| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAdmitted-Finance | ₹4.5 L | L1 | Admitted-Finance |
| 2 | L2₹4.5 LAdmitted-Finance | ₹4.5 L | L2 | Admitted-Finance |
| 3 | L3₹4.8 LAdmitted-Finance | ₹4.8 L | L3 | Admitted-Finance |
| 4 | L4₹4.9 LAdmitted-Finance TEHSIL TRINTHA DISTRICT REASI 182311 JAMMU AND KASHMIR | REASI | JAMMU AND KASHMIR | 182311 | ₹4.9 L | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S SURAJ PARTAP SINGH L4 | M/S PARAS ELECTRICAL L1 | M/S KOHLI CONSTRUCTION L3 | M/S Hardev Singh L2 |
|---|---|---|---|---|---|---|---|
| 1.00Creation of 25 KVA Distribution Substations (Supplying including Transportation , Carriage, Erection, Testing & Commissioning Complete Job) | |||||||
| 1.01 | 11/0.433KV, 3-phase 25 KVA Distribution Transformer with Bimetallic Terminal Connectors Energy Level-2, (Aluminium wound) and with LV cable box having detachable Aluminium Gland plate | 1 | No | 1,25,000 ₹1.3 L | 1,60,000 ₹1.6 L | 80,000 ₹80,000 | 90,000 ₹90,000 |
| 1.02 | 9 mtr long Pole ST-410, SP33 | 2 | Nos | 19,800 ₹39,600 | 17,000 ₹34,000 | 16,000 ₹32,000 | 16,000 ₹32,000 |
| 1.03 | Gapless Surge Arrestor, 9kV, 10kA, LA with polymer housing, Station type | 1 | Set | 3,000 ₹3,000 | 5,500 ₹5,500 | 4,000 ₹4,000 | 6,500 ₹6,500 |
| 1.04 | 11KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, vertical type | 1 | Set | 3,500 ₹3,500 | 8,200 ₹8,200 | 8,000 ₹8,000 | 6,500 ₹6,500 |
| 1.05 | 11kV Horn Gap Fuse set 3-phase, 200 Amp | 1 | Set | 2,500 ₹2,500 | 3,500 ₹3,500 | 4,000 ₹4,000 | 6,500 ₹6,500 |
| 1.06 | 70 sqmm cable 1.1kv grade, PVC insulated stranded conductor FRLS type | 44 | Mtr | 140 ₹6,160 | 300 ₹13,200 | 120 ₹5,280 | 150 ₹6,600 |
| 1.07 | 11kV Polymeric composite Disc Insulator 12kV,minfailing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 3 | No | 250 ₹750 | 200 ₹600 | 400 ₹1,200 | 250 ₹750 |
| 1.08 | 11kV Polymeric composite Pin Insulator 12kV, 5kN,Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 3 | No | 150 ₹450 | 170 ₹510 | 300 ₹900 | 250 ₹750 |
| 1.09 | GI Channel/Angle/Flat of different sizes including clamps | 300 | Kg | 110 ₹33,000 | 120 ₹36,000 | 120 ₹36,000 | 120 ₹36,000 |
Tender Value
Refer Docs
EMD Value
₹13,920
Closing Date
22 Jan 2026, 2:00 pmClosed
Executive Engineer Electric Division JPDCL Reasi
Executive Engineer Electric Division JPDCL Reasi
Supply, Installation, Testing and Commissioning for installation of 25 KVA transformer with Poles and wires and other required material at Mata Thaka W.No 3 on Pyt Kunderdhan-B Block Hassana under PRI Scheme under the jurisdiction of Electric Divisio
2026_PDD_300774_1
e NIT 41 of 2025-26
Open Tender
Electrical Works
45 days
Reasi
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
Executive Engineer Electric Division JPDCL Reasi
₹13,920
Yes
27 Jan 2026
16 Jan 2026
23 Jan 2026
16 Jan 2026
22 Jan 2026
16 Jan 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Executive Engineer Electric Division JPDCL Reasi
Name of WorkSupply, Installation, Testing and Commissioning for installation of 25 KVA transformer with Poles and wires and other required material at Mata Thaka W.No 3 on Pyt Kunderdhan-B Block Hassana under PRI Scheme under the jurisdiction of Electric Division JPDCL Reasi
Contract No: e-NIT No. 41 of 2025-26 dt. 15.01.2026
1 Item Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE incl of all taxes & Duties In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT inclusive of all taxes and duties TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
Creation of 25 KVA Distribution Substations (Supplying including Transportation , Carriage, Erection, Testing & Commissioning Complete Job) 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 No
11/0.433KV, 3-phase 25 KVA Distribution Transformer with Bimetallic Terminal Connectors Energy Level-2, (Aluminium wound) and with LV cable box having detachable Aluminium Gland plate Item1 1 No Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 No
Laying of 11 KV on 9 meter ST Pole with ACSR Weasel Conductor (Supplying including Transportation , Carriage, Erection, Testing & Commissioning Complete Job) Item19 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 No
ST Pole 9 mtr ( ST 410 SP-33) Item20 2 No Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 No
Galvinized Nuts and Bolts Item26 1 KG Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 No
Laying of LT Line on ST Poles 8.0 Mtr long with ACSR Squirrel (Supplying including Transportation , Carriage, Erection, Testing & Commissioning Complete Job) Item32 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 No
8 mtr long Pole ST-410, SP15 Item33 9 Nos Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 No
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
sbd41.pdf
Tender Documents • 1.84 MB
BOQ_975622.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid