Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.9 L+₹11,184.45 (4.00%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹3.1 L+₹29,432.72 (10.5%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹24.8 L
EMD Value
₹49,560
Closing Date
20 Oct 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUDHIR MOHAN
GURUGRAM
Constt. of ENT Room Sound Proof
2022_HRY_242287_1
202200D31D49 1483 4A80 A1BD E40B66CE4D10693DEV
Open Tender
Civil Works
Works
90 days
Gurugram
2 documents required · 2 mandatory
₹1,000
Yes
₹49,560
Yes
12 Jan 2023
7 Oct 2022
22 Oct 2022
7 Oct 2022
20 Oct 2022
7 Oct 2022
Amount
Provision for supply of material
Electrical Items
Providing and fixing Double Door with One Sound proof door inclusive of Door Frame. The Sound proof door leaf is the part which opens and closes within a complete door structure ,using a the technology called Constrained Layer Mass Damping. The door leaf will constitute a frame all around its edge, made of rails and stiles. The material for the frame is well dried and aged coniferous hardwood which provides the strength and the density, and the drying and ageing makes it less susceptible to expansion and contraction. The outer faces on both sides of the door are made of HDF. The thicker (front-facing) board has an outward[1]protruding lip running around the edge of the door leaf. This lip which is known as a rebate, and significantly blocks the passage of air between the door leaf and the aperture frame. The thinner of the two outer HDF faces will be glued to a sheet of high density Baltic Birch plywood using acoustic glue. Adjacent to the plywood is a mass-loaded elastomers sheet held in-between a sheet of high density (c 28 kg/m³) acoustic foam and a sheet of soundboard or acoustic-board – a hermetic seal is provided in between two areas,. The frame is screwed to the wall with recommended screw tensions, in order to avoid warping of the frame. All the screw tensions will be the same. Following fixation of the aperture, the whole gap (one side to the other throughout its depth) is filled with expandible foam.
Providing and fixing Engineered Wooden flooring 12 mm top layer on 12mm cork floor with necessary T- Profile and reducer fixing with underlayer 2 mm thick high density polyurethane foam having density of approx. 90kg/cum and 2 mm thick rubber sheet as per manufacturers specification
Providing and Fixing factory made moulded PVC door (Wood free) consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 20mm x 40mm for stiles as well as top, bottom and lock rail. M.S. frame will have a coat of metal primer of approved. Door will be fixed with frame with 3 nos. stainless steel butt hinges of size 100mm x 25mm x 2mm and 50 mm long steel screws drilled suitable to pass through both the walls of the M.S. tube other hardware should be fixed with 25mm x 8mm size steel screws etc. The glass will be tempered vacuum insulating made up of two lites of 4mm (0.16`) glass. Surface #2 on the interior lite includes a double-silver Low-e coating similar to Solarban® 60 solar control, low-e glass, and the lites are separated by a non-leaded proprietary metal seal and a vacuum space. The entire VIG unit has a total thickness of 8.3mm (0.33)
Providing and Fixing factory made moulded PVC Window (Wood free) consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 20mm x 40mm for stiles as well as top, bottom and lock rail. M.S. frame will have a coat of metal primer of approved. Door will be fixed with frame with 3 nos. stainless steel butt hinges of size 100mm x 25mm x 2mm and 50 mm long steel screws drilled suitable to pass through both the walls of the M.S. tube other hardware should be fixed with 25mm x 8mm size steel screws etc. The glass will be tempered vacuum insulating made up of two lites of 4mm (0.16`) glass. Surface #2 on the interior lite includes a double-silver Low-e coating similar to Solarban® 60 solar control, low-e glass, and the lites are separated by a non-leaded proprietary metal seal and a vacuum space. The entire VIG unit has a total thickness of 8.3mm (0.33
Providing and Fixing of Acoustic block 3mm soundproof insulation membrane above the 50 mm Rock wool panels finished with Gypbord Ceiling. On the surface of Gypboard Ceiling finished with 25 mm Studio Foam.
Providing and fixing of Flocked Carpet rolls flooring having a density of 70 million fibers of nylons 6.6 per sqm firmly anchored into a waterproof backing and having an average recycled content of 20%
The Arun Co-Op Multipurpose society Ltd
The Panvi Dangi CO-OP L & C Society Ltd
The Arun Co-Op Multipurpose society Ltd
The Panvi Dangi CO-OP L & C Society Ltd
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .