Loading…
Loading…
| # | Schedule | Awarded To | Bids | Value |
|---|---|---|---|---|
| 1 | Schedule 1 | MSKRJ INDUSTRIES | 10 | ₹47.5 L |
| 2 | Schedule 2 | MSKRJ INDUSTRIES | 10 | ₹51.8 L |
| 3 | Schedule 3 | VRINDA ENGINEERS PRIVATE LIMITED | 10 | ₹7.0 L |
| 4 | Schedule 4 | VRINDA ENGINEERS PRIVATE LIMITED | 10 | ₹7.4 L |
| 5 | Schedule 5 | MSKRJ INDUSTRIES | 10 | ₹31.1 L |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
30 Dec 2025, 9:00 pmClosed
ARC OF Manufacturing and supply of Short Side Deck GBB 7202
ARC OF Manufacturing and supply of Long Side Deck GBB 7203
ARC OF Manufacturing and supply of SL Short Side End Deck GBB 7208
ARC OF Manufacturing and supply of SL Long Side End Deck GBB 7308
ARC OF Manufacturing and supply of Short Centre Deck GBB 7210
ARC OF Manufacturing and supply of Long Centre Deck GBB 7211
ARC OF Manufacturing and supply of SL Short Centre End Deck GBB 7212
ARC OF Manufacturing and supply of SL Long Centre End Deck GBB 7312
8742652
GEM/2025/B/7026808
Two Packet Bid
ARC OF Manufacturing and supply of Short Side Deck GBB
75 days
West Bengal; Kolkata
Item wise evaluation
PRODUCT_CUSTOM
7 documents required · 7 mandatory
3 yrs
₹50 L
₹50 L
60%
| Item | Delivery Location | Qty | Delivery | Spec |
|---|---|---|---|---|
| ARC OF Manufacturing and supply of Short Side Deck GBB 7202 | AR CO F Manufacturing And Kolkata Supply Of Long Side Deck | 350 | 75 days | |
| ARC OF Manufacturing and supply of Long Side Deck GBB 7203 | AR CO F Manufacturing And Kolkata Supply Of SL Short Side | 350 | 75 days | |
| ARC OF Manufacturing and supply of SL Short Side End Deck GBB 7208 | AR CO F Manufacturing And Kolkata Supply Of SL Long Side | 50 | 60 days | - |
| ARC OF Manufacturing and supply of SL Long Side End Deck GBB 7308 | AR CO F Manufacturing And Kolkata Supply Of Short Centre | 50 | 60 days | |
| ARC OF Manufacturing and supply of Short Centre Deck GBB 7210 | AR CO F Manufacturing And Kolkata Supply Of Long Centre | 200 | 60 days | |
| ARC OF Manufacturing and supply of Long Centre Deck GBB 7211 | AR CO F Manufacturing And Kolkata Supply Of SL Short Centre | 200 | 60 days | |
| ARC OF Manufacturing and supply of SL Short Centre End Deck GBB 7212 | AR CO F Manufacturing And Kolkata Supply Of SL Long Centre | 50 | 60 days | |
| ARC OF Manufacturing and supply of SL Long Centre End Deck GBB 7312 | Kolkata | 50 | 60 days |
Exempted
4 Jan 2026
20 Dec 2025
30 Dec 2025
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8742652.pdf
GEM_BID
deck_tender_report_2025-12-19-16-01-40_0698ef223f4a4c4efb4920e6c272971a.pdf
SPECIFICATION
deck_tender_report_2025-12-19-16-03-04_8434ad9196077b8f91f24f044854eba5.pdf
SPECIFICATION
deck_tender_report_2025-12-19-16-06-36_3ce1ffc63b1830fbaf66e3b03407ebec.pdf
SPECIFICATION
deck_tender_report_2025-12-19-16-07-46_d547b4fc247a943600016ff277beb40a.pdf
SPECIFICATION
deck_tender_report_2025-12-19-16-04-23_af6fed5b094cadfb4cebf09a97027289.pdf
SPECIFICATION
deck_tender_report_2025-12-19-16-05-30_2278a0f36093287a1ef7e5564b46d067.pdf
SPECIFICATION
deck_tender_report_2025-12-19-16-08-56_549164d7633ecfed8f1720d3f7375185.pdf
SPECIFICATION
deck_tender_report_2025-12-19-16-10-13_b1d482271f21500f3217dd1e204d60e8.pdf
SPECIFICATION
NIT_80a2317e-6850-4abe-bb7b1766214475672_Kumar.Satyajeet.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .