Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹6.2 L+₹5,074 (0.83%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M M Engineers L2 | M/s AADRIKA ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.01 | Disconnecting of HT supply from main panel after switching off 11 KV VCB discharging the supply. Complete dismantling of all protection relays, cable end boxes, ventpipes and other items as required | 1 | Job | 23,500 ₹27,730 | 22,500 ₹26,550 Lowest |
| 1.02 | Cleaning of transformer the help of air blowers, dry clothes and other tools & tackles as required during the execution. Cleaning of HV and LV Bushing, complete cleaning of core capsule, the works includes the tightness of the internal active parts of core-coil assembly. | 1 | Job | 25,500 ₹30,090 | 24,500 ₹28,910 Lowest |
| 1.03 | Replacement of WTI (TR 7570) of the transformer along with Protection sensors complete as per site requirement. The work includes calibration of the same at site. Make – PECON | 1 | Set | 1,12,000 ₹1,32,160 Lowest | 1,12,000 ₹1,32,160 Lowest |
| 1.04 | Replacement of Transformer surge arrestors complete in all respect. | 1 | Set | 1,07,500 ₹1,26,850 Lowest | 1,07,500 ₹1,26,850 Lowest |
| 1.05 | Replacement of all doors gasket of the transformer for complete protection. | 1 | Job | 1,05,000 ₹1,23,900 Lowest | 1,05,000 ₹1,23,900 Lowest |
| 1.06 | Checking & matching of control wiring of all protection relays and calibration of protection relays including testing the same. | 1 | Job | 45,000 ₹53,100 | 44,500 ₹52,510 Lowest |
| 1.07 | Complete Testing of the transformer for possible site tests such as:- 1. Magnetic Balance Test 2. IR Value Checks before and after the work 3. Voltage ratio Test at 440V 4. DC logic test 5. Single Phase Open circuit | 1 | Job | 56,500 ₹66,670 | 55,500 ₹65,490 Lowest |
| 1.08 | Complete Energizing of transformer by connecting of HT supply from the main 11 KV VCB Panel. | 1 | Job | 24,500 ₹28,910 | 24,000 ₹28,320 Lowest |
| 1.09 | Complete cleaning and chemically washing of muddy transformer body and painting of transformer with enamel paint. | 1 | Job | 25,800 ₹30,444 | 25,500 ₹30,090 Lowest |
Tender Value
Refer Docs
EMD Value
₹12,300
Closing Date
8 Nov 2025, 3:00 pmClosed
Executive Engineer (EM) M-1
Chitra Vihar BP Station Laxmi Nagar Delhi-110092
Repairing/ overhauling of voltamp make transformer no. 01 of capacity 630 KVA installed at Shalimar park Bps.
2025_DJB_280626_23
NIT No-10 EE (EM) M-1/ (25-26)
Open Tender
Electrical Works
Works
30 days
Chitra Vihar BP Station Laxmi Nagar Delhi-110092
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
A/c.50448339804
₹12,300
2 Dec 2025
3 Nov 2025
8 Nov 2025
3 Nov 2025
8 Nov 2025
3 Nov 2025
stage.html
html • 0.03 MB
techsummary_370615.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_370615.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .