ratio using cement, 20 mm HBG blue metal and sand with all materials. (ii).Erection of DP structure without Bed channel including V cross arm, F clamp and pin insulator. (iii). Erection of 200/400 A Single contact AB Switch, 11 KV HG fuse, 11 KV Lightning arrestor and Jumpering. (iv). Earthing of DP Structure and AB Switch Lightning arrestor and all metal parts with 50 mm dia of B Class GI pipe of 3 Mts length and connected with all metal parts with No 8 GI wire, and Earthing of Transformer Neutral with 50 mm dia of B Class GI pipe of 3 Mts. length and connected with neutral with No 2 copper wire. (v). Erection of require No of HT Stay set as per site condition. (vi). Wiring the complete structure with No 2 copper. (vii). Shifting and erection of Existing Distribution Transformer. (ix). Painting for RCC pole with cement paint and metal parts with Aluminum paint. (x). Fixing of Danger board and Name board.(All works to be carried out as per the direction of the Engineer-in-charge). | 2 | Set | 3,20,000 ₹3,77,600 Lowest |
| 1.08 | Construction of Plinth for erection of Transformer (2) and for erection of HT Trivector meter (1) of required size with country brick or cement block or AAC block and painting with cement paint as directed by the Engineer-in -charge | 3 | Nos | 45,000 ₹53,100 Lowest |
| 1.09 | Shifting of Transformer from the existing structure to the proposed structure | 2 | Nos | 15,000 ₹17,700 Lowest |
Tender Value
₹16.4 L
EMD Value
₹40,900
Closing Date
17 Sept 2025, 11:00 amClosed
The Superintending Engineer-MP and ORs,
Electricity Department, No.137, Subash Chandra Bose Salai, Puducherry - 605 001
Shifting of damaged 6 pole structure at Government Hospital Karaikal in Town O and M Jurisdiction in Karaikal
2025_EDCC_19140_1
e.No.01/ED/EE-KKL/2025-2026
Open Tender
Electrical Works
Works
60 days
Govt. Hospital
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
Junior Accounts Officer/PED
₹40,900
Yes
11 Nov 2025
15 Jul 2025
17 Sept 2025
15 Jul 2025
17 Sept 2025
15 Jul 2025
15 Jul 2025 - 17 Sept 2025
Shifting of damaged 6 pole structure
Supply of Double pole structure materials without Bed Channel, Structure clamp, Stay set, Poles, 400/200A Single contact AB Switch, Double Pole Bracing set etc., and Labour charges for the following erection works :- (Section Switch) (a). Erection of 30 feet RCC poles including excavation of pit, refilling and concreting for a size of 0.45 x 0. 45 x 0.75 mts and coping 0.45 x 0. 45 x 0.45 in 1:3:6 ratio using cement, 20 mm HBG blue metal and sand with all materials. (b). Erection of DP structure without Bed channel including V cross arm, F clamp and pin insulator. (c). Erection of 200/400 A Single contact AB Switch, and Double Pole Bracing. (d). Earthing of DP Structure and AB Switch and all metal parts with 50 mm dia of B Class GI pipe of 3 Mts length and connected with all metal parts with No 8 GI wire. (e). Erection of required No of HT Stay set as per site condition. (f). Painting for RCC pole with cement paint and metal parts with Aluminum paint. (g).Fixing of Danger board and Name board.(All works to be carried out as per the direction of the Engineer-in-charge).
Supply of 11KV 3 Core 95 Sq.mm XLPE HT UG Cable as per department specification
Labour charges for laying of one number 11 KV 3 Core 95 Sq.mm XLPE HT UG Cable for a trench size of 0.5 m width and 1.2 m depth direct in ground including excavation, sand cushioning, protective covering by (RCC trough) and refilling the trench etc. as required as directed by the Engineer-in-charge.
labour charges for laying of one no. of 11KV 3 Core 95 Sq.mm XPPE HT UG Cable in open space/underground (end loose and terminations) with 100 mm GI of required quantity
Supply and providing Heat shrinkable out door end termination kit suitable for 11KV 3 core XLPE insulated 95 Sq-mm cable
Supply of Double pole structure materials with Bed Channel, Structure clamp, Bed channel, Stay set, Poles,11KV Metering Cubicle, 400/200A Single contact AB Switch, 11 KV HG fuse and 11 KV Lightning arrestor etc and Labour charges for the following erection works :- (11KV Metering Cubicle Structure). i). Erection of 30 feet RCC poles including excavation of pit, refilling and concreting for a size of 0.45 x 0. 45 x 0.75 mts and coping 0.45 x 0. 45 x 0.45 in 1:3:6 ratio using cement, 20 mm HBG blue metal and sand with all materials. (ii).Erection of DP structure without Bed channel including V cross arm, F clamp and pin insulator. (iii). Erection of 200/400 A Single contact AB Switch, 11 KV HG fuse, 11 KV Lightning arrestor. (iv). Earthing of DP Structure and AB Switch Lightning arrestor and all metal parts with 50 mm dia of B Class GI pipe of 3 Mts length and connected with all metal parts with No 8 GI wire, and Earthing of Transformer Neutral with 50 mm dia of B Class GI pipe of 3Mts. length and connected with neutral with No 2 copper wire. (v). Erection of require No of HT Stay set as per site condition. (vi). Erection of 11 KV HG fuse and 11 KV Lightning arrestor. (vii). Wiring the complete structure with No 2 copper. (viii). Erection of 11KV Metering Cubicle. (ix). Wiring of Metering Cubicle with complete set. (x). Painting for RCC pole with cement paint and metal parts with Aluminum paint. (xi). Fixing of Danger board and Name board.(All works to be carried out as per the direction of the Engineer-in-charge).
Supply of Double pole structure materials without Bed Channel, Structure clamp, Stay set, Poles, 400/200A Single contact AB Switch, 11 KV HG fuse and 11 KV Lightning arrestor etc and Labour charges for the following erection works :- (Transformer Structure). (i). Erection of 30 feet RCC poles including excavation of pit, refilling and concreting for a size of 0.45 x 0. 45 x 0.75 mts and coping 0.45 x 0. 45 x 0.45 in 1:3:6 ratio using cement, 20 mm HBG blue metal and sand with all materials. (ii).Erection of DP structure without Bed channel including V cross arm, F clamp and pin insulator. (iii). Erection of 200/400 A Single contact AB Switch, 11 KV HG fuse, 11 KV Lightning arrestor and Jumpering. (iv). Earthing of DP Structure and AB Switch Lightning arrestor and all metal parts with 50 mm dia of B Class GI pipe of 3 Mts length and connected with all metal parts with No 8 GI wire, and Earthing of Transformer Neutral with 50 mm dia of B Class GI pipe of 3 Mts. length and connected with neutral with No 2 copper wire. (v). Erection of require No of HT Stay set as per site condition. (vi). Wiring the complete structure with No 2 copper. (vii). Shifting and erection of Existing Distribution Transformer. (ix). Painting for RCC pole with cement paint and metal parts with Aluminum paint. (x). Fixing of Danger board and Name board.(All works to be carried out as per the direction of the Engineer-in-charge).
Construction of Plinth for erection of Transformer (2) and for erection of HT Trivector meter (1) of required size with country brick or cement block or AAC block and painting with cement paint as directed by the Engineer-in -charge
Shifting of Transformer from the existing structure to the proposed structure
Supply and erection of 8 Way 800 Amps SS Pillar box as per department specification and foundation for SS Pillar and erection with Masonry structure or Metal structure as per the site condition as directed by the Engineer-in-charge.
Labour charges for earthing of SS Pillar box with required size of GI Wire and GI pipe as directed by the Engineer-in-charge.
Supply of 3 ½ X 300 Sq.mm XLPE LT UG Cable as per department specification and Labour charges for laying in the existing trench and end termination with gland and lugs
Supply and erection of ACSR 7/2.59 Conductor in between the structure with required 11 KV disc insulator ,11 KV pin insulator, V cross arm and TI fitting etc as directed by the Engineer-in-charge.
Dismantling of DP structure materials(4Sets) single contact AB Switch(4Sets) , Tubular poles(8Nos) , Metering cubicle(1No), and related materials and handing over to sub-store or section office
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_19507.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .