| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.2 LAccepted-AOC | ₹13.2 L Quoted ₹13.0 L | L1 | Accepted-AOC L1 submitted the lowest bid. hence the contract was awarded to L1 |
| 2 | L2₹13.1 LRejected-Finance | ₹13.1 L | L2 | Rejected-Finance L2 Have a High Value Quoted hence Rejected |
| Sl No | Description | Qty | Unit | Selva Construction L2 | SARAVANAN N L1 |
|---|---|---|---|---|---|
| 1.00Strengthening of Pothigai nagar at Sakkottai Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A | 9.63 | Cum | 142 ₹1,367.46 | 140 ₹1,348.20 |
| 3.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 32.1 | Cum | 3,232 ₹1.0 L | 3,225 ₹1.0 L |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 40.13 | Cum | 3,342 ₹1.3 L | 3,338 ₹1.3 L |
| 5.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 321 | Cum | 22 ₹7,062 | 20.3 ₹6,516.30 |
| 6.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 321 | Cum | 89 ₹28,569 | 86.7 ₹27,830.70 |
| 7.00 | Providing and laying premix carpet with sealcoat type 'A' for 20mm compacted using machine crushed IRC size HBG metal 0.18 cum of 13.2 mm size metal , 0.09 cum of 11.2 mm size metal with 14.6 kg of bitumen for premix carpet per 10 sqm & using 0.09 cum of 6.7 mm size metal with 9.8 kg of bitumen for seal coat type A per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller, hot mix plant and all other tools and plants employed etc complete | 321 | Sqm | 345 ₹1.1 L | 342.5 ₹1.1 L |
| 9.00 | Provision for Name board & photo graphic charges | 1 | Nos | 5,500 ₹5,500 | 5,000 ₹5,000 |
| 10.00R.C.C Culvert 3.00m Span | |||||
| 11.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B etc | 49.27 | Cu.m | 265 ₹13,056.55 | 263.5 ₹12,982.65 |
Tender Value
₹13.2 L
EMD Value
₹13,160
Closing Date
27 Feb 2026, 3:00 pmClosed
Block Development Officer (VP) Kumbakonam
Panchayat Union Office, Kumbakonam
Thanjavur District Kumbakonam- Strengthening of Pothigai nagar at Sakkottai Panchayat Under Peri Urban Panchayat 2022-23 to 2025-2026 Kumbakonam Block.
2026_RDTN_663024_1
Rc.No.562/2026/B1 dated 18.02.2026
Open Tender
Civil Works
Panchayat Union Office, Kumbakonam
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹13,160
15 May 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
Strengthening of Pothigai nagar at Sakkottai Panchayat
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying premix carpet with sealcoat type 'A' for 20mm compacted using machine crushed IRC size HBG metal 0.18 cum of 13.2 mm size metal , 0.09 cum of 11.2 mm size metal with 14.6 kg of bitumen for premix carpet per 10 sqm & using 0.09 cum of 6.7 mm size metal with 9.8 kg of bitumen for seal coat type A per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller, hot mix plant and all other tools and plants employed etc complete
Provision for Name board & photo graphic charges
R.C.C Culvert 3.00m Span
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B etc
Supply of sand and filling in to the foundation including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Levelling course
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Foundation
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Superstructure
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for Deckslab
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and superstructure for Abutment /pier using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers etc.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
Providing and fixing Tar Paper for Bearing Between Bed block & Deck slab
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm. Dia. Semi spherical back fill arrangements with 100 mm. size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the BackFill IN BETWEEN THE ABUTMENTS AND RETURNS.
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
pricebiz.pdf
Tender Documents • 0.57 MB
BOQ_795958.xls
BOQ • 0.33 MB
Tecnibit.pdf
Tender Documents • 0.65 MB
Download all tender documents and submit your bid