Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹4.3 L+₹34,384.43 (8.63%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹4.5 L+₹47,110.68 (11.8%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹4.6 L+₹64,299.71 (16.1%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹4.6 L+₹66,209.60 (16.6%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.4 L
EMD Value
₹19,110
Closing Date
27 Jul 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
C/O LINK ROAD FROM MAIN ROAD TO NEW BLOCK OFFICE BUILDING AT BATKOOT
2026_RDPR_316931_3
enit 71 of 2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹19,110
31 Jul 2026
20 Jul 2026
28 Jul 2026
20 Jul 2026
27 Jul 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Site Clearance by way of engagement of labours,cutting of bushes, etc | - | No | - | - |
| 0.0 | Earthwork in excavation by manual means over areas exceeding 30cm in depth 1.5m in width as well as 10m^2 on plan including disposal of excavated earth upto 25m from cutting edge,disposed earth to be levelled and neatly dressed. | 1 | cum | - | - |
| 0.0 | p/laying of nallah stone soling tightly hand packed i/c carriage 5kms | - | Cum | - | - |
| 0.0 | Providing and laying in position cement concrete of specified grade Of 1:3:6 mix ( 1 cement : 3 coarse sand : 6 graded stone agg.20 mm nominal size incl the cost and carriage of cement complete Excluding cost of centering and Shuttering all work up to plinth level. | 1 | Cum | - | - |
| 0.0 | Supply of 4mm dia B.A. wire woven crates 4"X4" mesh incl. all leads,lifts,carriages upto work site complete job incl.wrapping charges | - | sft | - | - |
| 0.0 | Providing and laying in position cement concrete of specified grade Of 1:2:4 mix ( 1 cement : 2 coarse sand : 4 graded stone agg.20 mm nominal size incl the cost and carriage of cement complete Excluding cost of centering and Shuttering all work up to plinth level. | - | CUM | - | - |
| 0.0 | Centering & shuttering including strutting & propping etc in foundations footings, bases of columns etc incl. removal of forms complete job. | 1 | Cum | - | - |
| 0.0 | R.R stone massonry laid dry in wire crtes i/c carriage of stones from 4kms lead excluding cost of wire crates | - | cum | - | - |
| 0.0 | Carriage of materials by mechanical transport
Sand & Bajri at an average lead of 40 kms | 1 | cum | - | - |
| 0.0 | p/laying of 2no of rcc spun pipes of required dia 14 inch with cushion cement concrete bed and top as required | - | cum | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_1036346.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .