Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical qualified |
| 2 | Accepted-Technical R O SHARNOS | Accepted-Technical qualified |
| 3 | Accepted-Technical S O TSEWANG RIGZIN R O GYA | Accepted-Technical qualified |
Tender Value
₹16.6 L
EMD Value
₹33,200
Closing Date
21 Aug 2026, 12:00 pmClosed
Executive Engineer phe div leh
Executive Engineer phe div leh
Construction of chamber for borewell providing laying and fitting of 80mm GI pipe fabrication of ladder and installation of submersible pump at industrial estate phyang under SDP
2026_PWD_19350_1
E-Tender no 05 of phe div leh
Open Tender
Pumps/Motors
Percentage
30 days
leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Executive Engineer phe div leh
₹33,200
6 Oct 2026
12 Aug 2026
22 Aug 2026
12 Aug 2026
21 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including
getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as
directed by Engineer-in-charge.
All kinds of soil | 6.8 | cum | 245.94 | ₹1,673.38 |
| 2 | Ordinary Rock | 2.92 | cum | 452.99 | ₹1,320.92 |
| 3 | Dry stone pitcing (any thickness )including cost of stone | 0.36 | cum | 1,124.57 | ₹404.85 |
| 4 | Providing and laying in position plan cement concrete of specified grade including curing but excluding the cost of centering and shuttering - All work up to plinth level with ratio ( :1:4:8
)stone aggregate 20 mm nominal size including cost of bond brick in 1:6 | 0.5 | cum | 6,755.89 | ₹3,377.95 |
| 5 | Providing and laying in position cement concrete,specified grade
excluding the cost of centering, shuttering.All work up to plinth level :1:1.5:3 )
stone aggregate 20 mm nominal size | 0.5 | cum | 11,277.66 | ₹5,638.83 |
| 6 | Random Rubble masonary with nallah stone in foundation and plinth ,including cost of bond stone in 1:6 | 3.5 | cum | 6,761.3 | ₹23,664.55 |
| 7 | Steel work welded in built up sections/ framed work, including cutting, hoisting,
fixing in position and applying primer coat of approved steel primer using structural steel etc.as required in grating ,frames guard bar, ladders ,railing ,bracket ,gates &similar works.for 01 no. chamber | 125.76 | kgs | 180 | ₹22,636.8 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form
work for :Foundation . | 1.68 | sqm | 749.83 | ₹1,259.71 |
| 9 | 12 mm thick cement plaster on the rough side of single or half brick wall finished with a floating coat of neat cement of mix 1:4(1cement :4 fine sand )including cost and carriage of all material from source to site of work | 12 | sqm | 366.02 | ₹4,392.24 |
| 10 | Providing ,installation and successful commining of suitable submersible pump set make of cropton graves head capacity 105mtr Q=300LPM.WITH ELECTRICAL PANEL 415V.50CYCLE for three phase and safety cable wire 100mtr including all necessary fittings items including heigh quility metal box for control panel as per the direction of site engineer incharge incharge including carriage complete .50mm dia GI column pipe of 3mtr length with flange ended | 3 | job | 3,90,000 | ₹11,70,000 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_45959.xls
BOQ • 0.26 MB
corri207.pdf
PDF • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .