Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAdmitted-Finance | ₹8.1 L | L1 | Admitted-Finance |
| 2 | L2₹8.1 LAdmitted-Finance | ₹8.1 L | L2 | Admitted-Finance |
| 3 | L3₹8.1 LAdmitted-Finance | ₹8.1 L | L3 | Admitted-Finance |
| 4 | L4₹8.3 LAdmitted-Finance | ₹8.3 L | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AQUA GASEOUS CONTROLS (INDIA) L4 | R.P. ENTERPRISES L3 | Shiva Buildtech L1 | Tushar Engineers L2 |
|---|---|---|---|---|---|---|---|
| 1.01 | Deployment of staff for operation of tubewells at WTP Dwarka. The requirement of minimum staff for O&M of 10 Nos tubewells inside WTP Dwarka. The staff will also perform the work of lower and lifting of pump sets with minor maintenance. Other associated existing equipment by deploying the following staff in all respects as minimum wages rates. PD (Skilled) staff -2 Nos & Field assistant (Unskilled) staff = 3Nos Total = 5Nos. Minor maintenance as per requirement of site for proper communication with staff in every shift including C.P at 15%. The staff details mentioned below:-
Dwarka WTP
Skilled – 1 Nos.
Unskilled – 4 Nos
Deployment period: - 184 days (w.e.f. 01-03-2026 to 31-08-2026)
Total no. of shift of Skilled staff. | 184 | Shifts | 1,69,280 ₹1,69,280 | 1,69,648 ₹1,69,648 | 1,64,312 ₹1,64,312 | 1,69,280 ₹1,69,280 |
| 1.02 | Total No. of shift of Unskilled staff. | 736 | Shifts | 5,70,400 ₹5,70,400 | 5,59,360 ₹5,59,360 | 5,40,224 ₹5,40,224 | 5,58,624 ₹5,58,624 |
| 1.03 | ESI @ 3.25% on min. wages on Sr. No. 2 | 736 | Shifts | 16,983.2 ₹16,983.2 | 16,979.52 ₹16,979.52 | 16,983.2 ₹16,983.2 | 16,979.52 ₹16,979.52 |
| 1.04 | EPF @ 13% on min. wages on Sr. No. 1 & 2 | 920 | Shifts | 69,920 ₹69,920 | 69,000 ₹69,000 | 88,551.84 ₹88,551.84 | 69,000 ₹69,000 |
Tender Value
Refer Docs
EMD Value
₹18,000
Closing Date
19 Feb 2026, 2:30 pmClosed
Rajender Kumar
WTP Nangloi
Deployment of staff for operation and minor maintenance at Tubewells inside WTP Dwarka.
2026_DJB_286885_2
NIT No. 18 (2025-26)/ EE(EM)WTP-Nangloi
Open Tender
Miscellaneous Works
WTP Nangloi
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
As per tender documents.
₹18,000
25 Feb 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
Deployment of staff for operation of tubewells at WTP Dwarka. The requirement of minimum staff for O&M of 10 Nos tubewells inside WTP Dwarka. The staff will also perform the work of lower and lifting of pump sets with minor maintenance. Other associated existing equipment by deploying the following staff in all respects as minimum wages rates. PD (Skilled) staff -2 Nos & Field assistant (Unskilled) staff = 3Nos Total = 5Nos. Minor maintenance as per requirement of site for proper communication with staff in every shift including C.P at 15%. The staff details mentioned below:- Dwarka WTP Skilled – 1 Nos. Unskilled – 4 Nos Deployment period: - 184 days (w.e.f. 01-03-2026 to 31-08-2026) Total no. of shift of Skilled staff.
Total No. of shift of Unskilled staff.
ESI @ 3.25% on min. wages on Sr. No. 2
EPF @ 13% on min. wages on Sr. No. 1 & 2
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_379997.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid