| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.4 LAccepted-Finance | ₹15.4 L | 1 | Accepted-Finance Lowest Amount Quoted BY SELVARASU ENGINEERING CONTRACTORS |
| 2 | 2₹15.7 L+₹26,386.60 (1.71%)Rejected-Finance | ₹15.7 L+₹26,386.60 (1.71%) | 2 | Rejected-Finance Lowest Amount Quoted BY SELVARASU ENGINEERING CONTRACTORS |
| Sl No | Description | Qty | Unit | T.SIVANANTHAN L2 | SELVARASU ENGINEERING CONTRACTORS L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by departmental officers A) Hard stiff clay black cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B For Pipe line | 1,418 | M3 | 333 ₹4,72,194 | 329.5 ₹4,67,231 Lowest |
| 2.00 | Supply and Delivery of following pipes from approved company and including cost and conveyance of materials and all etc complete complying with standard specifications. 90mm dia HDPE PIPES - PE 100 AS PER IS 4984/2016 (Pre-Compounded Resin) | 2,220 | M | 255 ₹5,66,100 | 250.5 ₹5,56,110 Lowest |
| 3.00 | 80mm dia GI Pipe 'B' class ISI | 30 | M | 755 ₹22,650 | 750 ₹22,500 Lowest |
| 4.00 | Conveyance and lowering of following pipes and specials into trenches and laying and jointing with cutting and threading to grade and alignment including charges for testing of pipe line with water after the pipes are laid and jointed etc.,complete complying with std specifications 90mm dia HDPE PIPES - PE 100 AS PER IS 4984/2016 (Pre-Compounded Resin) | 2,220 | M | 22 ₹48,840 | 20 ₹44,400 Lowest |
| 5.00 | 80mm dia GI Pipe 'B' class ISI | 30 | M | 35 ₹1,050 | 31 ₹930 Lowest |
| 6.00 | Towards Jointing HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part 2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements including cost and conveyance of all other labour and material charges to site etc.,complete complying with std specifications 90mm dia HDPE PIPES - PE 100 AS PER IS 4984/2016 (Pre-Compounded Resin) | 16 | Joint | 199 ₹3,184 | 195 ₹3,120 Lowest |
| 7.00 | Refilling with excavated earth in all types of soils and subsoils including soft disintegrated rock to the full depth as may be directed except in hard rock requiring blastering and including cost and conveyance of materials and all labour charges and all etc., complete.. | 1,418 | M3 | 49 ₹69,482 | 45.8 ₹64,944.4 Lowest |
| 8.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 26 | M3 | 5,651 ₹1,46,926 | 5,604 ₹1,45,704 Lowest |
| 9.00 | Plain Cement Concrete 1:2:4 (one part of cement, two part of Crushed Stone Sand (M- Sand) and four part of coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 26 | M3 | 6,915 ₹1,79,790 | 6,895 ₹1,79,270 Lowest |
| 10.00 | Provision of 80mm dia GM Gate valve including cost and conveyance of all other labour and material charges to site etc., complete. | 10 | Each | 5,915 ₹59,150 | 5,877 ₹58,770 Lowest |
Tender Value
₹19 L
EMD Value
₹19,000
Closing Date
5 Mar 2026, 3:00 pmClosed
Executive Officer
Executive Officer Alandurai Town Panchayat
Extension of pipe line at Ward No 11 from Moongilmadai Kuttai pirivu to Moongilmadai OHT and Ward No 12 from Kalimangalam sump to OHT and Dharmaraja Kovil Street 1 2 3 4 area in Alandurai Town Panchayat
2026_DTP_668635_1
31/2026
Open Tender
Civil Works
Works
180 days
Alandurai
as per norms
2 documents required · 2 mandatory
₹0
₹19,000
Yes
29 Apr 2026
28 Feb 2026
5 Mar 2026
28 Feb 2026
5 Mar 2026
28 Feb 2026
28 Feb 2026 - 5 Mar 2026
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by departmental officers A) Hard stiff clay black cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B For Pipe line
Supply and Delivery of following pipes from approved company and including cost and conveyance of materials and all etc complete complying with standard specifications. 90mm dia HDPE PIPES - PE 100 AS PER IS 4984/2016 (Pre-Compounded Resin)
80mm dia GI Pipe 'B' class ISI
Conveyance and lowering of following pipes and specials into trenches and laying and jointing with cutting and threading to grade and alignment including charges for testing of pipe line with water after the pipes are laid and jointed etc.,complete complying with std specifications 90mm dia HDPE PIPES - PE 100 AS PER IS 4984/2016 (Pre-Compounded Resin)
80mm dia GI Pipe 'B' class ISI
Towards Jointing HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part 2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements including cost and conveyance of all other labour and material charges to site etc.,complete complying with std specifications 90mm dia HDPE PIPES - PE 100 AS PER IS 4984/2016 (Pre-Compounded Resin)
Refilling with excavated earth in all types of soils and subsoils including soft disintegrated rock to the full depth as may be directed except in hard rock requiring blastering and including cost and conveyance of materials and all labour charges and all etc., complete..
Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Plain Cement Concrete 1:2:4 (one part of cement, two part of Crushed Stone Sand (M- Sand) and four part of coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Provision of 80mm dia GM Gate valve including cost and conveyance of all other labour and material charges to site etc., complete.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_803336.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_803336.xls
BOQ • 0.23 MB
pipeline.pdf
PDF • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .