Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical All documents are submitted as per NIT |
| 2 | Accepted-Technical | Accepted-Technical All documents are submitted as per NIT |
| 3 | Accepted-Technical | Accepted-Technical All documents are submitted as per NIT |
| 4 | Accepted-Technical | Accepted-Technical All documents are submitted as per NIT |
| 5 | Accepted-Technical PLOT NO 764 1 RR RESIDENCY 2ND FLOOR RR RESIDENCY ZENAS SCHOOL ROAD DEAD END MATRUSRI NAGAR MIYAPUR HYDERABAD 500049 | HYDERABAD | HYDERABAD | TELANGANA | 500049 | Accepted-Technical All documents are submitted as per NIT |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
24 Feb 2026, 3:00 pmClosed
AGM(CE)
3rd Floor, Haca Bhavan, Nampally, FCI, RO Hyderabad
ARMO works at MD Khammam for the year2024-25.SH.Repairsto CompoundWall
2026_FCI_897752_1
Engg/24/2025-26
Open Tender
Civil Works
120 days
MD Khammam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.8 L
3 Mar 2026
9 Feb 2026
25 Feb 2026
9 Feb 2026
24 Feb 2026
9 Feb 2026
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains
Providing and laying in position cement concrete of specified grade - All work up to plinth level :1:4:8
Providing and laying in position specified grade of reinforced cement concrete - All work up to plinth level : 1:1.5:3
Reinforced cement concrete work in walls (any thickness), including attached pilasters and buttresses
Centering and shuttering including strutting, propping etc. and removal of form for
Centering and shuttering - Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering - Walls (any thickness) including attached pilasters
Centering and shuttering - Columns, Pillars, Piers, Abutments, Posts and Struts
Centering and shuttering - Lintels, beams, plinth beams, girders and cantilevers
Centering and shuttering - Retaining walls, return walls including pilasters and buttresses
Edges of slabs and breaks in floors and walls 5.9.16.1 Under 20 cm wide
Steel reinforcement for R.C.C. work up to plinth level : Cold twisted Bars
Steel reinforcement for R.C.C. work above plinth level : Cold twisted Bars
Supplying at site Angle iron post & strut of required size
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia
6 mm cement plaster of mix : 1:3 (1 cement: 3 fine sand)
Finishing walls with Acrylic Smooth exterior paint of required shade : New work
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations
Disposal of building rubbish / malba / similar unserviceable, dismantled materials
Clearing jungle including uprooting of rank vegetation, grass, brushwood, trees and saplings
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_943632.xls
BOQ • 0.40 MB
DNIT.pdf
Tender Documents • 1.06 MB
Download all tender documents and submit your bid