Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.3 CrAccepted-AOC 259 JAY RAM NAGAR KHAMBHAPUR ROAD FATEHPUR FATEHPUR UTTAR PRADESH 212601 | FATEHPUR | UTTAR PRADESH | 212601 | L1 | Accepted-AOC L1 | |
| 2 | L2₹24.2 Cr+₹5.9 Cr (32.0%)Rejected-Finance YOGESHWARI NAGARI RING ROAD AMBAJOGAI | AMBAJOGAI | BEED | MAHARASHTRA | L2 | Rejected-Finance REJECT | |
| 3 | L3₹24.8 Cr+₹6.4 Cr (35.2%)Rejected-Finance PLOT NO 1 2 AASHIYANA CO OP SOCIETY N 11 CIDCO AURANGABAD | AURANGABAD | AURANGABAD | MAHARASHTRA | L3 | Rejected-Finance REJECT | |
| 4 | Rejected-Technical 308 302 1ST FLOOR LABH CHAMBERS STATION ROAD CHHATRAPATI SAMBHAJINAGAR | CHHATRAPATI SAMBHAJINAGAR | CHHATRAPATI SAMBHAJINAGAR | MAHARASHTRA | - | Rejected-Technical Reject | |
| 5 | Rejected-Technical A M HEIGHTS BUILDING AZAD CHOWK ROAD NEAR CENTRAL NAKA N 6 CIDCO CHHATRAPATI SAMBHAJINAGAR 431001 | CHHATRAPATI SAMBHAJINAGAR | CHHATRAPATI SAMBHAJINAGAR | MAHARASHTRA | 431001 | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | Wonder Construction L3 | Laxmi Construction Co. L1 | Vinayak Construction Ambajogai L2 |
|---|---|---|---|---|---|---|
| 1.00PART A WORK PORTION | ||||||
| 2.00 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material with all lifts and leads beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 7,636.91 | Cum | 225 ₹17,18,304.75 | 165 ₹12,60,090.15 Lowest | 218 ₹16,64,846.38 |
| 3.00 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material with all lifts and leads beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means | 3,857.28 | Cum | 280 ₹10,80,038.4 | 206 ₹7,94,599.68 Lowest | 272 ₹10,49,180.16 |
| 4.00 | Excavation for foundation in Hard murum including removing the excavated material with all lifts and leads beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 to 3.0m.) By Mechanical Means | 1,867.9 | Cum | 370 ₹6,91,123 | 272 ₹5,08,068.8 Lowest | 360 ₹6,72,444 |
| 5.00 | Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layers of 15 cm to 20 cm including watering and compaction etc. complete. | 8,912.73 | Cum | 875 ₹77,98,638.75 | 641 ₹57,13,059.93 Lowest | 846 ₹75,40,169.58 |
| 6.00 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper. | 17,903.78 | Sqm | 115 ₹20,58,934.7 | 86 ₹15,39,725.08 Lowest | 113 ₹20,23,127.14 |
| 7.00 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) treatment by treating the backfill in immediate contact with foundation at the rate of 5 litres of emulsion concentrate of 1.0 percent of clorophyrifos per One Square Metre of vertical surface area covering 10 years guarantee on bond paper. | 5,773.74 | Sqm | 120 ₹6,92,848.8 | 90 ₹5,19,636.6 Lowest | 118 ₹6,81,301.32 |
| 8.00 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the top surface of plinth filling at the rate of 5 litres of emulsion concentrate at 1.0 percent of clorophyrifos per One Square Metre of surface area covering ten years guarantee on bond paper. | 2,980.52 | Sqm | 120 ₹3,57,662.4 | 86 ₹2,56,324.72 Lowest | 114 ₹3,39,779.28 |
| 9.00 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-I) to the soil along the external face of building by punching holes of 1.2 of 1.5 C.M. diametre about 30 -60 cm deep at 15 cm c/c as close to the wall as possible and to inject 0.5 percent of aldrin or clorophyrifos at the rate of 7.5 litres per hole and sealing the same with proper filling and covering 10 years guarantee on bond paper. | 1,769.85 | Sqm | 190 ₹3,36,271.5 | 141 ₹2,49,548.85 Lowest | 186 ₹3,29,192.1 |
| 10.00 | Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/grit, ramming, watering etc. complete. | 1,509.54 | Cum | 2,045 ₹30,87,009.3 | 1,500 ₹22,64,310 Lowest | 1,980 ₹29,88,889.2 |
Tender Value
₹23.3 Cr
EMD Value
₹11.6 L
Closing Date
5 Mar 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Exe. Engg., PW Division No.2, Jalna
PWD Premises Jalna
CONSTRUCTION OF 50 BEDDED SUB-DISTRICT HOSPITAL BUILDING AT MAHAKAL ANKUSH NAGAR TAL.AMBAD DIST.JALNA
2024_PWR_1010157_1
Tender Notice No. 18 of 2023-24
Open Tender
Civil Works - Buildings
Item Rate
730 days
Jalna
As per NIT
2 documents required · 2 mandatory
₹3,540
₹11.6 L
Office of C.E PW Region, Chh.Sambhajinagar
6 Oct 2025
19 Feb 2024
7 Mar 2024
19 Feb 2024
5 Mar 2024
19 Feb 2024
19 Feb 2024 - 28 Feb 2024
28 Feb 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART A WORK PORTION | - | - | - | - |
| 2 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material with all lifts and leads beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 1 | Cum | - | - |
| 3 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material with all lifts and leads beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means | - | Cum | - | - |
| 4 | Excavation for foundation in Hard murum including removing the excavated material with all lifts and leads beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 to 3.0m.) By Mechanical Means | - | Cum | - | - |
| 5 | Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layers of 15 cm to 20 cm including watering and compaction etc. complete. | 1 | Cum | - | - |
| 6 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper. | 1 | Sqm | - | - |
| 7 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) treatment by treating the backfill in immediate contact with foundation at the rate of 5 litres of emulsion concentrate of 1.0 percent of clorophyrifos per One Square Metre of vertical surface area covering 10 years guarantee on bond paper. | 1 | Sqm | - | - |
| 8 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the top surface of plinth filling at the rate of 5 litres of emulsion concentrate at 1.0 percent of clorophyrifos per One Square Metre of surface area covering ten years guarantee on bond paper. | 1 | Sqm | - | - |
| 9 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-I) to the soil along the external face of building by punching holes of 1.2 of 1.5 C.M. diametre about 30 -60 cm deep at 15 cm c/c as close to the wall as possible and to inject 0.5 percent of aldrin or clorophyrifos at the rate of 7.5 litres per hole and sealing the same with proper filling and covering 10 years guarantee on bond paper. | 1 | Sqm | - | - |
| 10 | Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/grit, ramming, watering etc. complete. | 1 | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_1766615.xls
BOQ Document • 0.74 MB
139857906.pdf
Tender Document • 0.07 MB
SrNo01ofTN18Tender.pdf
Tender Document • 5.34 MB
139857908.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .