| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance 13 138 SHAKTINAGAR SHUKLAGANJ UNNAO | UNNAO | UTTAR PRADESH | 209801 | L1 | Accepted-Finance OK | |
| 2 | L2₹2.3 L+₹26,057.25 (13.1%)Accepted-Finance | L2 | Accepted-Finance OK | |
| 3 | L3₹2.3 L+₹34,921.75 (17.5%)Accepted-Finance | L3 | Accepted-Finance OK |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
11 Jul 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
se
edc-ii fatehabad
bp work
2021_DVVNL_599771_2
15/EDC-II/FT/2021-22
Open Tender
Miscellaneous Works
Lump-sum
90 days
fatehabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
dvvnl
₹2,000
13 Jul 2021
6 Jul 2021
12 Jul 2021
6 Jul 2021
11 Jul 2021
6 Jul 2021
90 days
Amount
Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance approx 40 - 70 Kms.)
PCC pole 8.5 Mtr. Long
ST pole 11 Mtr. Long
250 KVA T/F
16 KVA T/F
Line material viz. Aerial bunch conductor/Weasal conductor/Dog, G.I. earth wire, cross arm, angle, channel, insulators, clamps, stay, earth rod and other line material, if required
Erection and grouting of single pole of 8.5 Mtr. long PCC pole including fixing of accessories for HT/LT line as per RESPO manual and as per direction of Engineer Incharge.
Erection and grouting of single pole of 11 Mtr. long STP pole including fixing of accessories for HT/LT line as per RESPO manual and as per direction of Engineer Incharge.
Erection and grouting of double pole of 11 Mtr. long STP pole including fixing of accessories for HT/LT line as per RESPO manual and as per direction of Engineer Incharge.
Making HT T-Off connection on existing mains, labour, T&P and carrier etc. required for proper completion of work.
Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
Erection and grouting of stays in 1:4:8 ratio cement, sand and stone ballst, its tightning, binding, nozelling etc. of stay wire with stay and stap clamp of pole as per site requirement
Laying sagging stringing and binding and jumpering etc of following conductors for construction of 11 KV line/LT
ACSR Weasal conductor
Repairing of existing Plinth of above 5/10 Transformers by laying one layer of RCC Working in ratio 1:2:4 (Cement, coarse sand and stone grit of 20 mm gauge) 75 mm thick on top of the plinth, using M.S bars of 10 mm dia (Tor) in reinforcement including its cuttings. bending & binding in required shape.
Construction of plinth for 250 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer.
Fencing of above of above Plinth type LT S/Ss by way of 1. Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2"x1.5", 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions 2. Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts. 3. Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system. 4. Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide.
Earthing of 250 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture.
Installation of Following transformers on existing single / double pole structure /single pole & making HT/LT connection
250 KVA T/F
16 KVA T/F
Laying of LT/PVC Cable 1 x 400 / 1 x 240 sq.mm for T/F type LT S/s including fixing of Al. lug etc. as per direction of Supervising Engineer
Installation of DO Set Fuse on above erected double pole structure.
Straightening of tilted single PCC Poles in the existing lines
Opening of service cable of consummers and re-fixing the same after re-saging of conductor.
Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer
Re- sagging and stringing of existing ACSR Weasal conductor in HT /LT line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work
Fixing of LT dustribution boxes on already errected pole for giving supply to consumer by connecting consumer cables by using appropriated alumunium lugs tape N & B provided by conractor as per requirement.
CHAUHAN ENTERPRISES
M/S RAGHUVIR CONTRACTORS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .