Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹61.0 LAdmitted-Finance LAC FACTORY ROAD HINDPIRI RANCHI | RANCHI | RANCHI | JHARKHAND | 834001 | L1 | Admitted-Finance | ||
| 2 | L2₹74.1 L+₹13.0 L (21.3%)Admitted-Finance ADD HANUMAN MANDIR ROAD KRISHNAPURI CHUTIA DORANDA CHUTIYA RANCHI JHARKHAND 834001 | RANCHI | JHARKHAND | 834001 | L2 | Admitted-Finance | ||
| 3 | L3₹75.1 L+₹14.1 L (23.0%)Admitted-Finance BOKARO | L3 | Admitted-Finance | ||
| 4 | L4₹75.8 L+₹14.8 L (24.2%)Admitted-Finance PROP YOGESH KUMAR ANAND VIHAR HARISH PANDEY PATH | L4 | Admitted-Finance | ||
| 5 | Rejected-Technical FLAT NO 204 SAI ENCLAVE DIPATOLI NEAR KHELGAON CHOWK BARIATU RANCHI | RANCHI | - | Rejected-Technical Non Responsive |
Tender Value
₹76.8 L
EMD Value
₹1.5 L
Closing Date
2 Jul 2026, 5:00 pmClosed
EE RMC
RMC
Casting of RCC Slab under RMC Area
2026_UDD_115588_1
290/ENG 2026
Open Tender
Civil Works
Works
180 days
AS PER NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹1.5 L
1 Oct 2026
25 Jun 2026
3 Jul 2026
25 Jun 2026
2 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour for cleaning the work site before and after work etc. | |||||
| 1.01 | Labour for cleaning the work site before and after work etc. | 50 | nos | 326.85 | ₹16,342.5 |
| 2 | Reinforced cement concrete work in beams, suspended floors, foors having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staicases and spiral stair cases above plinth level up to floor five lvevel, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand (Zone-III) : 3 graded stone aggregate 20mm nominal size). | 393.2 | m3 | 6,308.87 | ₹24,80,647.68 |
| 3 | Providing Tor steel reinforcement of 8mm & 10mm dia bars as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site, cutting, bending, and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.
8mm Dia. | 12.08 | MT | 83,314.02 | ₹10,06,433.36 |
| 4 | 10mm Dia. | 24.16 | MT | 82,096.54 | ₹19,83,452.41 |
| 5 | 12mm Dia. | 4.03 | MT | 80,879.07 | ₹3,25,942.65 |
| 6 | Centering and Shuttering including strutting, propping etc and removal of from for Foundation , footing , bases of columns etc for mass concrete. | 1,811.43 | m2 | 194.5 | ₹3,52,323.14 |
| 7 | (i) Sand (Lead Upto 42 km) | 169.08 | m3 | 744.66 | ₹1,25,904.13 |
| 8 | (iv) Stone Chips (Lead 15KM) | 338.15 | m3 | 447.06 | ₹1,51,174.23 |
| 9 | Good & Service Tax (GST) | - | Rs | 0.18 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
Tendernotice_2.pdf
PDF • 1.72 MB
BOQ_156320.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .