Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹4.2 L+₹76,190.98 (22.0%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹4.4 L+₹92,242.76 (26.6%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹4.7 L+₹1.3 L (36.2%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹4.9 L+₹1.4 L (40.8%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹11.0 L
EMD Value
₹21,989
Closing Date
14 Oct 2026, 3:00 pmClosed
Executive Engineer (CD-VII)
Civil Division VII IFCD Rohini Office Complex Sector 15 Rohini Delhi
Providing Sufficient Arrangement for Performing Chhat Puja Mahotsav-2026 of Swarn JayantiPark, Near Dispensary, Near Durga Mandir and B4/122 Swarn Jyanti Vihar, Pocket-05 at Village Tikri Khurd, Narela AC-01
2026_IFC_299597_1
EE/CD-VII/NIT/2026-27/41
Open Tender
Civil Works
Percentage
15 days
Civil Division VII IFCD Rohini Office Complex Sect
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹21,989
15 Oct 2026
7 Oct 2026
14 Oct 2026
7 Oct 2026
14 Oct 2026
7 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil | 1,759 | Sqm | 130.13 | ₹2,28,898.67 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.All kinds of soil | 264 | Cum | 177.89 | ₹46,962.96 |
| 3 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) | 201 | Sqm | 358.13 | ₹71,984.13 |
| 4 | Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm) | 201 | Sqm | 117.16 | ₹23,549.16 |
| 5 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate | 237 | Sqm | 615.55 | ₹1,45,885.35 |
| 6 | Supply on hiring basic and placing of safeda ballies at site of size 80mm dia 3.00 M long including chiseling, fixing etc. complete as per direction of Engineer-in-charge. | 200 | Each | 198.18 | ₹39,636 |
| 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 264 | Cum | 196.43 | ₹51,857.52 |
| 8 | Deployment of Labour for Cleaning purpose. | 160 | Each | 1,049.35 | ₹1,67,896 |
| 9 | Supply and fixing of instruction boards with writing work (Do's & Don'ts) of size of 5'x4' in frame. | 158 | Sqm | 889 | ₹1,40,462 |
| 10 | Supply and fixing of display boards of size of 10' x 5' in frame. | 5 | Each | 1,629.25 | ₹8,146.25 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BOQ_399856.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .